Huawei PRRU3901B2B5 User Manual

DBS3900 LampSite
Installation Guide
Issue 06
Date 2015-10-30
HUAWEI TECHNOLOGIES CO., LTD.
Copyright © Huawei Technologies Co., Ltd. 2015. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang Shenzhen 518129 People's Republic of China
Website: http://www.huawei.com
Email: support@huawei.com
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
i
DBS3900 LampSite Installation Guide
Overview

About This Document

About This Document
This document describes how to install the modules and cables for the BBU, DCU, RHUB, pRRU3901, pRRU3902, and pRRU3907 indoors. It also provides checklists for hardware installation.
NOTE
l Unless otherwise specified, BBU in this document refers to BBU3900 and BBU3910.
l DCU3900 in this document refers to DCU.
l RHUB3908 in this document refers to RHUB.
l Unless otherwise specified, pRRU in this document refers to pRRU3901, pRRU3902, and pRRU3907.
Product Version
The following table lists the product version related to this document.
Product Name
DBS3900 LampSite
Intended Audience
This document is intended for:
l BTS installation personnel
Solution Version Product Version
l SRAN10.1 and later versions
l RAN17.1 and later versions
l eRAN8.1 and later versions
l eRAN TDD 8.1 and later
versions
V100R010C10 and later versions
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii
DBS3900 LampSite Installation Guide Contents

