Huawei SUN2000-2KTL-L1, SUN2000-3KTL-L1, SUN2000-3.68KTL-L1, SUN2000-4KTL-L1, SUN2000-4.6KTL-L1 User guide

...
Page 1
SUN2000-(2KTL-6KTL)-L1
User Manual
Issue 06
Date 2021-12-20
HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specied in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every eort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang Shenzhen 518129 People's Republic of China
Website: https://e.huawei.com
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. i
Page 3
SUN2000-(2KTL-6KTL)-L1 User Manual About This Document

About This Document

Purpose
This document describes the SUN2000-(2KTL-6KTL)-L1 (SUN2000 for short) in terms of its installation, electrical connection, commissioning, maintenance, and troubleshooting. Before installing and operating the SUN2000, ensure that you are familiar with the features, functions, and safety precautions provided in this document.
Intended Audience
This document is applicable to:
● Installers
● Users
Symbol Conventions
The symbols that may be found in this document are
Symbol
dened as follows.
Description
Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury.
Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury.
Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal injury.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. ii
Page 4
SUN2000-(2KTL-6KTL)-L1 User Manual About This Document
Symbol Description
Supplements the important information in the main text.
NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration.
Change History
Changes between document issues are cumulative. The latest document issue contains all the changes made in earlier issues.
Issue 06 (2021-12-20)
● Updated 7.1.3 Creating a PV Plant and a User.
● Updated 7.2.1 Energy Control.
● Updated 10.1 SUN2000 Technical
Specications.
Issue 05 (2021-08-10)
● Updated 5.6 Connecting DC Input Power Cables.
● Updated 5.7 (Optional) Connecting Battery Cables.
● Updated 5.8 (Optional) Connecting Signal Cables.
● Updated 7.1 App Commissioning.
● Updated 7.2.1.3 Battery Control.
● Updated B Device Commissioning.
● Updated D Rapid Shutdown.
Issue 04 (2021-04-01)
● Updated 5.1 Preparing Cables.
● Updated 6.2 System Power-On.
● Updated 8.3 Troubleshooting.
Issue 03 (2020-09-15)
● Updated 5.2 Connecting PE Cables.
● Updated 8.3 Troubleshooting.
Issue 02 (2020-06-09)
● Updated 4.2 Preparing Tools and Instruments.
● Updated 5.1 Preparing Cables.
● Updated 5.6 Connecting DC Input Power Cables.
● Updated 5.8 (Optional) Connecting Signal Cables.
● Updated 7.1.4 (Optional) Setting the Physical Layout of the Smart PV
Optimizers.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. iii
Page 5
SUN2000-(2KTL-6KTL)-L1 User Manual About This Document
● Updated C Resetting Password.
Issue 01 (2020-04-17)
This issue is the rst ocial release.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. iv
Page 6
SUN2000-(2KTL-6KTL)-L1 User Manual Contents

Contents

About This Document................................................................................................................ ii
1 Safety Information.................................................................................................................. 1
1.1 General Safety.......................................................................................................................................................................... 1
1.2 Personnel Requirements....................................................................................................................................................... 2
1.3 Electrical Safety........................................................................................................................................................................3
1.4 Installation Environment Requirements.......................................................................................................................... 4
1.5 Mechanical Safety................................................................................................................................................................... 4
1.6 Commissioning......................................................................................................................................................................... 6
1.7 Maintenance and Replacement..........................................................................................................................................6
2 Product Introduction...............................................................................................................7
2.1 Overview.................................................................................................................................................................................... 7
2.2 Component Description...................................................................................................................................................... 11
2.3 Label Description.................................................................................................................................................................. 12
2.4 Working Principles................................................................................................................................................................ 15
3 SUN2000 Storage...................................................................................................................17
4 System Installation............................................................................................................... 18
4.1 Checking Before the Installation..................................................................................................................................... 18
4.2 Preparing Tools and Instruments.................................................................................................................................... 19
4.3 Determining the Installation Position............................................................................................................................20
4.4 Moving a SUN2000.............................................................................................................................................................. 23
4.5 Installing a SUN2000........................................................................................................................................................... 24
4.5.1 Wall-Mounted Installation............................................................................................................................................. 25
4.5.2 Support-Mounted Installation.......................................................................................................................................27
5 Electrical Connection............................................................................................................30
5.1 Preparing Cables................................................................................................................................................................... 31
5.2 Connecting PE Cables.......................................................................................................................................................... 35
5.3 (Optional) Installing a Smart Dongle............................................................................................................................ 38
5.4 Installing a WLAN Antenna...............................................................................................................................................39
5.5 Connecting an AC Output Power Cable........................................................................................................................40
5.6 Connecting DC Input Power Cables................................................................................................................................44
5.7 (Optional) Connecting Battery Cables.......................................................................................................................... 48
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. v
Page 7
SUN2000-(2KTL-6KTL)-L1 User Manual Contents
5.8 (Optional) Connecting Signal Cables.............................................................................................................................50
6 System Commissioning........................................................................................................ 58
Verication Before Power-On........................................................................................................................................... 58
6.1
6.2 System Power-On................................................................................................................................................................. 59
7 Man-Machine Interaction....................................................................................................62
7.1 App Commissioning............................................................................................................................................................. 62
7.1.1 Downloading the FusionSolar App..............................................................................................................................62
7.1.2 (Optional) Registering an Installer Account............................................................................................................ 63
7.1.3 Creating a PV Plant and a User.................................................................................................................................... 64
7.1.4 (Optional) Setting the Physical Layout of the Smart PV Optimizers.............................................................. 64
7.2 Parameters Settings............................................................................................................................................................. 66
7.2.1 Energy Control.................................................................................................................................................................... 67
7.2.1.1 Grid-tied Point Control................................................................................................................................................. 67
7.2.1.2 Apparent Power Control on the Inverter Output Side...................................................................................... 71
7.2.1.3 Battery Control................................................................................................................................................................72
7.2.2 AFCI........................................................................................................................................................................................ 74
7.2.3 IPS Check (for Italy CEI0-21 Grid Code Only)......................................................................................................... 75
7.2.4 DRM (Australia AS4777).................................................................................................................................................77
8 System Maintenance............................................................................................................ 79
8.1 System Power-O.................................................................................................................................................................79
8.2 Routine Maintenance.......................................................................................................................................................... 80
8.3 Troubleshooting.....................................................................................................................................................................80
9 SUN2000 Disposal................................................................................................................. 93
9.1 Removing a SUN2000......................................................................................................................................................... 93
9.2 Packing a SUN2000..............................................................................................................................................................93
9.3 Disposing a SUN2000.......................................................................................................................................................... 93
10 Technical Parameters......................................................................................................... 94
10.1 SUN2000 Technical
10.2 Optimizer Technical Specications............................................................................................................................... 98
Specications................................................................................................................................ 94
A Grid Code.............................................................................................................................. 100
B Device Commissioning....................................................................................................... 104
C Resetting Password............................................................................................................ 107
D Rapid Shutdown................................................................................................................. 110
E Locating Insulation Resistance Faults............................................................................111
F Acronyms and Abbreviations............................................................................................114
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. vi
Page 8
SUN2000-(2KTL-6KTL)-L1 User Manual 1 Safety Information

1 Safety Information

1.1 General Safety

Statement
Before installing, operating, and maintaining the equipment, read this document and observe all the safety instructions on the equipment and in this document.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
Ensure that the equipment is used in environments that meet its design specications. Otherwise, the equipment may become faulty, and the resulting equipment malfunction, component damage, personal injuries, or property damage are not covered under the warranty.
Follow local laws and regulations when installing, operating, or maintaining the equipment. The safety instructions in this document are only supplements to local laws and regulations.
Huawei will not be liable for any consequences of the following circumstances:
● Operation beyond the conditions
● Installation or use in environments which are not international or national standards
● Unauthorized modications to the product or software code or removal of the product
● Failure to follow the operation instructions and safety precautions on the product and in this document
● Equipment damage due to force majeure, such as earthquakes, re, and storms
● Damage caused during transportation by the customer
● Storage conditions that do not meet the requirements specied in this document
specied in this document
specied in relevant
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 1
Page 9
D ANGER
SUN2000-(2KTL-6KTL)-L1 User Manual 1 Safety Information
General Requirements
Do not work with power on during installation.
● Do not install, use, or operate outdoor equipment and cables (including but not limited to moving equipment, operating equipment and cables, inserting connectors to or removing connectors from signal ports connected to outdoor facilities, working at heights, and performing outdoor installation) in harsh weather conditions such as lightning, rain, snow, and level 6 or stronger wind.
● After installing the equipment, remove idle packing materials such as cartons, foam, plastics, and cable ties from the equipment area.
● In the case of a and turn on the re alarm bell or make an emergency call. Do not enter the building on re in any case.
● Do not scrawl, damage, or block any warning label on the equipment.
● Tighten the screws to the specied torque using tools when installing the equipment.
● Understand the components and functioning of a grid-tied PV power system and relevant local standards.
● Repaint any paint scratches caused during equipment transportation or installation in a timely manner. Equipment with scratches cannot be exposed to an outdoor environment for a long period of time.
● Do not open the host panel of the equipment.
● You shall not reverse engineer, decompile, disassemble, adapt, add code to the device software or alter the device software in any other way, research the internal implementation of the device, obtain the device software source code, infringe on Huawei's intellectual property, or disclose any device software performance test results.
re, immediately leave the building or the equipment area,
Personal Safety
● If there is a probability of personal injury or equipment damage during operations on the equipment, immediately stop the operations, report the case to the supervisor, and take feasible protective measures.
● Use tools correctly to avoid hurting people or damaging the equipment.
● Do not touch the energized equipment, as the enclosure is hot.

1.2 Personnel Requirements

● Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
● Only
● Only qualied professionals are allowed to remove safety facilities and inspect
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 2
qualied professionals or trained personnel are allowed to install,
operate, and maintain the equipment.
the equipment.
Page 10
NO TE
D ANGER
SUN2000-(2KTL-6KTL)-L1 User Manual 1 Safety Information
● Personnel who will operate the equipment, including operators, trained personnel, and professionals, should possess the local national required qualications in special operations such as high-voltage operations, working at heights, and operations of special equipment.
● Only professionals or authorized personnel are allowed to replace the equipment or components (including software).
● Professionals: personnel who are trained or experienced in equipment operations and are clear of the sources and degree of various potential hazards in equipment installation, operation, and maintenance
● Trained personnel: personnel who are technically trained, have required experience, are aware of possible hazards on themselves in certain operations, and are able to take protective measures to minimize the hazards on themselves and other people
● Operators: operation personnel who may come in contact with the equipment, except trained personnel and professionals

1.3 Electrical Safety

Grounding
● For the equipment that needs to be grounded, install the ground cable when installing the equipment and remove the ground cable last when removing the equipment.
● Do not damage the ground conductor.
● Do not operate the equipment in the absence of a properly installed ground conductor.
● Ensure that the equipment is connected permanently to the protective ground. Before operating the equipment, check its electrical connection to ensure that it is securely grounded.
General Requirements
Before connecting cables, ensure that the equipment is intact. Otherwise, electric shocks or
● Ensure that all electrical connections comply with local electrical standards.
● Obtain approval from the local electric utility company before using the equipment in grid-tied mode.
● Ensure that the cables you prepared meet local regulations.
● Use dedicated insulated tools when performing high-voltage operations.
rst
re may occur.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 3
Page 11
D ANGER
SUN2000-(2KTL-6KTL)-L1 User Manual 1 Safety Information
AC and DC Power
Do not connect or disconnect power cables with power on. Transient contact between the core of the power cable and the conductor will generate electric arcs or sparks, which may cause
● Before making electrical connections, switch o the disconnector on the upstream device to cut o the power supply if people may contact energized components.
● Before connecting a power cable, check that the label on the power cable is correct.
● If the equipment has multiple inputs, disconnect all the inputs before operating the equipment.
re or personal injury.
Cabling
● When routing cables, ensure that a distance of at least 30 mm exists between the cables and heat-generating components or areas. This prevents damage to the insulation layer of the cables.
● Bind cables of the same type together. When routing cables of ensure that they are at least 30 mm away from each other.
● Ensure that the cables used in a grid-tied PV power system are properly connected and insulated and meet
specications.

