Introduction
It is essential that the instructions in this booklet are
strictly followed, for safe and economic operation
of
the boiler.
Current Gas Safety (Installation
&
Use) Regulations or
rules in force.
In your own interest, and that of safety, it isthe lawthat this boiler
must be installed by a registered installer,in accordance with all
national and local regulations.
This appliance must be efficiently earthed.
Supply: 230 V-50 Hz. The fusing should be 3A.
Connection must be made in a way that allows complete
isolation of the electrical supply such as a double pole
switch having a 3mm (1/8") contact separation in both
poles, or a plug and socket, serving only the boiler and
system controls. The means of isolation must be accessible
to the user after installation.
Important notes
a. This appliance must not be operated without the casing correctly
fitted and forming an adequate seal.
b.
If the boiler is installed in a compartment then the compartment
MUST NOT be used for storage purposes.
c.
The ventilation provided for the boiler during installation MUST 5.
NOT be blocked, and a check should be made periodically that 6.
the ventilation areas are free from any obstruction.
d.
If it is known or suspected thatafault exists on the boiler then it
7.
MUST NOT be used until the fault has been corrected by a
CORGI registered installer.
e.
Flammable materials must not be placed in close proximity to
the appliance. Materials giving off flammable vapours must not
be stored in the same room as the appliance.
f.
Under NO circumstances should any of the sealed components
on this appliance be used incorrectly or tampered with.
A clearance of 533mm (21") MUST beavailableatthefront of the
boiler for servicing.
The minimum clearances given below MUST be complied with
in order to maintain the safe running of the boiler.
Above the boiler 100 mm (4")
At each side of the boiler 5mm
(1/4")
Underneath the boiler 100 mm (4")
In front ofthe boiler
75 mm
(3")
If a programmer is fitted, refer to separate instructions for the
programmer before continuing.
1. CHECK THAT THE ELECTRICITY SUPPLYTOTHE BOILER
IS OFF.
2. Open the controls access door by hinging downwards.
3. Ensure that the gas inlet cock (D) is OPEN.
4. Press the overheat reset button (E), located as shown in
Frame 1.
Ensure that the mains on/off switch
(C)
is in the OFF position.
Switch ON the electricity supply to the boiler. Check that all
external controls, e.g. room thermostat etc., are ON.
Turn the boiler thermostat knob (B) to position 6 and the
mains on/off switch
(C)
to ON. After about 15seconds the
boiler will light automatically - this can be viewed through the
sight glass (A).
Set the boiler thermostat to the desired position.
CAUTION. To avoid the possibility of injury during the installation, servicing or cleaning of this
appliance care should be taken when handling edges of sheet steel components
57879