Contents

About This Document.....................................................................................................................ii
1 Changes in DBS3900 LampSite Installation Guide................................................................1
2 Installation Preparations..............................................................................................................4
2.1 Reference Documents.....................................................................................................................................................5
2.2 Preparing Tools and Instruments.................................................................................................................................... 5
2.3 Requirements for Installation Personnel.........................................................................................................................6
3 Unpacking and Checking............................................................................................................ 7
4 Installing a BBU.............................................................................................................................9
5 Installing a DCU.......................................................................................................................... 10
6 Installing an RHUB.....................................................................................................................11
6.1 Information About the Installation............................................................................................................................... 12
6.1.1 Installation Scenarios.................................................................................................................................................12
6.1.2 Installation Clearance Requirements......................................................................................................................... 17
6.1.3 Installation Environment........................................................................................................................................... 19
6.2 Installation Process....................................................................................................................................................... 21
6.3 Installing an RHUB...................................................................................................................................................... 22
6.3.1 Installing an RHUB in a 19-Inch Cabinet or Rack....................................................................................................22
6.3.2 Installing an RHUB in a 19-Inch Shelf..................................................................................................................... 25
6.3.3 Installing an RHUB on a Wall................................................................................................................................... 28
6.4 Installing RHUB Cables............................................................................................................................................... 32
6.4.1 Requirements for Cable Layout.................................................................................................................................32
6.4.2 Cable List...................................................................................................................................................................35
6.4.3 Cable Connections.....................................................................................................................................................36
6.4.4 Cable Installation Process..........................................................................................................................................37
6.4.5 Installing PGND Cable..............................................................................................................................................38
6.4.6 Installing Ethernet Cable........................................................................................................................................... 39
6.4.7 Installing CRPI Optical Cables..................................................................................................................................41
6.4.8 Installing Alarm Cable (Optional).............................................................................................................................44
6.4.9 Installing Power Cable...............................................................................................................................................45
6.5 Checking the RHUB Hardware Installation................................................................................................................. 46
6.6 Power-on Check on an RHUB......................................................................................................................................48
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iii
DBS3900 LampSite Installation Guide Contents
7 Installing a pRRU3901................................................................................................................ 50
7.1 Information About the Installation............................................................................................................................... 51
7.1.1 Product Family.......................................................................................................................................................... 51
7.1.2 Installation Scenario.................................................................................................................................................. 51
7.1.3 Space Requirements.................................................................................................................................................. 55
7.1.4 Installation Environment Requirements.................................................................................................................... 56
7.2 Obtaining the MAC Address (Optional) ..................................................................................................................... 57
7.3 Installation Process....................................................................................................................................................... 57
7.4 Installing a pRRU3901................................................................................................................................................. 58
7.4.1 pRRU3901 Mounting Kits.........................................................................................................................................59
7.4.2 Installing a pRRU3901 on a Wall.............................................................................................................................. 60
7.4.3 Installing a pRRU3901 on a Ceiling..........................................................................................................................63
7.4.4 Installing a pRRU3901 on a Pole.............................................................................................................................. 66
7.4.5 Installing a pRRU3901 on a Plate............................................................................................................................. 68
7.4.6 Installing a pRRU3901 on a Keel..............................................................................................................................71
7.5 Installing pRRU3901 Cables........................................................................................................................................ 74
7.5.1 Requirements for Cable Layout.................................................................................................................................74
7.5.2 pRRU3901 Cable List............................................................................................................................................... 76
7.5.3 Cable Connections.....................................................................................................................................................76
7.5.4 Cable Connections (LTE TDD)................................................................................................................................. 79
7.5.5 pRRU3901 cable installation process........................................................................................................................81
7.5.6 Installing an Ethernet Cable...................................................................................................................................... 81
7.5.7 Installing an RF jumpers (Optional)..........................................................................................................................83
7.6 Checking the pRRU3901 Hardware Installation.......................................................................................................... 85
7.7 Powering on the pRRU3901.........................................................................................................................................86
8 Installing a pRRU3902................................................................................................................ 88
8.1 Information About the Installation............................................................................................................................... 89
8.1.1 pRRU3902 Product Family....................................................................................................................................... 89
8.1.2 pRRU3902 Installation Scenario............................................................................................................................... 90
8.1.3 Space Requirements.................................................................................................................................................. 93
8.1.4 Installation Environment Requirements.................................................................................................................... 94
8.2 Installation Process....................................................................................................................................................... 95
8.3 Installing a pRRU3902................................................................................................................................................. 96
8.3.1 pRRU3902 Mounting Kits.........................................................................................................................................96
8.3.2 Installing a pRRU3902 on a Wall.............................................................................................................................. 98
8.3.3 Installing a pRRU3902 on a Ceiling........................................................................................................................102
8.3.4 Installing a pRRU3902 on a Plate........................................................................................................................... 105
8.3.5 Installing a pRRU3902 on a Keel............................................................................................................................ 112
8.3.6 Installing a pRRU3902 on Steel Hangers................................................................................................................ 116
8.4 Installing pRRU3902 Cables...................................................................................................................................... 120
8.4.1 Requirements for Cable Layout...............................................................................................................................120
8.4.2 pRRU3902 Cable List............................................................................................................................................. 122
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iv
DBS3900 LampSite Installation Guide Contents
8.4.3 Cable Connections...................................................................................................................................................122
8.4.4 pRRU3902 cable installation process......................................................................................................................124
8.4.5 Installing an Ethernet Cable.................................................................................................................................... 125
8.4.6 Installing an RF Jumpers (Optional)....................................................................................................................... 126
8.5 (Optional) Installing a Combiner................................................................................................................................128
8.6 Checking the pRRU3902 Hardware Installation........................................................................................................ 130
8.7 Powering on the pRRU3902.......................................................................................................................................131
9 Installing a pRRU3907.............................................................................................................. 133
9.1 Information About the Installation............................................................................................................................. 134
9.1.1 pRRU3907 Product Family..................................................................................................................................... 134
9.1.2 Constraints and Limitations.....................................................................................................................................134
9.1.3 Installation Clearance and Space Requirements......................................................................................................137
9.1.4 Installation Environment Requirements.................................................................................................................. 139
9.2 Installation Process..................................................................................................................................................... 140
9.3 Installing a pRRU3907............................................................................................................................................... 141
9.3.1 pRRU3907 Mounting Kits.......................................................................................................................................141
9.3.2 Installing a pRRU on a Wall.................................................................................................................................... 142
9.3.3 Installing a pRRU on a Pole.................................................................................................................................... 146
9.4 Installing pRRU Cables.............................................................................................................................................. 148
9.4.1 Cabling Requirements............................................................................................................................................. 148
9.4.2 pRRU3907 Cable List............................................................................................................................................. 150
9.4.3 pRRU Cable Connections........................................................................................................................................151
9.4.4 pRRU3907 cable installation process......................................................................................................................151
9.4.5 Installing a PGND Cable......................................................................................................................................... 152
9.4.6 Installing an RF Jumper...........................................................................................................................................153
9.4.7 Opening the Cover Plate of a pRRU Cabling Cavity.............................................................................................. 157
9.4.8 Installing an Ethernet Cable.................................................................................................................................... 158
9.4.9 Closing the Cover Plate of a pRRU Cabling Cavity............................................................................................... 160
9.5 Checking the pRRU3907 Hardware Installation........................................................................................................ 161
9.6 Powering on the pRRU3907.......................................................................................................................................163
10 Installing the Extender (Optional)....................................................................................... 165
11 Appendix...................................................................................................................................168
11.1 MAC Collection Template........................................................................................................................................169
11.2 DBS3900 LampSite Engineering Label................................................................................................................... 169
11.3 Attaching an L-Shaped Label................................................................................................................................... 172
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
v
DBS3900 LampSite Installation Guide