1.4 Installation Environment Requirements

● Ensure that the equipment is installed in a well ventilated environment.
● To prevent re due to high temperature, ensure that the ventilation vents or heat dissipation system are not blocked when the equipment is running.
● Do not expose the equipment to not perform any operation on the equipment in such environments.
ammable or explosive gas or smoke. Do

1.5 Mechanical Safety

Using Ladders
dierent types,
● Use wooden or berglass ladders when you need to perform live working at heights.
● When a step ladder is used, ensure that the pull ropes are secured and the ladder is held rm.
● Before using a ladder, check that it is intact and conrm its load bearing capacity. Do not overload it.
● Ensure that the wider end of the ladder is at the bottom, or protective measures have been taken at the bottom to prevent the ladder from sliding.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 4
Page 12
SUN2000-(2KTL-6KTL)-L1 User Manual 1 Safety Information
● Ensure that the ladder is securely positioned. The recommended angle for a ladder against the oor is 75 degrees, as shown in the following gure. An angle rule can be used to measure the angle.
● When climbing a ladder, take the following precautions to reduce risks and ensure safety:
– Keep your body steady.
– Do not climb higher than the fourth rung of the ladder from the top.
– Ensure that your body's center of gravity does not shift outside the legs
of the ladder.
Drilling Holes
When drilling holes into a wall or
● Wear goggles and protective gloves when drilling holes.
● When drilling holes, protect the equipment from shavings. After drilling, clean up any shavings that have accumulated inside or outside the equipment.
Moving Heavy Objects
● Be cautious to avoid injury when moving heavy objects.
oor, observe the following safety precautions:
● When moving the equipment by hand, wear protective gloves to prevent injuries.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 5
Page 13
D ANGER
SUN2000-(2KTL-6KTL)-L1 User Manual 1 Safety Information

1.6 Commissioning

When the equipment is powered on for the rst time, ensure that professional personnel set parameters correctly. Incorrect settings may result in inconsistency with local certication and aect the normal operation of the equipment.

1.7 Maintenance and Replacement

High voltage generated by the equipment during operation may cause an electric shock, which could result in death, serious injury, or serious property damage. Prior to maintenance, power o the equipment and strictly comply with the safety precautions in this document and relevant documents.
● Maintain the equipment with sucient knowledge of this document and using proper tools and testing equipment.
● Before maintaining the equipment, power it the delayed discharge label to ensure that the equipment is powered o.
● Turn o the AC and DC switches of the SUN2000 when maintaining the electric equipment or power distribution equipment connected the SUN2000.
● Place temporary warning signs or erect fences to prevent unauthorized access to the maintenance site.
● If the equipment is faulty, contact your dealer.
● The equipment can be powered on only after all faults are do so may escalate faults or damage the equipment.
o and follow the instructions on
rectied. Failing to
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 6
Page 14
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction

2 Product Introduction

2.1 Overview

Function
Model
The SUN2000-(2KTL-6KTL)-L1 is a single-phase grid-tied string inverter that converts the DC power generated by PV strings into AC power and feeds the electricity into the power grid.
This document involves the following product models:
● SUN2000-2KTL-L1
● SUN2000-3KTL-L1
● SUN2000-3.68KTL-L1
● SUN2000-4KTL-L1
● SUN2000-4.6KTL-L1
● SUN2000-5KTL-L1
● SUN2000-6KTL-L1
Figure 2-1 Model
identier (using SUN2000-5KTL-L1 as an example)
Table 2-1 Identier description
No.
1 Product family
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 7
Meaning Value
SUN2000: grid-tied solar inverter
name
Page 15
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
No. Meaning Value
2 Power level ● 2K: The power level is 2 kW.
● 3K: The power level is 3 kW.
● 3.68K: The power level is 3.68 kW.
● 4K: The power level is 4 kW.
● 4.6K: The power level is 4.6 kW.
● 5K: The power level is 5 kW.
● 6K: The power level is 6 kW.
3 Topology TL: transformerless
4 Design code L1: residential
Networking Application
The SUN2000 applies to residential rooftop grid-tied systems. The system consists of PV strings, grid-tied solar inverters, AC switches, and power distribution units (PDUs).
Figure 2-2 Single SUN2000 scenario (dashed boxes indicate optional
conguration)
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 8
Page 16
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
Figure 2-3 SUN2000 cascading scenario (dashed boxes indicate optional
conguration)
● indicates the power ow direction, indicates the signal line, and indicates the wireless communication.
● In the SUN2000 cascading scenario, the master and slave solar inverters are both SUN2000-(2KTL-6KTL)-L1, and a maximum of three SUN2000s can be cascaded.
● In the SUN2000 cascading scenario, only one smart power sensor (G in the be connected to the master inverter.
● In the SUN2000 cascading scenario, the SUN2000s connected to the power grid must meet the local power grid requirements.
(A) PV string
(B) Smart PV optimizer (C) DC switch
gure) can
(D) SUN2000 (E) Backup (F) Residential PDU
(G) Smart Power Sensor (H) Important Load (I) Power grid
(J) Battery (K) Battery switch (L) Household load
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 9
Page 17
NO TE
CA UTION
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
(M) FusionSolar app (N) 4G Smart Dongle (O) WLAN-FE Smart
Dongle
(P) Router (Q) FusionSolar Smart
PV Management System
For detailed operations on devices in the network, see the following guides:
● SUN2000-450W-P Smart PV Optimizer Quick Guide
● LUNA2000-(5-30)-S0 User Manual
● Backup Box-(B0, B1) Quick Guide
The o-grid load output port of the Backup Box cannot be directly connected to the power grid. Otherwise, the Backup Box will be shut down due to overload.
Supported Power Grid Types
The SUN2000 supports the following power grid types: TN-S, TN-C, TN-C-S, and TT. In the TT power grid, the N-to-PE voltage must be less than 30 V.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 10
Page 18
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
Figure 2-4 Power grid types

2.2 Component Description

Appearance
Figure 2-5 Appearance
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 11
Page 19
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
(1) LED indicators (2) Front panel
(3) Hanging kit (4) Mounting bracket
(5) Heat sink (6) Ventilation valve
(7) DC switch locking screw hole
(9) DC input terminals (PV1+/PV1–) (10) DC input terminals (PV2+/PV2–)
(11) Battery terminals (BAT+/BAT–) (12) Smart Dongle port (4G/FE)
(13) Antenna port (ANT) (14) Communications port (COM)
(15) AC output port (AC) (16) Ground point
● Note a: The DC switch locking screw is used to lock the DC switch to prevent accidental startup. It is delivered with the SUN2000.
● Note b: DC input terminals PV1 and PV2 are controlled by the DC switch.

2.3 Label Description

Enclosure Labels
Table 2-2 Enclosure label description
a
(8) DC switchb (DC SWITCH)
Icon
Name Meaning
Burn warning Do not touch a
running SUN2000 because the enclosure is hot when the SUN2000 is running.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 12
Page 20
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
Icon Name Meaning
Delayed discharge ● High voltage exists
after the SUN2000 is powered on. Only qualied and trained electrical technicians are allowed to perform operations on the SUN2000.
● Residual voltage exists after the SUN2000 is powered
o. It takes 5 minutes for the SUN2000 to discharge to the safe voltage.
Refer to documentation
Reminds operators to refer to the documents delivered the SUN2000.
Grounding Indicates the position
for connecting the protective earthing (PE) cable.
Operation warning Do not remove the
connector or antenna when the SUN2000 is running.
Grounding warning Ground the SUN2000
before powering it on.
Serial number (SN) Indicates the SUN2000
SN.
Media access control (MAC) address
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 13
Indicates the MAC address.
Page 21
NO TE
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
Icon Name Meaning
Nameplate
QR code for logging in to the SUN2000 WLAN
Scan the QR code to connect to the Huawei SUN2000 WLAN (Android) or obtain the WLAN login password (iOS).
The labels are for reference only.
Figure 2-6 Nameplate (using SUN2000-5KTL-L1 as an example)
(1) Trademark and model (2) Key technical specications
(3) Compliance symbols (4) Company name and country of
origin
The nameplate gure is for reference only.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 14
Page 22
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction

2.4 Working Principles

Schematic Diagram
The SUN2000 receives inputs from up to two PV strings. Then the inputs are grouped into two MPPT routes inside the SUN2000 to track the maximum power point of the PV strings. The DC power is then converted into single-phase AC power through an inverter circuit. Surge protection is supported on both the DC and AC sides.
The SUN2000 uses a reserved battery port for energy storage expansion. Battery performs charging and discharging operations according to the battery working mode.
Figure 2-7 Schematic diagram
Working Mode
Figure 2-8 Working modes
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 15
Page 23
SUN2000-(2KTL-6KTL)-L1 User Manual 2 Product Introduction
Table 2-3 Working mode description
Working mode
Standby mode
Operating mode
Description
The SUN2000 enters Standby mode when the external environment does not meet the requirements for starting the SUN2000. In Standby mode:
● The SUN2000 continuously detects its operation status. Once the operating conditions are met, the SUN2000 enters Operating mode.
● If the SUN2000 detects a shutdown command or a fault after startup, it enters Shutdown mode.
In Operating mode:
● The SUN2000 converts DC power from PV strings into AC power and feeds the power to the power grid.
● The SUN2000 tracks the maximum power point to maximize the PV string output power.
● If the SUN2000 detects a shutdown command or a fault, it enters Shutdown mode.
● If the SUN2000 detects that the output power of PV strings does not meet the requirements for grid-tied power generation, it enters Standby mode.
Shutdown mode
● In Standby or Operating mode, if the SUN2000 detects a shutdown command or a fault, it enters Shutdown mode.
● In Shutdown mode, if the SUN2000 detects that the fault is rectied or the startup command is executed, the SUN2000 enters Standby mode.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 16
Page 24
SUN2000-(2KTL-6KTL)-L1 User Manual 3 SUN2000 Storage

3 SUN2000 Storage

The following requirements should be met if the SUN2000 is not put into use directly:
● Do not unpack the SUN2000.
● Keep the storage temperature at –40°C to +70°C and the humidity at 5%– 95% RH.
● The product should be stored in a clean and dry place and be protected from dust and water vapor corrosion.
● A maximum of eight SUN2000s can be stacked. To avoid personal injury or device damage, stack SUN2000s with caution to prevent them from falling over.
● During the storage period, check the SUN2000 periodically. (It is recommended that the check is performed every three months.) Replace the packing materials that are damaged by insects or rodents in a timely manner.
● If the SUN2000 has been stored for more than two years, it must be checked and tested by professionals before being put into use.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 17
Page 25
NO TICE
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation

