IDEAL classic FF 2 100, classic FF 240 LF, classic FF 230, classic FF 250, classic FF 240 User Manual

...
Classic FF 230 G.C. No. 41 38701 Classic FF 240 G.C. No. 41 38702 Classic FF 250 G.C. No. 41 38703 Classic FF 260 G.C. No. 41 38704 Classic FF 270 G.C. No. 41 38705 Classic FF 280 G.C. No. 41 38706 Classic FF 2100 G.C. No. 41 34971 Classic FF 240 LF G.C. No. 41 391 53
Introduction
It is essential that the instructions in this booklet are strictly followed, for safe and economic operation
the boiler.
Current Gas Safety (Installation
&
Use) Regulations or
rules in force. In your own interest, and that of safety, it isthe lawthat this boiler
must be installed by a registered installer,in accordance with all national and local regulations.
This appliance must be efficiently earthed.
Supply: 230 V-50 Hz. The fusing should be 3A. Connection must be made in a way that allows complete
isolation of the electrical supply such as a double pole switch having a 3mm (1/8") contact separation in both poles, or a plug and socket, serving only the boiler and system controls. The means of isolation must be accessible to the user after installation.
Important notes
a. This appliance must not be operated without the casing correctly
fitted and forming an adequate seal.
b.
If the boiler is installed in a compartment then the compartment MUST NOT be used for storage purposes.
c.
The ventilation provided for the boiler during installation MUST 5.
NOT be blocked, and a check should be made periodically that 6. the ventilation areas are free from any obstruction.
d.
If it is known or suspected thatafault exists on the boiler then it
7.
MUST NOT be used until the fault has been corrected by a CORGI registered installer.
e.
Flammable materials must not be placed in close proximity to the appliance. Materials giving off flammable vapours must not be stored in the same room as the appliance.
f.
Under NO circumstances should any of the sealed components on this appliance be used incorrectly or tampered with.
A clearance of 533mm (21") MUST beavailableatthefront of the boiler for servicing.
The minimum clearances given below MUST be complied with in order to maintain the safe running of the boiler.
Above the boiler 100 mm (4")
At each side of the boiler 5mm
(1/4")
Underneath the boiler 100 mm (4")
In front ofthe boiler
75 mm
(3")
If a programmer is fitted, refer to separate instructions for the programmer before continuing.
1. CHECK THAT THE ELECTRICITY SUPPLYTOTHE BOILER IS OFF.
2. Open the controls access door by hinging downwards.
3. Ensure that the gas inlet cock (D) is OPEN.
4. Press the overheat reset button (E), located as shown in Frame 1.
Ensure that the mains on/off switch
(C)
is in the OFF position.
Switch ON the electricity supply to the boiler. Check that all external controls, e.g. room thermostat etc., are ON.
Turn the boiler thermostat knob (B) to position 6 and the mains on/off switch
(C)
to ON. After about 15seconds the boiler will light automatically - this can be viewed through the sight glass (A). Set the boiler thermostat to the desired position.
CAUTION. To avoid the possibility of injury during the installation, servicing or cleaning of this appliance care should be taken when handling edges of sheet steel components
57879
Loading...
+ 2 hidden pages