1 Changes in DBS3900 LampSite Installation Guide

1 Changes in DBS3900 LampSite Installation
Guide
This chapter describes the changes in the DBS3900 LampSite Installation Guide.
06 (2015-10-30)
05 (2015-08-30)
This is the sixth commercial release.
Compared with 05 (2015-08-30), this issue includes the following new topics:
l 9 Installing a pRRU3907
Compared with 05 (2015-08-30), no information is changed.
Compared with 05 (2015-08-30), no information is deleted.
This is the fifth commercial release.
Compared with 04 (2015-07-30), no information is added.
Compared with 04 (2015-07-30), this issue incorporates the following changes
Content
6.4.7 Installing CRPI Optical Cables Added the descriptions about the CPRI
Change Description
optical fiber connection in sharing BBUs with Macro Networks scenario.
Compared with 04 (2015-07-30), no information is deleted.
04 (2015-07-30)
This is the fourth commercial release.
Compared with 03 (2015-06-30), no information is added.
Compared with 03 (2015-06-30), this issue incorporates the following changes.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1
DBS3900 LampSite Installation Guide
03 (2015-06-30)
1 Changes in DBS3900 LampSite Installation Guide
Content Change Description
Entire document Added the RHUB that has no electrical
transmission port.
Compared with 03 (2015-06-30), no information is deleted.
This is the third commercial release.
Compared with 02 (2015-05-08), this issue includes the following new topics:
l 5 Installing a DCU
Compared with 02 (2015-05-08), this issue incorporates the following changes:
02 (2015-05-08)
Content
Entire document Added the descriptions about the DCU.
Compared with 02 (2015-05-08), no information is deleted.
This is the second commercial release.
Compared with 01 (2015-03-23), no information is added.
Compared with 01 (2015-03-23), this issue incorporates the following changes:
Content
6.4.9 Installing Power Cable Modified the RHUB configurations of
8.1.2 pRRU3902 Installation Scenario Deleted the minimum space requirements of
8.1.3 Space Requirements Deleted the minimum space requirements of
Change Description
Change Description
upper-level circuit breakers.
the pRRU3901.
the pRRU3902.
8.3.2 Installing a pRRU3902 on a Wall Added the step about locking the protection
screw of pRRU3902.
8.3.3 Installing a pRRU3902 on a Ceiling
8.3.4 Installing a pRRU3902 on a Plate
8.3.5 Installing a pRRU3902 on a Keel
Compared with 01 (2015-03-23), no information is deleted.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
DBS3900 LampSite Installation Guide
01 (2015-03-23)
1 Changes in DBS3900 LampSite Installation Guide
This is the first commercial release.
Compared with draft B (2015-02-10), this issue includes the following new topics:
l 8 Installing a pRRU3902
Compared with draft B (2015-02-10), this issue incorporates the following changes:
Content
Entire document Added the descriptions about the
Compared with draft B (2015-02-10), no information is deleted.
Draft B (2015-02-10)
This is a draft release.
Compared with draft A (2015-01-15), no information is added.
Compared with draft A (2015-01-15), this issue incorporates the following change:
Content
6.1.1 Installation Scenarios Added the descriptions about the RHUB
Change Description
pRRU3902.
Change Description
panel must not face upwards.
Compared with draft A (2015-01-15), no information is deleted.
Draft A (2015-01-15)
This is a draft release.
Compared with Issue 08 (2014-12-30) of V100R009C00, no information is added.
Compared with Issue 08 (2014-12-30) of V100R009C00, this issue incorporates the following change:
Content
Entire document The base station in the LampSite solution is
Compared with Issue 08 (2014-12-30) of V100R009C00, no information is deleted.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Change Description
renamed DBS3900 LampSite.
3
DBS3900 LampSite Installation Guide
About This Chapter
Before starting the installation, you must obtain the required reference documents, tools, and instruments, and familiarize yourself with the skills required.

2 Installation Preparations

2 Installation Preparations
2.1 Reference Documents
Before the installation, you must read the following documents:
2.2 Preparing Tools and Instruments
This section describes the tools and instruments that must be prepared before the installation.
2.3 Requirements for Installation Personnel
This section describes requirements for installation engineers. They must be qualified and trained, and familiar with correct operation methods and safety precautions before performing any operations.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4
DBS3900 LampSite Installation Guide

2.1 Reference Documents

Before the installation, you must read the following documents:
l DBS3900 LampSite Hardware Description
l Installation Reference

2.2 Preparing Tools and Instruments

This section describes the tools and instruments that must be prepared before the installation.
2 Installation Preparations
Marker
Level
Power cable crimping tool RJ11 crimping tool Cable cutter
Rubber mallet Crown saw (Ø60) Wire stripper
Hammer drill (Ø6, Ø8 and Ø12)
Torque screwdriver
(M4 to M6)
Torque wrench (Ø10 mm) Protective gloves
Diagonal pliers
Guarded blade utility knife ESD gloves Long measuring tape
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5
DBS3900 LampSite Installation Guide
2 Installation Preparations
Multimeter Network cable tester Vacuum cleaner
Ladder Torque wrench for SMA
connector
Hole screwdriver (T20) -

2.3 Requirements for Installation Personnel

This section describes requirements for installation engineers. They must be qualified and trained, and familiar with correct operation methods and safety precautions before performing any operations.
Socket wrench (M6)
Before the installation, pay attention to the following items:
l Technical engineers must take Huawei training and be familiar with proper installation
and operation methods.
l The number of installation personnel depends on the engineering schedule and
installation environment. Generally, three to five persons are required. Generally, only three to five onsite personnel are necessary.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6
DBS3900 LampSite Installation Guide
Context

