IDEAL MEXICO SLIMLINE 2 BEDRS 40, RS 50, CF 40, CF 50 User Instruction

User's Instructions
IDEAL MEXICO SLIMLINE 2 BED
RS & CF 40 & 50
Ideal Mexico B.G.C. Appliance Nos.
Slimline 2 RS 40 41 349 39
Slimline 2 RS 50 41 349 40
Natural gas models only
Caution
To avoid the possibility of injury during the operation or cleaning of this appliance, care should be taken when handling the edges of sheet steel components.
2
Mexico Slimline 2 B.E.D. - User's
THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS 1994 & AMENDMENTS
1996.
It is law that all gas appliances are installed by a CORGI registered installer [identified by ] in accordance with the above regulations. Failure to install appliances correctly
could lead to prosecution. It is in your own interest, and that of safety, to ensure that the law is complied with.
It is ESSENTIAL that the instructions in this booklet are strictly followed, for safe and economic operation of the boiler.
ELECTRICITY SUPPLY
This appliance must be efficiently earthed.
Supply: 230 V ~ 50 Hz
This appliance must be connected to the supply via a doubleĀ­pole switch, fused at 3A, having a 3mm [1/8"] separation in both poles, serving only the boiler and system controls.
IMPORTANT NOTES
a. If the boiler is installed in a compartment then the
compartment MUST NOT be used for storage purposes.
b. The ventilation provided for the boiler during installation
MUST NOT be blocked, and a check should be made periodically that the ventilation areas are free from any obstruction.
c. If it is known or suspected that a fault exists on the boiler
then it MUST NOT be used until the fault has been corrected by a CORGI registered installer.
d. Flammable materials MUST NOT be placed in close
proximity to the appliance. Materials giving off flammable vapours MUST NOT be stored in the same room as the appliance.
e. Under no circumstances should any of the sealed
components on this appliance be used incorrectly or tampered with.
1
BOILER CLEARANCES
Dimensions in mm (in.)
Boiler Minimum Minimum
A or B A + B
CF 40 25 (1") 100 (4")
CF 50 25 (1") 100 (4")
RS 40 5(3/16") 10 (3/8")
RS 50 5(3/16") 10 (3/8")
MINIMUM CLEARANCES
A clearance of 535mm [21"] MUST be available at the front of the boiler for servicing.
The minimum clearances given in Frame 1 MUST be complied with, in order to maintain the safe running of the boiler.
Loading...
+ 2 hidden pages