4 System Installation

4.1 Checking Before the Installation

Checking Outer Packing
Before unpacking the SUN2000, check the outer packing for damage, such as holes and cracks, and check the SUN2000 model. If any damage is found or the SUN2000 model is not what you requested, do not unpack the package and contact your dealer as soon as possible.
You are advised to remove the packing materials within 24 hours before installing the SUN2000.
Checking Deliverables
After unpacking the SUN2000, check that the deliverables are intact and complete. If any item is missing or damaged, contact your dealer.
For details about the number of accessories delivered with the SUN2000, see the
List
in the packing case.
Packing
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 18
Page 26
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation

4.2 Preparing Tools and Instruments

Type Tools and Instruments
Installation
Hammer drill (with a drill bit of 8 mm)
Diagonal pliers Wire strippers Torque screwdriver
Rubber mallet Utility knife Cable cutter
Torque socket wrench Torque wrench
Crimping tool (model: PV­CZM-22100/19100)
Cable tie Vacuum cleaner Multimeter (DC
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 19
Cord end terminal crimper
Disassembly and Assembly Tool (model: PV-MS-HZ open-end wrench)
voltage measurement range ≥ 600 V DC)
Page 27
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Type Tools and Instruments
Marker Steel measuring tape Level
Hydraulic pliers Heat-shrink tubing Heat gun
Personal protective equipment (PPE)
Safety gloves Safety goggles Dust mask
- -
Safety boots

4.3 Determining the Installation Position

Basic Requirements
● The SUN2000 is protected to IP65 and can be installed indoors or outdoors.
● Do not install the SUN2000 in a place where personnel are easy to come into contact with its enclosure and heat sink, because these parts are extremely hot during operation.
● Do not install the SUN2000 near ammable or explosive materials.
● Do not install the SUN2000 at a place within children's reach.
● The SUN2000 will be corroded in salt areas, and the salt corrosion may cause re. Do not install the SUN2000 outdoors in salt areas. A salt area refers to the region within 500 meters from the coast or prone to sea breeze. The regions prone to sea breeze vary with weather conditions (such as typhoons and monsoons) or terrains (such as dams and hills).
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 20
Page 28
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Installation Environment Requirements
● The SUN2000 must be installed in a well-ventilated environment to ensure good heat dissipation.
● When the SUN2000 is installed under direct sunlight, the power may be derated due to the temperature rise.
● You are advised to install the SUN2000 in a sheltered place or install an awning over it.
Mounting Structure Requirements
● The mounting structure where the SUN2000 is installed must be
● Do not install the SUN2000 on ammable building materials.
● Ensure that the installation surface is solid enough to bear the weight of the SUN2000.
● In residential areas, do not install the SUN2000 on plaster board walls or walls made of similar materials with a weak sound insulation performance because the noise generated by the SUN2000 may interfere with residents.
re resistant.
Installation Angle Requirements
The SUN2000 can be wall-mounted or pole-mounted. The installation angle requirements are as follows:
● Install the SUN2000 vertically or at a maximum back tilt of 15 degrees to facilitate heat dissipation.
● Do not install the SUN2000 at forward tilted, excessive back tilted, side tilted, horizontal, or upside down positions.
Figure 4-1 Installation angle
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 21
Page 29
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Installation Space Requirements
● Reserve enough clearance around the SUN2000 to ensure sucient space for installation and heat dissipation.
Figure 4-2 Installation space
● When installing multiple SUN2000s, install them in horizontal mode if sucient space is available and install them in triangle mode if no sucient space is available. Stacked installation is not recommended.
Figure 4-3 Horizontal installation mode (recommended)
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 22
Page 30
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Figure 4-4 Triangle installation mode (recommended)
Figure 4-5 Stacked installation mode (not recommended)
The installation gures are for reference only and are irrelevant to the SUN2000 cascading scenario.

4.4 Moving a SUN2000

Procedure
Step 1 Hold the handles on both sides of the SUN2000, lift the SUN2000 from the
packing case, and transport it to the installation position.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 23
Page 31
CA UTION
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
● Move the SUN2000 with care to prevent device damage and personal injury.
● Do not use the wiring terminals and ports at the bottom to support any weight
of the SUN2000.
● When you need to temporally place the SUN2000 on the ground, use foam,
paper, or other protection material to prevent damage to its enclosure.
Figure 4-6 Moving a SUN2000
----End

4.5 Installing a SUN2000

Installation Precautions
Figure 4-7 shows the dimensions of mounting holes for the SUN2000.
Figure 4-7 Mounting bracket dimensions
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 24
Page 32
D ANGER
NO TE
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation

4.5.1 Wall-Mounted Installation

Procedure
Step 1 Determine the positions for drilling holes using the marking-o template. Level
the positions of mounting holes using a level, and mark the positions with a marker.
Step 2 Secure the mounting bracket.
When drilling holes, avoid the water pipes and power cables buried in the wall.
● M6x60 expansion bolts are delivered with the SUN2000. If the length and amount of the bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts by yourself.
● The expansion bolts delivered with the inverter are used for solid concrete walls. For other types of walls, prepare bolts by yourself and ensure that the wall meets the load bearing requirements of the inverter.
Figure 4-8 Expansion bolt composition
(1) Bolt
(2) Nut (3) Spring washer
(4) Flat washer (5) Expansion sleeve
● To prevent dust inhalation or contact with eyes, wear safety goggles and an dust mask when drilling holes.
● Wipe away any dust in or around the holes and measure the hole distances. If the holes are inaccurately positioned, drill holes again.
● Level the head of the expansion sleeve with the concrete wall after removing the nut, spring washer, and
at washer. Otherwise, the mounting bracket will
not be securely installed on the wall.
● Loosen the nut, spring washer, and
at washer of the expansion bolt at the
bottom.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 25
Page 33
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Figure 4-9 Installing expansion bolts
Step 3 (Optional) Install the locking screw for the DC switch.
Figure 4-10 Installing a locking screw for the DC switch
Step 4 Install the SUN2000 on the mounting bracket.
Step 5 Tighten the nuts.
Figure 4-11 Tightening nuts
Step 6 (Optional) Install an anti-theft lock.
● Prepare an anti-theft lock suitable for the lock hole diameter (Ф10 mm).
● An outdoor waterproof lock is recommended.
● Keep the key to the anti-theft lock.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 26
Page 34
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Figure 4-12 Installing an anti-theft lock
----End

4.5.2 Support-Mounted Installation

Procedure
Step 1 Determine the positions for drilling holes using the
marking-o template, and
then mark the positions with a marker.
Figure 4-13 Determining hole positions
Step 2 Drill holes using a hammer drill.
You are advised to apply anti-rust paint on the hole positions for protection.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 27
Page 35
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Figure 4-14 Drilling holes
Step 3 Secure the mounting bracket.
Figure 4-15 Secure the mounting bracket
Prepare bolt assemblies based on the hole diameter of the mounting bracket.
Step 4 (Optional) Install the locking screw for the DC switch.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 28
Page 36
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 4 System Installation
Figure 4-16 Installing a locking screw for the DC switch
Step 5 Install the SUN2000 on the mounting bracket.
Step 6 Tighten the bolt assemblies.
Figure 4-17 Tightening bolt assemblies
Step 7 (Optional) Install an anti-theft lock.
● Prepare an anti-theft lock suitable for the lock hole diameter (Ф10 mm).
● An outdoor waterproof lock is recommended.
● Keep the key to the anti-theft lock.
Figure 4-18 Installing an anti-theft lock
----End
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 29
Page 37
D ANGER
WARNING
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection

5 Electrical Connection

Precautions
Before connecting cables, ensure that the DC switch on the SUN2000 and all the switches connecting to the SUN2000 are set to OFF position. Otherwise, the high voltage of the SUN2000 may result in electric shocks.
● The device damage caused by incorrect cable connections is not covered under any warranty.
● Only certied electricians are allowed to connect cables.
● Operation personnel must wear proper PPE when connecting cables.
The cable colors shown in the electrical connection diagrams provided in this chapter are for reference only. Select cables in accordance with local cable specications (green-and­yellow cables are only used for PE).
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 30
Page 38
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection

5.1 Preparing Cables

Figure 5-1 SUN2000 cable connections (dashed boxes indicate optional
conguration)
Table 5-1 Component description
No.
A PV string ● A PV string is
B Smart PV optimizer The SUN2000-450W-P
C DC switch Recommended: a DC
Component Description Source
composed of the PV modules connected in series and works with an optimizer.
● The SUN2000 supports the input from two PV strings.
smart PV optimizer is supported.
circuit breaker with a rated voltage greater than or equal to 600 V DC and a rated current of 20 A
Prepared by the customer
Purchased from Huawei
Prepared by the customer
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 31
Page 39
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
No. Component Description Source
D Battery The SUN2000 can
connect to LUNA2000 batteries.
The SUN2000 can connect to LG-RESU batteries (LG RESU7H and RESU10H).
E Battery switch Recommended: a DC
circuit breaker with a rated voltage greater than or equal to 600 V DC and a rated current of 20 A
F
Smart Dongle
a
Supported models:
● WLAN-FE Smart Dongle: SDongleA-05
● 4G Smart Dongle: SDongleA-03
G
Smart Power Sensor
b
The SUN2000 can connect to the DDSU666­H and DTSU666-H smart power sensors.
Purchased from Huawei
Prepared by the customer
Prepared by the customer
Purchased from Huawei
Purchased from Huawei
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 32
Page 40
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
No. Component Description Source
The following third-party meters are also supported: GAVAZZI­EM340-DIN AV2 3 X S1 X08, GAVAZZI-EM111­DIN AV8 1 X S1 X08, GAVAZZI-EM112-DIN AV0 1 X S1 X08, CCS­WNC-3Y-400-MB, and CCS-WNC-3D-240-MB.
● Third-party meters support only LG batteries. The LUNA2000 batteries are not supported.
● The GAVAZZI three­phase meter has dierent power sampling methods. As a result, the power is incorrectly displayed on the NMS.
● The LUNA2000 batteries can be used only with DDSU666-H and DTSU666-H meters.
Prepared by the customer
H SUN2000 Select a proper model as
required.
I AC switch Recommended: a single-
phase AC circuit breaker with a rated voltage greater than or equal to 250 V AC and a rated current of:
● 16 A (SUN2000-2KTL­L1)
● 25 A (SUN2000-3KTL­L1 and SUN2000-3.68KTL-L1)
● 32 A (SUN2000-4KTL­L1, SUN2000-4.6KTL­L1, SUN2000-5KTL-L1, and SUN2000-6KTL­L1)
Purchased from Huawei
Prepared by the customer
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 33
Page 41
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
No. Component Description Source
● Note a: For details about how to use the 4G Smart Dongle SDongleA-03, see the
SDongleA-03 Quick Guide (4G)
FE Smart Dongle SDongleA-05, see the
FE)
. You can obtain these documents at https://support.huawei.com/
. For details about how to use the WLAN-
SDongleA-05 Quick Guide (WLAN-
enterprise by searching for models.
● Note b: The Spanish version can use only the DDSU666-H smart power sensor provided by Huawei.
Table 5-2 Cable description
No. Cable Type Recommended
Specications
1 DC input
power cable
Common outdoor PV cable in the industry
● Conductor cross­sectional area: 4–6
2
mm
● Cable outer diameter: 5.5–9 mm
2 (Optional)
Battery cable
Common outdoor PV cable in the industry
● Conductor cross­sectional area: 4–6
2
mm
● Cable outer diameter: 5.5–9 mm
3 (Optional)
Signal cable
Outdoor shielded twisted pair cable
● Conductor cross­sectional area:
– Combined
crimping of cables on the port: 0.20–0.35
2
mm
– Crimping the
cables on the port without combining them: 0.20–1
2
mm
● Cable outer diameter:
– 4-hole rubber
plug: 4–8 mm
– 2-hole rubber
plug: 8–11 mm
Source
Prepared by the customer
Prepared by the customer
Prepared by the customer
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 34
Page 42
NO TE
D ANGER
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
No. Cable Type Recommended
Source
Specications
4 AC output
power
a
cable
● Not using the PE equipotential point at the AC output port: two-core (L and N) outdoor copper cable
● Conductor cross­sectional area: 4–6
2
mm
● Cable outer diameter: 10–21 mm
Prepared by the customer
● Using the PE equipotential point at the AC output port: three-core (L, N, and PE) outdoor copper cable
5 PE cable Single-core outdoor
copper cable and M6 OT terminal
4–10 mm
2
Prepared by the customer
Note a: The minimum cross-sectional area of the cable should be selected based on the rated value of the AC fuse.
● The minimum cable diameter must comply with local cable standards.
● The factors that aect cable selection include the rated current, cable type, routing mode, ambient temperature, and maximum expected line loss.