3 Unpacking and Checking

3 Unpacking and Checking
This section describes how to unpack and check the delivered equipment to ensure that the materials are complete and intact.
Procedure
Step 1 Count the total number of the shipments.
NOTE
The following lists important notes when you are transporting, lifting, or installing the equipment or components:
l Protect them from colliding with doors, walls, shelves, or other objects.
l Wear clean gloves and do not touch them with bare hands, sweat-soaked gloves, or dirty gloves.
NOTICE
You must power on the RHUB or pRRU within 7 days after it is unpacked.
If...
The total number of the components is consistent with that recorded in the packing lists on all packing boxes
Then...
Go to Step 2.
The total number of the components is inconsistent with that recorded in the packing lists on all packing boxes
Step 2 Check the exterior of each packing box.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Report the problems and causes to the local Huawei office.
7
DBS3900 LampSite Installation Guide
Step 3 Check the type and quantity of the equipment in the boxes according to the packing list.
3 Unpacking and Checking
If... Then...
The exterior of each packing box is intact Go to Step 3.
It is damaged or soaked Report the problems and causes to the local
Huawei office.
The collision label is red Do not unpack the packing box and claim for
compensation from the transportation company.
If...
The type and number are consistent with the packing list on each packing list
There is any shortage, wrong delivery, or damaged equipment
Then...
Sign the Packing List with the operator.
Report the problems and causes to the local Huawei office.
NOTICE
Perform the following operations to protect the components from any damages and help find out the cause of any damage in future: 1. Store the unpacked equipment and packing materials indoors. 2. Take photos of the storeroom, rusted or eroded equipment, packing box, and packing materials. 3. File the photos.
----End
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8
DBS3900 LampSite Installation Guide

4 Installing a BBU

4 Installing a BBU
This chapter describes the process of installing a BBU.
For details about the installation of the BBU, see DBS3900 Installation Guide.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9
DBS3900 LampSite Installation Guide

5 Installing a DCU

5 Installing a DCU
This chapter describes the process of installing a DCU.
For details about the installation of the DCU, see DCU3900 Installation Guide.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10
DBS3900 LampSite Installation Guide
About This Chapter
This chapter describes the process of installing an RHUB. RHUBs are classified into those with electrical transmission ports and those with no electrical transmission ports. Unless otherwise specified, this document uses the RHUBs with no electrical transmission ports as an example.

6 Installing an RHUB

6 Installing an RHUB
6.1 Information About the Installation
This section describes the information to be learnt before RHUB installation, including the RHUB installation scenarios, clearance, and installation environment.
6.2 Installation Process
The RHUB installation involves installing an RHUB module, installing RHUB cables, checking the RHUB hardware installation, and powering on the RHUB.
6.3 Installing an RHUB
An RHUB can be installed in a cabinet, rack, shelf, or on a wall.
6.4 Installing RHUB Cables
This section describes how to install cables for an RHUB.
6.5 Checking the RHUB Hardware Installation
After an RHUB is installed, check the installation of hardware including the devices and related cables.
6.6 Power-on Check on an RHUB
This section describes the power-on check on the RHUB after the RHUB hardware is installed and checked.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
11
DBS3900 LampSite Installation Guide

6.1 Information About the Installation

This section describes the information to be learnt before RHUB installation, including the RHUB installation scenarios, clearance, and installation environment.

6.1.1 Installation Scenarios

An RHUB can be installed in a 19-inch cabinet, rack, shelf, or on a wall.
NOTICE
To prevent the RHUB from water drops, the RHUB panel must not face upwards (shown in
Figure 6-1) in any installation scenarios.
Figure 6-1 Improper installation mode
6 Installing an RHUB
The RHUB mounting ears are installed in standard mode or reverse mode. The reverse mode is used by default. The two installation modes are defined as follows:
l In standard mode, the front of the mounting ear is aligned with the RHUB panel, as
shown in Figure 6-2.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-2 Installing mounting ears in standard mode
l In reverse mode, the front of the mounting ear is 31 mm away from the RHUB panel, as
shown in Figure 6-3.
Figure 6-3 Installing mounting ears in reverse mode
Installing an RHUB in a 19-Inch Cabinet or Rack
Installing an RHUB in a 19-inch cabinet or rack: Secure the mounting ear to the mounting bracket by using M6 screws.
l If there are no other modules installed in the 1 U space near the RHUB, install the
RHUB directly. Otherwise, remove the modules before installing the RHUB.
l Before installation, you need to check the installation mode supported by the rack and
adjust the position of the mounting ear.
Figure 6-4 and Figure 6-5 show RHUBs installed in a cabinet or rack, respectively.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-4 Installing an RHUB in a 19-inch cabinet or rack in standard mode
Figure 6-5 Installing an RHUB in a 19-inch cabinet in reverse mode
Installing an RHUB in a 19-Inch Shelf
When an RHUB is installed in a 19-inch shelf, the shelf must be installed on a wall. One shelf can house multiple RHUBs with 1 U space between two RHUBs.
Figure 6-6 and Figure 6-7 show RHUBs installed in a 19-inch shelf.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-6 RHUB installed in a 19-inch shelf in standard mode
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-7 RHUB installed in a 19-inch shelf in reverse mode
Installing an RHUB on a Wall
An RHUB can be installed on a wall.
The wall on which an RHUB is installed must meet the following requirements:
l When a single RHUB is installed, the wall must have a capacity of bearing at least four
times the weight of the RHUB.
l Expansion bolts must be tightened to 10 N·m (88.507 bf·in.) to ensure the bolts work
properly and the wall remains intact without cracks in it.
Figure 6-8 shows an RHUB installed on a wall.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
16
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-8 RHUB installed on a wall

6.1.2 Installation Clearance Requirements

When an RHUB is installed in a 19-inch cabinet, rack, shelf, or on a wall, a minimum clearance is required for easy cabling and operation and maintenance. A recommended installation clearance is provided based on experience.
NOTICE
l Do not install or place inflammable materials above or under an RHUB.
l A clearance of 350 mm must be reserved in front of the air intake vent of the fan of the
power supply unit (PSU) for maintenance.
Figure 6-9 shows the installation clearance for the RHUB installed in a 19-inch cabinet, rack,
or shelf.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
17
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-9 Installation clearance for an RHUB installed in a 19-inch cabinet, rack, or shelf
Figure 6-10 and Figure 6-11 shows the recommended and minimum installation clearance
respectively when the RHUB is installed on a wall.
Figure 6-10 Recommended installation clearance for a wall-mounted RHUB (unit: mm)
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
18
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-11 Minimum installation clearance for a wall-mounted RHUB (unit: mm)

6.1.3 Installation Environment

The installation environment of an RHUB involves the running environment specifications for the RHUB and other specifications.
RHUB Running Environment Specifications
Table 6-1 shows the environment specifications for the RHUB installed indoors.
l The temperature and humidity of the installation position must ensure normal operation.
A cool and ventilated place is recommended.
l The heat dissipation holes on the RHUB cannot be blocked.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
19
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Table 6-1 RHUB environment specifications
Specifi cations
Operati ng tempera
Installation Scenario
Installed on a wall or in a 19­inch rack.
RHUB
Condition Remarks
Quantity
N/A -5°C to
+50°C
ture
Installed in a shelf.
1 -5°C to
+45°C
2 -5°C to
+43°C
3 -5°C to
+40°C
Relativ e
Installed in all scenarios.
N/A 5% RH to
95% RH humidit y
Altitude N/A N/A -60 m to
+1800 m
1800 m to
4000 m
N/A
N/A
N/A
N/A
N/A
Works properly.
Above the 1800 m altitude, the maximum operating temperature decreases by 1°C each time the altitude increases by 220 m.
NOTE
Installing more than one RHUB, 1 U space is required between two RHUBs.
Other Running Environment Specifications
l The RHUB cannot be installed at an air outlet of the heat dissipation box of an air
conditioner or other heat-generating appliances.
l The RHUB cannot be installed near a strong heat source.
l The RHUB cannot be installed in a position with water dripping, such as outdoor
equipment of air conditioners, pipe, and leaking or dripping roofs.
l The installation position must be far from rains. If the RHUB is installed on a wall, there
must be no window on either side of the wall.
l The installation position must be far away from high voltage, highly corrosive devices,
flammable or explosive substances, and electromagnetic interference (such as power stations, high-voltage substations, and wired TV towers.
l The RHUB must be installed in a dry, ventilating, and dust-proof place.
l If the RHUB is installed in parking areas or basements, the installation position must be
well-ventilated.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
20
DBS3900 LampSite Installation Guide
Requirements for the Upper-level Circuit Breaker
Type C upper-level AC circuit breakers or slow-blow fuses must be used for power cables. The maximum current must not exceed 16 A. Table 6-2 describes the recommended specifications.
Table 6-2 Circuit breaker specifications for power cables
6 Installing an RHUB
Power Supply
220 V AC single-phase ≥ 6 A
110 V AC dual-live-wire
110 V AC single-phase ≥ 12 A

6.2 Installation Process

The RHUB installation involves installing an RHUB module, installing RHUB cables, checking the RHUB hardware installation, and powering on the RHUB.
Figure 6-12 shows the RHUB installation process.
Upper-level AC Circuit Breaker (For a single RHUB)
Cross-Sectional Area of the Input Power Cable
1.5 mm
2
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
21
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-12 RHUB installation process

6.3 Installing an RHUB

An RHUB can be installed in a cabinet, rack, shelf, or on a wall.

6.3.1 Installing an RHUB in a 19-Inch Cabinet or Rack

This section describes how to install an RHUB in a 19-inch cabinet.
Procedure
l The following describes how to install an RHUB with mounting ears in reverse mode:
NOTE
If necessary, request one more person for assistance.
a. With one hand holding it, align the mounting holes with the installation holes,
slowly push the RHUB into the required position in the cabinet, as shown in Figure
6-13.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
22
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-13 Pushing an RHUB into a cabinet
b. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws
with a torque of 2 N•m, as shown in Figure 6-14.
Figure 6-14 Tightening screws
l The following describes how to install an RHUB with mounting ears aligned with the
RHUB panel:
NOTE
If necessary, request one more person for assistance.
a. Remove the mounting ears on both sides of the RHUB by removing the four M4×8
screws, as shown in Figure 6-15.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
23
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-15 Removing mounting ears and screws
b. Use a torque screwdriver or Phillips screwdriver to tighten the four M4×8 screws
with a torque of 1.4 N•m to install the removed mounting ears again, as shown in
Figure 6-16. The mounting ears must be aligned with the RHUB panel.
Figure 6-16 Installing mounting ears in standard mode
c. With one hand holding it, align the mounting holes with the installation holes,
slowly push the RHUB into the required position in the cabinet, as shown in Figure
6-17.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
24
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-17 Pushing an RHUB into a cabinet
d. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws
with a torque of 2 N•m, as shown in Figure 6-18.
Figure 6-18 Tightening screws
----End