5.2 Connecting PE Cables

Precautions
● Ensure that the PE cable is securely connected. Otherwise, electric shocks may occur.
● Do not connect the neutral wire to the enclosure as a PE cable. Otherwise, electric shocks may occur.
● The PE point at the AC output port is used only as a PE equipotential point, and cannot substitute for the PE point on the enclosure.
● It is recommended that silica gel or paint be used around the ground terminal after the PE cable is connected.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 35
Page 43
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Additional Information
The SUN2000 provides the grounding detection function. This function is used to check whether the SUN2000 is properly grounded before the SUN2000 starts, or check whether the ground cable is disconnected when the SUN2000 is running. This function is only available under limited conditions. To ensure the safe operation of the SUN2000, properly ground the SUN2000 according to the connection requirements of the ground cable. For some power grid types, if the output side of the SUN2000 is connected to an isolation transformer, ensure that the SUN2000 is properly grounded and set Grounding inspection to Disable to enable the SUN2000 to run properly. If you are not sure whether the SUN2000 is connected to such a type of power grid, contact your dealer or Huawei technical support for
● According to IEC 62109, to ensure the safe operation of the SUN2000 in the case of ground cable damage or disconnection, properly connect the ground cable of the SUN2000 and ensure that it meets at least one of the following requirements before the grounding detection function becomes invalid:
– If the PE terminal is not connected to the AC connector, use a single-core
– Use cables with the same diameter as the AC output power cable and
● In some countries and regions, the SUN2000 must have additional ground cables. Use cables with the same diameter as the AC output power cable and ground the PE terminal on the AC connector and the ground screws on the chassis.
conrmation.
outdoor copper cable with a conductor cross-sectional area of at least 10 mm2 as the PE cable on the chassis.
ground the PE terminal on the AC connector and the ground screws on the chassis.
Procedure
Step 1 Crimp an OT terminal.
● Avoid scratching the core wire when stripping a cable.
● The cavity formed after the conductor crimp strip of the OT terminal is crimped
must wrap the core wires completely. The core wires must contact the OT terminal closely.
● Wrap the wire crimping area with heat shrink tubing or insulation tape. The
heat shrink tubing is used as an example.
● When using a heat gun, protect the equipment from being scorched.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 36
Page 44
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-2 Crimping an OT terminal
(A) Core wire (B) Insulation layer (C) Heat shrink tubing
(D) Hydraulic pliers (E) Heat gun
Step 2 Connect the PE cable.
● Ensure that the PE cable is connected securely.
● You are advised to use the right ground point and reserve the other ground
point for future use.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 37
Page 45
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-3 Connecting a PE cable
----End

5.3 (Optional) Installing a Smart Dongle

Procedure
● You are advised to install the Smart Dongle before installing the WLAN antenna.
● If you prepared a Smart Dongle without a SIM card, you need to prepare a standard SIM card (size: 25 mm x 15 mm) with the capacity greater than or equal to 64 KB.
● When installing the SIM card, determine its installation direction based on the silk screen and arrow on the card slot.
● Press the SIM card in place to lock it, indicating that the SIM card is correctly installed.
● When removing the SIM card, push it inwards to eject it.
● When reinstalling the cover of the Smart Dongle, ensure that the buckles spring back in place with a click sound.
● 4G Smart Dongle (4G Communication)
Figure 5-4 Installing a 4G Smart Dongle
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 38
Page 46
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
● WLAN-FE Smart Dongle (FE Communication)
You are advised to use a CAT 5E outdoor shielded network cable (outer diameter < 9 mm; internal resistance ≤ 1.5 ohms/10 m) and shielded RJ45 connectors.
Figure 5-5 Installing a WLAN-FE Smart Dongle (FE communication)
There are two types of Smart Dongle:
● For details about how to use the WLAN-FE Smart Dongle SDongleA-05, see the
SDongleA-05 Quick Guide (WLAN-FE)
the document.
● For details about how to use the 4G Smart Dongle SDongleA-03, see the
SDongleA-03 Quick Guide (4G)
document.
The quick guide is delivered with the Smart Dongle.

5.4 Installing a WLAN Antenna

. You can also scan the QR code to obtain
. You can also scan the QR code to obtain the
Procedure
Step 1 Remove the watertight cap from the ANT port.
Step 2 Install the washer to the ANT port on the chassis.
Step 3 Install the WLAN antenna.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 39
Page 47
NO TICE
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Ensure that the WLAN antenna is installed securely.
Figure 5-6 Installing a WLAN antenna
----End

5.5 Connecting an AC Output Power Cable

Precautions
An AC switch must be installed on the AC side of the SUN2000 to ensure that the SUN2000 can be safely disconnected from the power grid.
Do not connect loads between the SUN2000 and the AC switch.
The SUN2000 is integrated with a comprehensive residual current monitoring unit. Once detecting that the residual current exceeds the threshold, the SUN2000 immediately disconnects itself from the power grid.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 40
Page 48
NO TICE
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
● If the external AC switch can perform earth leakage protection, the rated leakage action current should be greater than or equal to 100 mA.
● If multiple SUN2000s connect to the general residual current device (RCD) through their respective external AC switches, the rated leakage action current of the general RCD should be greater than or equal to the number of SUN2000s multiplied by 100 mA.
● A knife switch cannot be used as an AC switch.
Procedure
Step 1 Connect the AC output power cable to the AC connector.
● The PE point at the AC output port is used only as a PE equipotential point, and cannot substitute for the PE point on the enclosure.
● Keep the AC output power cable and the PE cable close to each other.
● Keep the AC output power cable and the DC input power cable close to each other.
● Ensure that the cable jacket is inside the connector.
● Ensure that the exposed core is totally inserted into the cable hole.
● Ensure that AC output cable is secured. Failing to do so may cause SUN2000 malfunction or damage to its AC connector.
● Ensure that the cable is not twisted.
Figure 5-7 Assembling an AC connector (three-core wire)
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 41
Page 49
NO TE
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-8 Assembling an AC connector (two-core wire)
● The cable colors shown in the gures are for reference only. Select an appropriate cable according to the local standards.
● For the core installation method and the length for cable stripping, see the instructions on the side of the plug insert.
Figure 5-9 Length for cable stripping
Step 2 Connect the AC connector to the AC output port.
Ensure that the AC connector is connected securely.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 42
Page 50
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-10 Securing an AC connector
Step 3 Check the route of the AC output power cable.
Figure 5-11 Cabling requirements
----End
Follow-up Procedure
Before removing the AC connector, ensure that the DC switch at the bottom of the SUN2000 and all the switches connected to the SUN2000 are OFF.
To remove the AC connector from the SUN2000, perform the operations in reverse order.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 43
Page 51
D ANGER
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-12 Removing a plug insert

5.6 Connecting DC Input Power Cables

Precautions
● Before connecting the DC input power cables, ensure that the DC voltage is within the safe range (lower than 60 V DC) and that the DC switch on the SUN2000 is OFF. Failing to do so may result in electric shocks.
● When the SUN2000 is running, it is not allowed to work on the DC input power cables, such as connecting or disconnecting a PV string or a PV module in a PV string. Failing to do so may cause electric shocks.
● If no PV string connects to a DC input terminal of the SUN2000, do not remove the watertight cap from the DC input terminals. Otherwise, the IP rating of the SUN2000 will be
Ensure that the following conditions are met. Otherwise, the SUN2000 may be damaged, or even a
● The DC input voltage of the SUN2000 shall not exceed maximum input voltage under any circumstance.
● The polarities of electric connections are correct on the DC input side. The positive and negative terminals of a PV string connect to corresponding positive and negative DC input terminals of the SUN2000.
● If the DC input power cables are reversely connected, do not operate the DC switch as well as positive and negative connectors immediately. Wait until the night when solar irradiance declines and the PV string current drops to below
0.5 A. Then set the DC switch to the OFF position, remove the positive and negative connectors, and correct the polarities of the DC input power cables.
aected.
re could happen.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 44
Page 52
NO TICE
CA UTION
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
● Since the output of the PV string connected to the SUN2000 cannot be grounded, ensure that the PV module output is well insulated to ground.
● During the installation of PV strings and the SUN2000, the positive or negative terminals of PV strings may be short-circuited to ground if the power cable is not properly installed or routed. In this case, an AC or DC short circuit may occur and damage the SUN2000. The caused device damage is not covered under any warranty or service agreement.
Figure 5-13 DC input terminals
Procedure
Step 1 Assemble a DC connector.
(1) Terminals of DC input 1 (2) Terminals of DC input 2
Use the Staubli MC4 positive and negative metal terminals and DC connectors delivered with the SUN2000. Using incompatible positive and negative metal terminals and DC connectors may result in serious consequences. The caused device damage is not covered under any warranty or service agreement.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 45
Page 53
NO TICE
NO TE
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
● Keep the DC input PV+ cable and PV– cable close to each other.
● Cables with high rigidity, such as armored cables, are not recommended as DC input power cables, because poor contact may be caused by the bending of the cables.
● Before assembling DC connectors, label the cable polarities correctly to ensure correct cable connections.
● After crimping the positive and negative metal terminals, pull the DC input power cables back to ensure that they are connected securely.
● Insert the crimped metal terminals of the positive and negative power cables into the appropriate positive and negative connectors. Then pull back the DC input power cables to ensure that they are connected securely.
Figure 5-14 Assembling a DC connector
● If the PV string is not congured with an optimizer, use a multimeter to measure the voltage at the DC position. The multimeter must have a DC voltage range of at least 600 V. If the voltage is a negative value, the DC input polarity is incorrect and needs correction. If the voltage is greater than 600 V, too many PV modules are congured to the same string. Remove some PV modules.
● If the PV string is congured with an optimizer, check the cable polarity by referring to the Smart PV optimizer quick guide.
Before performing Step 2, ensure that the DC switch is set to OFF.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 46
Page 54
NO TICE
NO TICE
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Step 2 Insert the positive and negative connectors into corresponding DC input terminals
on the SUN2000.
After the positive and negative connectors snap into place, pull the DC input power cables back to ensure that they are connected securely.
Figure 5-15 Connecting DC input power cables
If the DC input power cable is reversely connected and the DC switch is set to ON, do not immediately turn o the DC switch or reconnect the positive and negative connectors. Otherwise, the device may be damaged. The caused device damage is not covered under any warranty or service agreement. Wait until the night when solar irradiance declines and the PV string current drops to below 0.5 A. Then set the DC switch to the OFF position, remove the positive and negative connectors, and correct the polarities of the DC input power cables.
----End
Follow-up Procedure
Before removing the positive and negative connectors, ensure that the DC switch is OFF.
To remove the positive and negative connectors from the SUN2000, insert a disassembly tool into the notch and press the tool with an appropriate force.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 47
Page 55
D ANGER
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-16 Removing a DC connector