6.3.2 Installing an RHUB in a 19-Inch Shelf

If a shelf houses more than one RHUB, 1 U space is required between two RHUBs. The PSU must be installed at the bottom of the cabinet.
Procedure
l The following describes how to install an RHUB with mounting ears installed in reverse
mode:
NOTE
If necessary, request one more person for assistance.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
25
DBS3900 LampSite Installation Guide
6 Installing an RHUB
a. With one hand holding it, align the mounting holes with the installation holes,
slowly push the RHUB into the required position in the shelf.
b. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws
with a torque of 2 N•m, as shown in Figure 6-19.
Figure 6-19 Tightening screws
l The following describes how to install an RHUB with mounting ears installed in
standard mode:
NOTE
If necessary, request one more person for assistance.
a. Remove the mounting ears on both sides of the RHUB by removing the four M4×8
screws, as shown in Figure 6-20.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
26
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-20 Removing mounting ears and screws
b. Use a torque screwdriver or Phillips screwdriver to tighten the four M4×8 screws
with a torque of 1.4 N•m to install the removed mounting ears again, as shown in
Figure 6-21. The mounting ears must be aligned with the RHUB panel.
Figure 6-21 Installing mounting ears in standard mode
c. With one hand holding it, align the mounting holes with the installation holes,
slowly push the RHUB into the required position in the cabinet, as shown in .
d. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws
with a torque of 2 N•m, as shown in Figure 6-22.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
27
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-22 Tightening screws
----End

6.3.3 Installing an RHUB on a Wall

An RHUB can be installed on a wall.
Procedure
Step 1 The mounting ears are installed in reverse mode by default. Before installing an RHUB on a
wall, modify the installation mode of the mounting ears on the RHUB.
l Use a torque screwdriver or Phillips screwdriver to remove the mounting ears on both
sides of the RHUB by removing the four M4×8 screws, as shown in Figure 6-23.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
28
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-23 Removing screws and mounting ears
l Rotate the mounting ears 90 degrees clockwise, and use a torque screwdriver or Phillips
screwdriver to secure the mounting ear with a torque of 1.4 N•m, as shown in Figure
6-24.
Figure 6-24 Installing mounting ears and screws
Step 2 Determine the position on the wall for installing the RHUB based on the requirements in the
engineering blueprint and 6.1.2 Installation Clearance Requirements. Place the RHUB to the position to be installed against the wall, and then mark the four anchor points where the mounting ear screws are fastened using a marker, as shown in Figure 6-25.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
29
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-25 Anchor points for installing an RHUB on a wall
(1) Level (2) RHUB (3) Wall
CAUTION
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes.
Step 3 Drill holes at the anchor point and install expansion bolts, as shown in Figure 6-26.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
30
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-26 Drilling holes and installing expansion bolts
(1) M6×60 expansion bolt
(2) Nut (3) Spring washer (4) Flat washer (5) Extension tub
1. Use a hammer drill with bit 8 to drill holes with a diameter of 8 mm and a depth of 45 mm to 50 mm at the marked anchor points. All the holes have the same depth.
2. Use a vacuum cleaner to clear the dust inside and around each hole. If the distance between two holes is incorrect, mark and drill holes again.
3. Partially tighten an expansion bolt and place it vertically into each hole.
4. Use a rubber mallet to hit the expansion bolt until the entire expansion sleeve is in the hole.
5. Remove the M6×60 bolt, nut, spring washer, and flat washer from each expansion bolt in sequence.
NOTICE
After removing an expansion bolt, ensure that the top of the expansion sleeve is level with the wall. If it is not level, the RHUB cannot be installed on the concrete floor evenly and securely.
Step 4 Align the mounting holes with the four M6×60 expansion bolts. Install spring washer 6 and
flat washer 6 in sequence on each M6×60 expansion bolt, insert the bolts to each expansion tub, and then use a torque wrench or socket wrench to tighten the four M6×60 bolts with a torque of 5 N•m to secure the RHUB to the wall, as shown in Figure 6-27.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
31
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-27 Installing an RHUB on a wall
NOTE
As shown in the preceding figure, when the RHUB is placed against the wall, ensure that the RHUB panel is vertical to the ground and the PSU is on the lower part of the RHUB panel.
----End

6.4 Installing RHUB Cables

This section describes how to install cables for an RHUB.

6.4.1 Requirements for Cable Layout

Cables must be routed according to the specified cabling requirements to prevent signal interference.
NOTE
If a cable listed below is not required, skip the requirements for routing the cable.
General Requirements for Cable Layout
National Standards
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
32
DBS3900 LampSite Installation Guide
6 Installing an RHUB
l Code for Engineering Design of Generic Cabling System for Building and Campus (GB
50311-2007)
l Code for Engineering Acceptance of Generic Cabling System for Building and Campus
(GB50312-2007).
l Security Protection Engineering Technology Specifications (GB 50348-2004)
l Code for Construction and Acceptance of the Electronic Information System Room (GB
50462-2008)
l Code for Quality Acceptance of the Intelligent Building Engineering (GB 50339-2003)
l Code for Quality Acceptance of Electric Engineering Construction in Building (GB
50303-2002)
l Technical Specification for Construction and Acceptance of Telecommunication Conduit
Engineering (GB 50374-2006)
International Standards
l Generic Cabling for Customer Premises (ISO/IEC 11801)
l Commercial Building Telecommunications Cabling Standard (EIA/TIA 568)
l Commercial Building Standard for Telecommunication Pathways and Spaces (EIA/TIA
569)
l Administration Standard for Commercial Telecommunications Infrastructure (EIA/TIA
606)
l Grounding and Bonding Requirements for Telecommunications in Commercial
Buildings (EIA/TIA 607)
l Generic Cabling Systems for Information Technology (EN 50173)
l Cabling Installation for Information Technology (EN 50174)
Bending radius
l The bending radius of a power cable or a protection ground (PGND) cable is at least five
times the diameter of the cable.
l The bending radius of an optical cable is at least 20 times the diameter of the optical
cable, and the minimum bending radius of the branch at each end of the optical cable is 30 mm.
l The bending radius of the signal cable must be at least five times the diameter of the
cable.
Cable Binding
l Cables of the same type are bound together.
l Different types of cables must be separately routed with a minimum spacing of 30 mm
and cannot be entangled or crossed.
l The cables are bound tightly and neatly and the cable sheath is intact.
l The cable ties face the same direction and all cable ties bound at similar positions must
be in a straight line.
l The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for
each outdoor cable tie. All cut surfaces have no sharp edges.
l Labels or nameplates are attached to both ends, joints, or turns of cables after they are
installed.
Safety
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
33
DBS3900 LampSite Installation Guide
l The steel pipe or fire-resistant rigid polyvinyl chloride pipe should be used for the cable
duct or for routing cables. The cross-sectional usage of the cable duct should be 30% to 50% and that of the pipe for routing cables should be 25% to 30%.
l Cables are placed away from sharp objects or wall burrs. If these positions are inevitable,
protection pipes are required for the cables.
l Cables are routed away from heat sources, or heat-insulation materials are added
between cables and heat sources.
l Cables are routed away the cooling vents of the RHUB.
l A clearance is reserved at turns of a cable or the position close to a device, facilitating
cable and device maintenance. The recommended clearance is about 0.1 m.
Requirements for Special Cables
Ethernet Cable
l A maximum of 100 Ethernet cables can be bundled if no PVC pipes are used. If pipes are
used, a maximum of 24 Ethernet cables can be led through a pipe. In this case, ensure that 1/3 space inside the pipes must be vacant.
l The point at which an Ethernet cable is bundled must be spaced 400 mm or less from the
Ethernet port on an RHUB.
l For the RHUB used in the elevator engine room on the rooftop, generator set for the
subway engine, and equipment room with central air conditioning, Ethernet cables must be led through metallic conduits that are reliably grounded at both ends.
6 Installing an RHUB
Power cable
l Positions for routing power cables meet requirements of the engineering design.
l Cables are routed only by qualified and trained personnel before all preparations are
made.
l Cables are routed in an untangled and orderly fashion.
PGND cable
l PGND cables are buried in the ground or routed indoors. They cannot be routed
overhead before they are routed into the equipment room.
l Outer conductors of coaxial cables and both ends of the shield layers on shielded cables
are in proper electrical contact with the metal surface of the equipment to which they are connected.
l PGND cables and signal cables are installed in an untangled and orderly fashion. A
certain distance is reserved between them to prevent interference from each other.
l Fuses or switches are not allowed on PGND cables.
l Other devices cannot be used for electrical connections of PGND cables.
l All the metal parts in the equipment are reliably connected to the ground terminal.
Optical cable
l Cables are routed in an untangled and orderly fashion.
l Optical fibers cannot be bound at turns.
l Optical fibers cannot be stretched with too much force or stepped on, and they are far
away from sharp objects. Heavy objects cannot be placed on optical cables.
l When optical cables are routed, the extra length of the cables is coiled around special
devices, such as a fiber coiler.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
34
DBS3900 LampSite Installation Guide
l Even strength is applied when optical cables are coiled and optical cables cannot be bent
l Vacant optical connectors are covered with dust-proof caps.
l Fiber optic cables cannot be squeezed by the cabinet door when routed through the
l If optical cables need to be routed on the tower platform, the optical cables are routed
l If optical cables need to be routed close to a device on the tower, the optical cables are
l If the optical cable close to a device on the tower is too long, the optical cables are