5.7 (Optional) Connecting Battery Cables

Prerequisites
● Battery short circuits may cause personal injury. The high transient current generated by a short circuit may release a surge of power and cause re.
● Do not connect or disconnect the battery cable when the SUN2000 is running. Failing to do so may cause electric shocks.
● Before connecting the battery cables, ensure that the DC switch on the SUN2000 and all the switches connecting to the SUN2000 are OFF, and the SUN2000 has no residual electricity. Otherwise, the high voltage of the SUN2000 and battery may result in electric shocks.
● If no battery connects to the SUN2000, do not remove the watertight cap from the battery terminal. Otherwise, the IP rating of the SUN2000 will be If a battery connects to the SUN2000, set aside the watertight cap. Reinstall the watertight cap immediately after removing the connector. The high voltage of the battery terminal may result in electric shocks.
aected.
A battery switch can be congured between the SUN2000 and the battery to ensure that the SUN2000 can be safely disconnected from the battery.
Do not connect loads between the SUN2000 and the battery.
The battery cables should be connected correctly. That is, the positive and negative terminals of the battery connect to the positive and negative battery terminals on the SUN2000 respectively. Otherwise, the SUN2000 may be damaged, or even a
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 48
re could happen.
Page 56
NO TICE
D ANGER
NO TICE
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
● During the installation of the SUN2000 and battery, the positive or negative terminal of the battery will be short-circuited to ground if power cables are not installed or routed as required. In this case, an AC or DC short circuit may occur and damage the SUN2000. The caused device damage is not covered under any warranty or service agreement.
● The cabling distance between the battery and the SUN2000 should be less than or equal to 10 meters, and within 5 meters is recommended.
Procedure
Step 1 Assemble the positive and negative connectors by referring to 5.6 Connecting DC
Input Power Cables.
● The battery voltage will result in serious injury. Use dedicated insulation tools to connect cables.
● Ensure that cables are correctly connected between the battery terminal and the battery switch, and between the battery switch and the SUN2000 battery terminal.
Cables with high rigidity, such as armored cables, are not recommended as battery cables, because poor contact may be caused by the bending of the cables.
Step 2 Insert the positive and negative connectors into corresponding battery terminals
on the SUN2000.
After the positive and negative connectors snap into place, pull the battery cables back to ensure that they are connected securely.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 49
Page 57
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-17 Connecting battery cables
----End

5.8 (Optional) Connecting Signal Cables

Context
When laying out signal cables, separate them from power cables and keep them away from strong interference sources to prevent communication interruption.
Figure 5-18 Signal cable ports
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 50
Page 58
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Table 5-3 COM port denition
No. Label Denition Single SUN2000
Scenario
1 485B1 RS485B, RS485
- Used for connecting to
dierential
signal–
2 485A1 RS485A, RS485
dierential
signal+
3 485B2 RS485B, RS485
dierential
signal–
Used for connecting to the RS485 signal ports of the battery and smart power
4 485A2 RS485A, RS485
dierential
signal+
sensor. When both battery and power meter are congured, they need be crimped to the 485B2 and 485A2 ports.
5 GND GND of the
enable
Used for connecting to GND of the enable
signal/12V/DI1/DI2. signal/12V/DI1/ DI2
SUN2000 Cascading Scenario
the solar inverters.
Used for connecting to the RS485 signal ports of the battery and smart power sensor. When both battery and smart power sensor are
congured,
they need be crimped to the 485B2 and 485A2 ports.
6 EN+ Enable signal
+/12V+
7 DI1 Digital input
signal 1+
Used for connecting to the enable signal of
the battery and the 12V positive signal.
Used for connecting to the DI1 positive
signal. It can be used for connecting to the
DRM0 scheduling signal or reserved for the
rapid shutdown signal.
8 DI2 Digital input
signal 2+
Used for connecting to the DI2 positive
signal. It can be reserved for the feedback
signal of the Backup device.
For details about how to connect signal cables, see the SUN2000L-(2KTL-5KTL) and
SUN2000-(2KTL-6KTL)-L1 Battery and Smart Power Sensor Quick Guide. You can also
scan the QR code to obtain the document.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 51
Page 59
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Communication Networking Mode
The smart power sensor and Smart Dongle must be connected to the same SUN2000.
● Single SUN2000 scenarios
Figure 5-19 Single SUN2000
Figure 5-20 Connecting cables to the smart power sensor (single SUN2000)
● SUN2000 cascading scenarios
– In-phase grid connection
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 52
Page 60
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-21 In-phase grid connection
Figure 5-22 Connecting cables to the smart power sensor (in-phase grid
connection)
– Balanced three-phase grid connection
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 53
Page 61
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-23 Balanced three-phase grid connection
Figure 5-24 Connecting cables to the smart power sensor (balanced
three-phase grid connection)
● In cascading scenarios, the inverters are required to connect to the management system through a Smart Dongle.
● In the preceding networking, the SUN2000s are cascaded and support the grid-tied point control function to achieve zero export.
● If the SUN2000s requires the grid-tied point control function, they need to be connected to a smart power sensor.
● In the scenario of balanced three-phase grid connection, if the SUN2000s requires the grid-tied point control function, they need to be connected to a three-phase smart power sensor to control the total three-phase power.
● Only one LG battery is supported, and the LG battery must be connected to the inverter equipped with the Smart Dongle.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 54
Page 62
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Procedure
Step 1 Connect signal cables to corresponding signal connectors.
● Ensure that the protection layer of the cable is in the connector. The surplus core should be cut
● Ensure that the exposed core is totally inserted into the cable hole.
● Ensure that the signal cables are connected securely.
● Ensure that the cables are not twisted.
● If multiple signal cables need to be connected to a single connector, ensure that the outer diameters of the signal cables are the same.
Figure 5-25 Crimping two signal cables
o from the protection layer.
Figure 5-26 Crimping three signal cables
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 55
Page 63
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-27 Assembling a signal connector (single SUN2000)
Figure 5-28 Assembling a signal connector (SUN2000 cascading)
Step 2 Connect the signal connector to the corresponding port.
Ensure that the signal connector is connected securely.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 56
Page 64
SUN2000-(2KTL-6KTL)-L1 User Manual 5 Electrical Connection
Figure 5-29 Securing a signal connector
----End
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 57
Page 65
SUN2000-(2KTL-6KTL)-L1 User Manual 6 System Commissioning

6 System Commissioning

6.1 Verication Before Power-On
Table 6-1 Check items and acceptance criteria
No. Check Item Acceptance Criteria
1 SUN2000 The SUN2000 is installed correctly and
securely.
2 WLAN antenna The WLAN antenna is installed
correctly and securely.
3 Cables routing Cables are routed properly as required
by the customer.
4 Cable tie Cable ties are evenly distributed and no
burr exists.
5 Grounding The PE cable is connected correctly,
securely, and reliably.
6 Switch The DC switch and all the switches
connecting to the SUN2000 are OFF.
7 Cable connection The AC output power cable, DC input
power cable, battery cable, and signal cable are connected correctly, securely, and reliably.
8 Unused terminal and port Unused terminals and ports are locked
by watertight caps.
9 Installation environment The installation space is proper, and
the installation environment is clean and tidy.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 58
Page 66
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 6 System Commissioning

6.2 System Power-On

Prerequisites
Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter to check that the AC voltage is within the allowed range.
● If the DC power supply is connected but the AC power supply is disconnected, the SUN2000 will report a Grid Loss alarm. The SUN2000 can start properly only after the power grid recovers.
● If the AC power supply is connected but the battery is not connected, the SUN2000 reports a Battery Abnormal alarm.
● If the SUN2000 is connected to LG batteries, turn on the DC switch within 1 minute after the AC switch is turned on. Otherwise, the SUN2000, connected to the power grid, will shut down and start again.
Procedure
Step 1 If the battery port of the SUN2000 is connected to a battery, turn on the auxiliary
Step 2 Turn on the AC switch between the SUN2000 and the power grid.
Step 3 (Optional) Remove the locking screw from the DC switch.
Step 4 Turn on the DC switch between the PV string and the SUN2000 if there is any.
Step 5 Turn on the DC switch at the bottom of the SUN2000.
Step 6 Observe the LEDs to check the SUN2000 operating status.
power switch of the battery and then the battery switch.
Figure 6-1 Removing the locking screw from a DC switch
Table 6-2 LED indicators 1
Category
Running indicator LED1 LED2 –
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 59
Status Description
Page 67
SUN2000-(2KTL-6KTL)-L1 User Manual 6 System Commissioning
Category Status Description
Steady green Steady green The SUN2000 is
operating in grid-tied mode.
Blinking green at long intervals (on for 1s
O The DC is on and the
AC is o.
and then o for 1s)
Blinking green at long intervals (on for 1s and then o for 1s)
Blinking green at long intervals (on for 1s and then o for 1s)
Both the DC and AC are on, and the SUN2000 is not exporting power to the power grid.
O Blinking green at long
intervals (on for 1s and
The DC is o and the AC is on.
then o for 1s)
Steady orange Steady orange The SUN2000 is
operating in the o- grid mode.
Blinking orange slowly O The DC is on, and the
SUN2000 has no output in the o-grid mode.
Blinking orange slowly Blinking orange slowly The SUN2000 is
operating in the overload in backup mode.
O O Both the DC and AC
are o.
Blinking red at short intervals (on for 0.2s and then o for 0.2s)
– There is a DC
environmental alarm, such as an alarm indicating that High String Input Voltage, String Reverse Connection, or Low Insulation Resistance.
– Blinking red at short
intervals (on for 0.2s and then o for 0.2s)
There is an AC environmental alarm, such as an alarm indicating Grid Undervoltage, Grid Overvoltage, Grid Overfrequency, or Grid Underfrequency.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 60
Page 68
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 6 System Commissioning
Category Status Description
Steady red Steady red Fault.
Communication
LED3 –
indicator
Blinking green at short intervals (on for 0.2s and then o for 0.2s)
Blinking green at long intervals (on for 1s and then o for 1s)
O There is no
If the o-grid load is overloaded, indicators LED1 and LED2 on the inverter blink orange slowly. Reduce the o-grid load power and manually clear the alarm or until the inverter is recovered. The inverter attempts to restart at an interval of 5 minutes. If the inverter fails to restart for three times, the interval changes to 2 hours. If the inverter is standby in mode, check the inverter alarms and rectify the fault.
Table 6-3 LED indicators 2
Category
Status Description
Communication is in progress.
The mobile phone is connected to the SUN2000.
communication.
o-grid
Device replacement indication
LED1 LED2 LED3 –
Steady red Steady red Steady red The SUN2000 hardware
is faulty. The SUN2000 needs to be replaced.
----End
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 61
Page 69
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction

7 Man-Machine Interaction

7.1 App Commissioning

7.1.1 Downloading the FusionSolar App

● Method 1: Access https://solar.huawei.com using the mobile phone browser
and download the latest installation package.
Figure 7-1 Download Mode
● Method 2: Search for FusionSolar on Huawei AppGallery and download the
latest installation package.
● Method 3: Scan the following QR code and download the latest installation
package.
Figure 7-2 QR code
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 62
Page 70
NO TE
NO TICE
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction

7.1.2 (Optional) Registering an Installer Account

● If you have an installer account, skip this step.
● You can register an account only using a mobile phone only in China.
● The mobile number or email address used for registration is the user name for logging in to the FusionSolar app.
Create the
rst installer account and create a domain named after the company
name.
Figure 7-3 Creating the rst installer account
To create multiple installer accounts for a company, log in to the FusionSolar app and tap Add User to create an installer account.
Figure 7-4 Creating multiple installer accounts for the same company
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 63
Page 71
NO TE
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction

7.1.3 Creating a PV Plant and a User

Figure 7-5 Creating a PV plant and a user
● In the quick settings, the grid code is set to N/A by default (automatic startup is not supported). Set the grid code based on the area where the PV plant is located.
● For details about how to use the site deployment wizard, see
Guide
. You can scan the QR code to download the quick guide.
FusionSolar App Quick

7.1.4 (Optional) Setting the Physical Layout of the Smart PV Optimizers

● If smart PV optimizers are congured for PV strings, ensure that the smart PV optimizers have been successfully connected to the SUN2000 before performing the operations in this section.
● Check that the SN labels of smart PV optimizers are correctly attached to the physical layout template.
● Take and save a photo of the physical layout template. Keep your phone parallel to the template and take a photo in landscape mode. Ensure that the four positioning points in the corners are in the frame. Ensure that each QR code is attached within the frame.
● For details about the physical layout of smart PV optimizers, see
Quick Guide
. You can scan the QR code to download the quick guide.
FusionSolar App
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 64
Page 72
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Scenario 1: Setting on the FusionSolar Server Side (Solar Inverter Connected to the Management System)
Step 1 Log in to the FusionSolar app and tap the plant name on the Home screen to
access the plant screen. Select Layout, tap , and upload the physical layout template photo as prompted.
Figure 7-6 Uploading the physical layout template photo (App)
You can also upload the physical layout template photo on the WebUI as follows: Log in to https://intl.fusionsolar.huawei.com to access the WebUI of the FusionSolar Smart PV Management System. On the Home page, click the plant name to go to the plant page. Choose Layout, click Click to Upload, and upload the physical layout template photo.
Figure 7-7 Uploading the physical layout template photo (WebUI)
Step 2 Log in to https://intl.fusionsolar.huawei.com to access the WebUI of the
FusionSolar Smart PV Management System. On the Home page, click the plant name to go to the plant page. Select Layout. Choose Generate layout, and create a physical layout as prompted. You can also manually create a physical location layout.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 65
Page 73
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Figure 7-8 Physical layout design of PV modules
----End
Scenario 2: Setting on the Solar Inverter Side (Solar Inverter Not Connected to the Management System)
Step 1 Access the Device Commissioning screen on the FusionSolar app to set the
physical layout of Smart PV Optimizers.
1. Log in to the FusionSolar app. On the Device Commissioning screen, choose Maintenance > Optimizer layout. The Optimizer layout screen is displayed.
2. Tap the blank area. The Identify image and Add PV modules buttons are displayed. You can use either of the following methods to perform operations as prompted:
– Method 1: Tap Identify image and upload the physical layout template
photo to complete the optimizer layout. (The optimizers that fail to be identied need to be manually bound.)
– Method 2: Tap Add PV modules to manually add PV modules and bind
the optimizers to the PV modules.
Figure 7-9 Physical layout design of PV modules
----End

7.2 Parameters Settings

Go to the Device Commissioning screen and set SUN2000 parameters. For details about entering the Device Commissioning screen, see B Device Commissioning.
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar APP and SUN2000 App User Manual
to obtain the document.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 66
. You can also scan the QR code
Page 74
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction

7.2.1 Energy Control

7.2.1.1 Grid-tied Point Control
Function
Limits or reduces the output power of the PV power system to ensure that the output power is within the power deviation limit.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.
Figure 7-10 Grid-tied point control
Table 7-1 Grid-tied point control
Parameter Name
Active power
Unlimited - If this parameter is set to Unlimited,
Description
the output power of the SUN2000 is not limited and the SUN2000 can connect to the power grid at the rated power.
Grid connection with zero power
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 67
Closed-loop controller ● If multiple SUN2000s are
cascaded, set this parameter to SDongle/SmartLogger.
● If there is only one SUN2000, set this parameter to Inverter.
Page 75
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Parameter Name Description
Limitation mode Total power indicates export
limitation of the total power at the grid-tied point.
Power adjustment period
Power control hysteresis
Active power output limit for fail-safe
Communication disconnection fail-safe
Species the shortest interval for a single anti-backfeeding adjustment.
Species the dead zone for adjusting the SUN2000 output power. If the power uctuation is within the power control hysteresis, the power is not adjusted.
Species the derating value of the SUN2000 active power by percentage. If the Smart Dongle does not detect any meter data or the communication between the Smart Dongle and the SUN2000 is disconnected, the Smart Dongle delivers the derating value of the SUN2000 active power by percentage.
In the SUN2000 anti-backfeeding scenario, if this parameter is set to Enable, the SUN2000 will derate according to the active power derating percentage when the communication between the SUN2000 and the Smart Dongle is disconnected for a period longer than
Communication disconnection detection time.
Communication disconnection detection time
Species the time for determining the communication disconnection between the SUN2000 and the Dongle.
This parameter is displayed when
Communication disconnection fail­safe is set to Enable.
Grid connection with limited power (kW)
Closed-loop controller ● If multiple SUN2000s are
cascaded, set this parameter to SDongle/SmartLogger.
● If there is only one SUN2000, set this parameter to Inverter.
Limitation mode Total power indicates export
limitation of the total power at the grid-tied point.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 68
Page 76
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Parameter Name Description
Maximum grid feed-in power
Power adjustment period
Power control hysteresis
Active power output limit for fail-safe
Communication disconnection fail-safe
Species the maximum active power transmitted from the grid-tied point to the power grid.
Species the shortest interval for a single anti-backfeeding adjustment.
Species the dead zone for adjusting the SUN2000 output power. If the power uctuation is within the power control hysteresis, the power is not adjusted.
Species the derating value of the SUN2000 active power by percentage. If the Smart Dongle does not detect any meter data or the communication between the Smart Dongle and the SUN2000 is disconnected, the Smart Dongle delivers the derating value of the SUN2000 active power by percentage.
In the SUN2000 anti-backfeeding scenario, if this parameter is set to Enable, the SUN2000 will derate according to the active power derating percentage when the communication between the SUN2000 and the Smart Dongle is disconnected for a period longer than
Communication disconnection detection time.
Communication disconnection detection time
Species the time for determining the communication disconnection between the SUN2000 and the Dongle.
This parameter is displayed when
Communication disconnection fail­safe is set to Enable.
Grid connection with limited power (%)
Closed-loop controller ● If multiple SUN2000s are
cascaded, set this parameter to SDongle/SmartLogger.
● If there is only one SUN2000, set this parameter to Inverter.
Limitation mode Total power indicates export
limitation of the total power at the grid-tied point.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 69
Page 77
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Parameter Name Description
PV plant capacity Species the total maximum active
power in the SUN2000 cascading scenario.
Maximum grid feed-in power
Power adjustment period
Power control hysteresis
Active power output limit for fail-safe
Communication disconnection fail-safe
Species the percentage of the maximum active power of the grid­tied point to the PV plant capacity.
Species the shortest interval for a single anti-backfeeding adjustment.
Species the dead zone for adjusting the SUN2000 output power. If the power uctuation is within the power control hysteresis, the power is not adjusted.
Species the derating value of the SUN2000 active power by percentage. If the Smart Dongle does not detect any meter data or the communication between the Smart Dongle and the SUN2000 is disconnected, the Smart Dongle delivers the derating value of the SUN2000 active power by percentage.
In the SUN2000 anti-backfeeding scenario, if this parameter is set to Enable, the SUN2000 will derate according to the active power derating percentage when the communication between the SUN2000 and the Smart Dongle is disconnected for a period longer than
Communication disconnection detection time.
Communication disconnection detection time
Species the time for determining the communication disconnection between the SUN2000 and the Dongle.
This parameter is displayed when
Communication disconnection fail­safe is set to Enable.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 70
Page 78
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Parameter Name Description
Shutdown at high feed-in
a
power
Shutdown at high feed-in power ● The default value is Disable.
● If this parameter is set to Enable, the inverter shuts down for protection when the grid­connection point power exceeds the threshold and remains in this condition for the
specied time
threshold.
Upper feed-in power threshold for inverter shutdown
● The default value is 0. This parameter species the power threshold of the grid-connection point for triggering inverter shutdown.
High feed-in power duration threshold for triggering inverter shutdown
The default value is 20. This parameter species the duration threshold of high feed-in power for triggering inverter shutdown.
● When High feed-in power
duration threshold for triggering inverter shutdown is set to 5, Shutdown at high feed-in power
takes precedence.
● When High feed-in power
duration threshold for triggering inverter shutdown is set to 20, Limited feed-in takes precedence
(when Active power control is set to Limited feed-in).
Note a: This parameter is supported only for the AS4777 grid code.
----End
7.2.1.2 Apparent Power Control on the Inverter Output Side
On the home screen, tap Settings > Power adjustment to set inverter parameters.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 71
Page 79
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Figure 7-11 Apparent power control
Table 7-2 Apparent power
Parameter Description Value Range
Maximum apparent power (kVA)
Maximum active power (kW)
The lower threshold for the maximum apparent power is the maximum active power. To lower the maximum apparent power, lower the maximum active power rst.
7.2.1.3 Battery Control
Species the output upper threshold for the maximum apparent power to adapt to the capacity requirements of standard and customized inverters.
Species the output upper threshold for the maximum active power to adapt to dierent market requirements.
[Maximum active power, S
]
max
[0.1, P
max
]
Prerequisites
The screenshots in this chapter are taken in the SUN2000 3.2.00.011 app. The app is being updated. The actual screens may vary.
Function
When the inverter connects to a battery, add the battery and set battery parameters.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 72
Page 80
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Adding a Battery
To add a battery, choose Maintenance > Subdevice management on the home screen.
Figure 7-12 Adding a battery
Parameters Settings
On the home screen, choose Power adjustment > Battery control, and set the battery parameters and working mode.
Figure 7-13 Battery control parameter setting
Parameter
Description Value Range
Working mode For details, see the description
on the app screen.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 73
● Maximum self­consumption
● Time-of-use
● Fully fed to grid
Page 81
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Parameter Description Value Range
Maximum charge power (kW)
Maximum discharge power (kW)
End-of-charge SOC (%)
End-of-discharge SOC (%)
Charge from grid If Charge from grid function is
Retain this parameter to the maximum charge power. Additional conguration is not required.
Retain this parameter to the maximum discharge power. Additional conguration is not required.
Set the charge cuto capacity. 90%–100%
Set the discharge cuto capacity.
disabled by default, comply with the grid charge requirements stipulated in local laws and regulations when this function is enabled.
● Charge: [0, Maximum charge power]
● Discharge: [0, Maximum discharge power]
0%–20% (When no PV module is congured or the PV modules have no voltage for 24 hours, the minimum value is 15%.)
● Disable
● Enable
Grid charge cuto SOC

7.2.2 AFCI

Function
If PV modules or cables are not properly connected or damaged, electric arcs may occur, which may cause re. Huawei SUN2000s provide unique arc detection in compliance with UL 1699B-2018 to ensure the safety of users' lives and property.
This function is enabled by default. The SUN2000 automatically detects arc faults. To disable this function, log in to the FusionSolar app, enter the Device
Commissioning screen, choose Settings > Feature parameters, and disable AFCI.
Clearing Alarms
The AFCI function involves the DC arc fault alarm.
The SUN2000 has the AFCI alarm automatic clearance mechanism. If an alarm is triggered for less than clears the alarm. If the alarm is triggered for ve times or more within 24 hours, the SUN2000 locks for protection. You need to manually clear the alarm on the SUN2000 so that it can work properly.
Set the grid charge cuto SOC. [20%, 100%]
ve times within 24 hours, the SUN2000 automatically
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 74
Page 82
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
You can manually clear the alarm as follows:
● Method 1: FusionSolar App
Log in to the FusionSolar app and choose My > Device Commissioning. On the Device Commissioning screen, connect and log in to the SUN2000 that generates the AFCI alarm, tap Alarm management, and tap Clear on the right of the DC arc fault alarm to clear the alarm.
Figure 7-14 Alarm management
● Method 2: FusionSolar Smart PV Management System
Log in to the FusionSolar Smart PV Management System using a non-owner account, choose Maintenance > Alarm Management, select the DC arc fault alarm, and click Clear to clear the alarm.
Figure 7-15 Clearing alarms
Switch to the owner account with PV plant management rights. On the home page, click the PV plant name to go to the PV plant page, and click OK as prompted to clear the alarm.

7.2.3 IPS Check (for Italy CEI0-21 Grid Code Only)

Function
The Italy CEI0-21 grid code requires an IPS check for the SUN2000. During the self-check, the SUN2000 checks the protection threshold and protection time of the maximum voltage over 10 min (59.S1), maximum overvoltage (59.S2), minimum undervoltage (27.S1), minimum undervoltage (27.S2), maximum overfrequency (81.S1), maximum overfrequency (81.S2), minimum underfrequency (81.S), and minimum underfrequency (81.S2).
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 75
Page 83
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Procedure
Step 1 On the home screen, choose Maintenance > IPS test to access the IPS test screen.
Step 2 Tap Start to start an IPS test. The SUN2000 detects maximum voltage over 10 min
(59.S1), maximum overvoltage (59.S2), minimum undervoltage (27.S1), minimum undervoltage (27.S2), maximum overfrequency (81.S1), maximum overfrequency (81.S2), and minimum underfrequency (81.S1), and minimum underfrequency (81.S2).
Figure 7-16 IPS test
Table 7-3 IPS test type
IPS Test Type
Maximum voltage over 10 min (59.S1)
Maximum overvoltage (59.S2)
Minimum undervoltage (27.S1)
Minimum undervoltage (27.S2)
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 76
Description
The default maximum voltage over 10 min protection threshold is 253 V (1.10 Vn), and the default protection time threshold is 3s.
The default overvoltage protection threshold is 264.5 V (1.15 Vn), and the default protection time threshold is 0.2s.
The default undervoltage protection threshold is 195.5 V (0.85 Vn), and the default protection time threshold is 1.5s.
The default undervoltage protection threshold is 34.5 V (0.15 Vn), and the default protection time threshold is 0.2s.
Page 84
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
IPS Test Type Description
Maximum overfrequency (81.S1)
Maximum overfrequency (81.S2)
Minimum underfrequency (81.S1)
Minimum underfrequency (81.S2)
Step 3 After the IPS test is complete, IPS State is displayed as IPS state success. Tap
Historical report in the upper right corner of the screen to view the IPS check
report.
----End
The default overfrequency protection threshold is 50.2 Hz, and the default protection time threshold is 0.1s.
The default overfrequency protection threshold is 51.5 Hz, and the default protection time threshold is 0.1s.
The default underfrequency protection threshold is 49.8 Hz, and the default protection time threshold is 0.1s.
The default underfrequency protection threshold is 47.5 Hz, and the default protection time threshold is 0.1s.

7.2.4 DRM (Australia AS4777)

Function
According to Australia AS 4777.2-2015, solar inverters need to support the function of demand response mode (DRM), and DRM0 is a mandatory requirement.
This function is disabled by default.
Figure 7-17 Wiring diagram for the DRM function
The demand response enabling device (DRED) is a power grid dispatch device.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 77
Page 85
SUN2000-(2KTL-6KTL)-L1 User Manual 7 Man-Machine Interaction
Table 7-4 DRM requirements
Mode Port on the SUN2000 Requirements
Procedure
Step 1 On the home page, choose Settings > Feature parameters.
Step 2 Set DRM to .
DRM0 DI1 and GND of the COM
port
Figure 7-18 DRM
● When switches S0 and S9 are switched on, the solar inverter should be turned o.
● When switch S0 is switched o, and switch S9 is switched on, the solar inverter should be grid-tied.
----End
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 78
Page 86
WARNING
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance

8 System Maintenance

8.1 System Power-O
Precautions
Procedure
Step 1 Send a shutdown command on the app.
Step 2 Turn o the AC switch between the SUN2000 and the power grid.
Step 3 Turn o the DC switch at the bottom of the SUN2000.
Step 4 (Optional) Install the locking screw for the DC switch.
After the SUN2000 powers o, the remaining electricity and heat may still cause electric shocks and body burns. Therefore, put on protective gloves and begin operating the SUN2000
Figure 8-1 Installing a locking screw for the DC switch
ve minutes after the power-o.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 79
Step 5 Turn o the DC switch between the SUN2000 and PV strings.
Step 6 (Optional) Turn o the battery switch between the SUN2000 and batteries.
----End
Page 87
CA UTION
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance

8.2 Routine Maintenance

To ensure that the SUN2000 can operate properly for a long term, you are advised to perform routine maintenance on it as described in this chapter.
Before cleaning the SUN2000, connecting cables, and maintaining the grounding reliability, power
Table 8-1 Maintenance checklist
Check Item Check Method Maintenance
o the SUN2000 (see 8.1 System Power-O for details).
Interval
System cleanliness
System running status
Electrical connection
Grounding reliability
Check periodically that the heat sinks are free from obstacles and dust.
● Check that the SUN2000 is not damaged or deformed.
● Check that the SUN2000 operates with no abnormal sound.
● Check that all SUN2000 parameters are correctly set during operation.
● Check that cables are secured.
● Check that cables are intact, and that in particular, the parts touching the metallic surface are not scratched.
● Check that unused DC input terminals, battery terminals, COM ports, ANT ports, and Smart Dongle waterproof covers are locked.
Check that ground cables are securely connected.
Once every 6 to 12 months
Once every six months
The rst inspection is 6 months after the initial commissioning. From then on, the interval can be 6 to 12 months.
The rst inspection is 6 months after the initial commissioning. From then on, the interval can be 6 to 12 months.

8.3 Troubleshooting

Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 80
Alarm severities are
dened as follows:
Page 88
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
● Major: The SUN2000 enters the shutdown mode or functions abnormally after a fault occurs.
● Minor: Some components are faulty but the SUN2000 can still connect to the power grid and generate power.
● Warning: The SUN2000 functions normally, but its output power decreases due to external factors.
Table 8-2 Common alarms and troubleshooting measures
AlarmIDAlarm Name Alarm
Possible Causes Troubleshooting
Severity
2001 High String
Input Voltage
Major The PV array is not properly
congured. Excessive PV modules are connected in series to the PV string, and therefore the open-circuit voltage exceeds the maximum SUN2000 operating voltage.
Cause ID = 1, 2
● 1: The PV1 input voltage is high.
● 2: The PV2 input voltage is high.
2002 DC Arc Fault Major The PV string power cables
arc or are in poor contact.
Cause ID = 1, 2
● 1: PV1 DC arc fault
● 2: PV2 DC arc fault
Check the serial connection conguration of the PV string and ensure that the PV string open-circuit voltage is not greater than the maximum operating voltage of the SUN2000. After the PV array conguration is corrected, the alarm disappears.
Check whether the string cables arc or are in poor contact.
2011 String Reversed Major The PV string is reversely
connected.
Cause ID = 1, 2
Check whether the PV string is reversely connected to the SUN2000. If yes, wait until the PV
2021 AFCI Check
Failure
● 1: PV1 is reversely connected.
● 2: PV2 is reversely connected.
Major The AFCI check fails.
Cause ID = 1, 2
string current decreases below 0.5 A, set DC switch to OFF, and adjust the PV string polarity.
Turn o the AC output switch and DC input switch, and then turn them on
● 1: The AFCI check circuit is abnormal.
● 2: The AFCI circuit is faulty.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 81
after 5 minutes. If the fault persists, contact your dealer or Huawei technical support.
Page 89
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Possible Causes Troubleshooting
Severity
2032 Grid Failure Major Cause ID = 1
● The power grid experiences an outage.
● The AC circuit is disconnected or the AC circuit breaker is OFF.
2033 Grid
Undervoltage
Major Cause ID = 1
The grid voltage is below the lower threshold or the low voltage duration has lasted for more than the
specied by low
value voltage ride-through (LVRT).
1. Check the AC voltage.
2. Check whether the AC circuit is disconnected or the AC circuit breaker is OFF.
1. If the alarm occurs occasionally, the power grid may be abnormal temporarily. The SUN2000 automatically recovers after detecting that the power grid becomes normal.
2. If the alarm occurs frequently, check whether the power grid voltage is within the allowed range. If no, contact the local power operator. If yes, modify the grid undervoltage protection threshold through the mobile app, SmartLogger, or network management system (NMS) with the consent of the local power operator.
3. If the fault persists for a long time, check the connection between the AC switch and the output power cable.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 82
Page 90
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2034 Grid
Major Cause ID = 1
Overvoltage
Possible Causes Troubleshooting
1. If the alarm occurs
The grid voltage exceeds the higher threshold or the high voltage has lasted for more than the value specied by high voltage ride-through (HVRT).
occasionally, the power grid may be abnormal temporarily. The SUN2000 automatically recovers after detecting that the power grid becomes normal.
2. If the alarm occurs frequently, check whether the power grid voltage is within the allowed range. If no, contact the local power operator. If yes, modify the grid overvoltage protection threshold through the mobile app, SmartLogger, or NMS with the consent of the local power operator.
3. Check whether the peak voltage of the power grid is too high. If the fault persists and cannot
rectied for a long
be time, contact the power operator.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 83
Page 91
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2036 Grid
Major Cause ID = 1
Overfrequency
Possible Causes Troubleshooting
1. If the alarm occurs
Power grid exception: The actual power grid frequency is higher than the standard requirement for the local power grid.
occasionally, the power grid may be abnormal temporarily. The SUN2000 automatically recovers after detecting that the power grid becomes normal.
2. If the alarm occurs frequently, check whether the power grid frequency is within the allowed range. If no, contact the local power operator. If yes, modify the grid overfrequency protection threshold through the mobile app, SmartLogger, or NMS with the consent of the local power operator.
2037
Grid Underfrequenc y
Major Cause ID = 1
Power grid exception: The actual power grid frequency is lower than the standard requirement for the local power grid.
1. If the alarm occurs occasionally, the power grid may be abnormal temporarily. The SUN2000 automatically recovers after detecting that the power grid becomes normal.
2. If the alarm occurs frequently, check whether the power grid frequency is within the allowed range. If no, contact the local power operator. If yes, modify the grid underfrequency protection threshold through the mobile app, SmartLogger, or NMS with the consent of the local power operator.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 84
Page 92
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2038 Unstable Grid
Major Cause ID = 1
Frequency
2039 Output
Major Cause ID = 1
Overcurrent
Possible Causes Troubleshooting
1. If the alarm occurs
Power grid exception: The actual grid frequency change rate does not comply with the local power grid standard.
occasionally, the power grid may be abnormal temporarily. The SUN2000 automatically recovers after detecting that the power grid becomes normal.
2. If the alarm occurs frequently, check whether the power grid frequency is within the allowed range. If no, contact the local power operator.
1. The SUN2000 detects its
The power grid voltage drops dramatically or the power grid is short­circuited. As a result, the SUN2000 transient output current exceeds the upper threshold and therefore the SUN2000 protection is triggered.
external working conditions in real time. After the fault is rectied, the SUN2000 automatically recovers.
2. If the alarm occurs frequently and the energy yield of the power plant, check whether the output is short-circuited. If the fault persists, contact your dealer or Huawei technical support.
aects
2040 Output DC
Component Overhigh
Major Cause ID = 1
The DC component of the SUN2000 output current exceeds the specied upper threshold.
1. The SUN2000 detects its external working conditions in real time. After the fault is rectied, the SUN2000 automatically recovers.
2. If the alarm occurs frequently, contact your dealer or Huawei technical support.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 85
Page 93
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2051 Abnormal
Major Cause ID = 1 Residual Current
2062 Low Insulation
Major Cause ID = 1 Resistance
Possible Causes Troubleshooting
1. If the alarm occurs
The insulation impedance of the input side to PE decreases when the SUN2000 is operating.
occasionally, the external circuit may be abnormal temporarily. The SUN2000 automatically recovers after the fault is
rectied.
2. If the alarm occurs frequently or persists, check whether the impedance between the PV string and the ground is too low.
1. Check the output
● A short circuit occurs between the PV array and the ground.
impedance of the PV array to ground. If there is a short circuit or lack of insulation, rectify it.
● The ambient air of the PV array is damp and the insulation between the PV array and the ground is poor.
2. Check that the PE cable of the SUN2000 is correctly connected.
3. If the impedance is lower than the protection threshold in rainy and cloudy days, set Insulation
resistance protection
using the mobile app, SmartLogger, or NMS. Current insulation resistance: x MΩ, possible short circuit position: x%. The short circuit position is valid for a single PV string. If there are multiple PV strings, check the PV strings one by one. For details, see E Locating
Insulation Resistance Faults.
specied
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 86
Page 94
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Possible Causes Troubleshooting
Severity
2063 OvertemperatureMinor Cause ID = 1
● The SUN2000 is installed in a place with poor ventilation.
● The ambient temperature is higher than the upper threshold.
● The SUN2000 is not working properly.
● Check the ventilation and ambient temperature of the SUN2000 installation position.
● If the ventilation is poor or the ambient temperature exceeds the upper threshold, improve the ventilation and heat dissipation.
● If the ventilation and ambient temperature both meet requirements, contact your dealer or Huawei technical support.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 87
Page 95
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Possible Causes Troubleshooting
Severity
2064 Device Fault Major An unrecoverable fault has
occurred on a circuit inside the SUN2000.
Cause ID = 1–12
● 1: The Boost input is short-circuited.
● 2: The Boost input experiences overcurrent.
● 3: The control circuit is faulty.
● 4: The inverter circuit is abnormal.
● 5: The residual current sensor is faulty.
● 6: The temperature detection fails.
● 7: EEPROM read/write fails.
● 8: The auxiliary power supply is abnormal.
● 9: The grid-tied relay is abnormal.
● 10: The DC bus experiences overvoltage.
● 11: The DC bus experiences undervoltage.
● 12: The DC bus experiences voltage imbalance.
Turn
o the AC output switch and DC input switch, and then turn them on after 5 minutes. If the fault persists, contact your dealer or Huawei technical support.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 88
Page 96
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2065 Upgrade Failed
Minor The upgrade does not or Version Mismatch
61440 Monitoring
Minor Cause ID = 1 Unit Faulty
Possible Causes Troubleshooting
1. Perform an upgrade
complete normally.
Cause ID = 1–4, 7
● 1. The software and hardware of the main controller do not match.
again.
2. If the upgrade fails for multiple times, contact your dealer or Huawei technical support.
● 2: The main and auxiliary controller software versions do not match.
● 3: The monitoring and power controller software versions do not match.
● 4: The upgrade fails.
● 7: The optimizer upgrade fails.
Turn o the AC output
● The ash memory is
insucient.
switch and DC input switch, and then turn them on after 5 minutes. If the fault
● The ash memory has bad sectors.
persists, replace the monitoring board or contact your dealer Huawei technical support.
2067 Faulty Power
Collector
Major Cause ID = 1
The smart power sensor is disconnected.
1. Check that the congured power meter model is the same as the actual model.
2. Check that the communications parameters for the smart power sensors are the same as the SUN2000 RS485
congurations.
3. Check whether the smart power sensor is powered on and whether the RS485 communications cable is connected.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 89
Page 97
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2068 Battery
Minor The battery is faulty,
Abnormal
Possible Causes Troubleshooting
1. If the battery fault
disconnected, or the battery circuit breaker is OFF when the battery is running.
Cause ID = 1–4
● 1: The battery communication is abnormal.
indicator is steady on or blinking, contact the battery supplier.
2. Check that the battery enabling/power/ communications cable is correctly installed, and that the communications
● 2: The battery port experiences overcurrent.
● 3. The battery enabling cable is not properly connected.
● 4: The battery port voltage is abnormal.
parameters are the same as the SUN2000 RS485
congurations.
3. Check that the auxiliary power switch on the battery is set to ON.
4. Send a shutdown command on the app.
o the AC output
Turn switch, DC input switch, and battery switch. Then turn on the battery switch, AC output switch, and DC input switch in sequence after 5 minutes.
5. If the fault persists, contact your dealer or Huawei technical support.
2070
Active Islanding Major Cause ID = 1
When the power grid experiences an AC power
Check that the grid connection voltage of the SUN2000 is normal.
outage, the SUN2000 detects islanding proactively.
2077 O-grid output
overload
Major Cause ID = 1/2
The output is overloaded or short-circuited.
1. Check whether the device output is short­circuited.
2. Check whether the device load conguration exceeds the rated value.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 90
Page 98
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Severity
2080 Abnormal PV
Major PV module conguration
Module
Conguration
Possible Causes Troubleshooting
Check whether the total does not meet requirements, or the PV module output is reversely connected or short­circuited.
Cause ID = 2, 3, 6, 7, 8, 9
number of PV modules,
number of PV modules in a
string, and number of PV
strings meet requirements
and whether the PV
module output is reversely
connected.
● 2: The PV string power
or the number of optimizers connected in series in a PV string exceeds the upper threshold.
● ID2: Check whether the PV string power or the number of PV modules connected in series in the PV string exceeds the upper threshold.
● 3: The number of optimizers connected in series in a PV string is less than the lower threshold, the PV string output is reversely connected, or the output of some optimizers in the PV string is reversely connected.
● 6: Under the same MPPT, the number of optimizers connected in series in PV strings connected in parallel is dierent, or the output of some optimizers in PV strings is reversely connected.
● 7: The optimizer installation position is changed, or PV strings are combined or exchanged.
● 8: The sunlight is weak or changes abnormally.
● 9: In partial conguration scenarios, the PV string voltage exceeds the inverter input voltage
specications.
● ID3:
1. Check whether the number of optimizers connected in series in the PV string is below the lower threshold.
2. Check whether the PV string output is reversely connected.
3. Check whether the PV string output is disconnected.
4. Check whether the optimizer output extension cable is correct (positive connector at one end and negative connector at the other).
● ID6:
1. Check whether the number of optimizers connected in series in the PV strings connected in parallel under the same MPPT is the same.
2. Check whether the optimizer output extension cable is correct (positive connector at one end and negative connector at the other).
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 91
Page 99
NO TE
SUN2000-(2KTL-6KTL)-L1 User Manual 8 System Maintenance
AlarmIDAlarm Name Alarm
Possible Causes Troubleshooting
Severity
2081 Optimizer Fault Warning Cause ID = 1
An optimizer is faulty.
● ID7: When the sunlight is normal, perform the optimizer search function again.
● ID8: When the sunlight is normal, perform the optimizer search function again.
● ID9: Calculate the PV string voltage based on the number of PV modules in the PV string and check whether the PV string voltage exceeds the upper threshold of the inverter input voltage.
Go to the optimizer information screen to view the fault details.
2082 Grid-tied/O-
grid Controller Abnormal
Major Cause ID = 1
The inverter fails to communicate with the Smart Backup Box.
Cause ID = 2
An unrecoverable fault occurs on a circuit inside the Smart Backup Box.
1. Send a shutdown command on the app. Turn o the AC output switch, DC input switch, and battery switch.
2. Check whether the power cable and RS485 cable between the Smart Backup Box and the inverter are normal.
3. After 5 minutes, turn on the battery switch, AC output side, AC output switch, and DC input switch.
4. If the alarm persists, contact your dealer or Huawei technical support.
Contact your dealer if all failure analysis procedures listed above are completed and the fault still exists.
Issue 06 (2021-12-20) Copyright © Huawei Technologies Co., Ltd. 92
Page 100
SUN2000-(2KTL-6KTL)-L1 User Manual 9 SUN2000 Disposal

9 SUN2000 Disposal

9.1 Removing a SUN2000

Procedure
Step 1 Power
Step 2 Disconnect all cables from the SUN2000, including signal cables, DC input power
cables, battery cables, AC output power cables, and PE cables.
Step 3 Remove the WLAN antenna or the Smart Dongle from the SUN2000.
Step 4 Remove the SUN2000 from the mounting bracket.
Step 5 Remove the mounting bracket.
----End
o the SUN2000. For details, see 8.1 System Power-O.

9.2 Packing a SUN2000

● If the original packaging is available, put the SUN2000 inside it and then seal it using adhesive tape.
● If the original packaging is unavailable, put the SUN2000 inside a suitable hard carton and seal it properly.

9.3 Disposing a SUN2000

If the SUN2000 service life expires, dispose the SUN2000 according to the local disposal rules for electrical equipment and electronic component waste.