6.4.2 Cable List

This section describes the connector types and connections of the RHUB cables.
Table 6-3 lists RHUB cables.
6 Installing an RHUB
in a forcible manner.
cabinet.
along the inner side of the guard rail and the distance between the guard rail and the cable is the shortest one.
secured to the guard rail or pole with cable clips and the device cannot be far away from the position for securing the optical cables.
wrapped and secured to the tower.
Table 6-3 RHUB cable list
Cable
One End The Other End
Connector Connected
PGND cable OT terminal
(M4, 6 mm [0.009 in.2])
Power Supply Cable
CPRI Optical
C13 female connector
DLC connector CPRI port on
Fiber
Connector Connected to...
to...
Ground screws
2
on the RHUB
AC power input socket on
OT terminal (M6, 6 mm [0.009 in.2])
2
Ground terminal on the external ground bar
3-pin connector External power
input socket
the RHUB
DLC connector CPRI0 or CPRI1 the LBBP, WBBP or
port on the
RHUB UBBP in the BBU
CPRI port on the LBBP,
DLC connector CPRI port on the
DCU WBBP or UBBP in the BBU
CPRI port on the DCU
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
CPRI0 or CPRI1
port on the
RHUB
35
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Cable One End The Other End
Ethernet Cable
(Optional) Alarm Cable
Connector Connected
to...
CPRI0 or CPRI1 port on the RHUB
CPRI port on the LBBP, WBBP or UBBP in the BBU
CPRI port on the DCU
CPRI0 or CPRI1 port on the RHUB
RJ45 connector CPRI_E0~CP
RI_E7 port on the RHUB
RJ45 connector EXT_ALM
port on the RHUB
Connector Connected to...
DLC connector CPRI0 or CPRI1
port on the
RHUB
FC connector,
ODF
SC connector, or LC connector
RJ45 connector CPRI_E0~CPRI_
E1 port on the
pRRU3901
Bare end Alarm signal port
of the monitored
equipment
NOTE
l If one end of the CPRI cable is connected to the DLC connector, the other end connects the BBU,
DCU or RHUB through the DLC connector. If one end of the CPRI cable is connected to the ODF adapter, the other end connects the BBU or RHUB through a connector corresponding to the adapter. The connectors include the FC connector, SC connector, and LC connector.
l The Extender can be used to lengthen the distance between the RHUB and the pRRU connected
using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.

6.4.3 Cable Connections

This section describes the cable connections for an RHUB.
Figure 6-28 shows the cable connections for an RHUB. The port of ETH are reserved.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
36
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-28 Cable connections for an RHUB
(1) CPRI optical cable (2) Alarm cable (3) Ethernet cable
(4) Power cable (5) PGND cable -
NOTE
The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.

6.4.4 Cable Installation Process

This section describes the process of installing RHUB cables.
Figure 6-29 shows the RHUB cable installation process.
Figure 6-29 RHUB cable installation process
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
37
DBS3900 LampSite Installation Guide

6.4.5 Installing PGND Cable

An RHUB PGND cable ensures proper grounding of an RHUB.
Prerequisites
The OT terminals at both ends of the PGND cable are prepared.
Context
The yellow and green or green PGND cable is a single cable. The cross-sectional area of the PGND cable is 6 mm2 (0.009 in.2). Both ends of the cable are OT terminals, as shown in
Figure 1.
Figure 6-30 Exterior of a PGND cable
6 Installing an RHUB
(1) OT terminal (6 mm
NOTE
l If the PGND cable is provided by the customer, a copper-core cable with a minimum cross-sectional
area of 6 mm2 (0.009 in.2) or 10 AWG is recommended.
l The OT terminals at both ends of the PGND cable are assembled at the site.
l The M6 OT terminal has the default size. You can replace it with another OT terminal of the
expected size based on the site requirement.
2
[0.009 in.2], M4) (2) OT terminal (6 mm2 [0.009 in.2], M6)
NOTICE
l Ensure proper grounding of the RHUB using a PGND cable.
l When installing the PGND cable, tightly press the OT terminal in the correct direction, as
shown in Figure 6-31.
Figure 6-31 Correct direction of an OT terminal for the PGND cable
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
38
DBS3900 LampSite Installation Guide
Procedure
Step 1 Route the PGND cable by referring to 6.4.1 Requirements for Cable Layout.
Step 2 Use a torque screwdriver or Phillips screwdriver to secure the M4 OT terminal at one end of
6 Installing an RHUB
the PGND cable to the ground screw on the RHUB panel with a torque of 1.4 N•m. If the OT terminal is a one-hole OT terminal, connect it to the ground screw on the lower part of the RHUB panel, as shown in Figure 6-32.
Figure 6-32 Installing an RHUB PGND cable
Step 3 Use a torque screwdriver or Phillips screwdriver to secure the M8 OT terminal at one end of
the PGND cable to the wiring terminal on the ground bar at the site with a torque of 1.4 N•m.
----End
Follow-up Procedure
1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

6.4.6 Installing Ethernet Cable

This section describes how to install an Ethernet cable.
Prerequisites
l The Ethernet cable must be of Category 5e (enhanced) or higher. In addition, its cross-
sectional area must be 24 AWG or larger and frame spread rating must be CM or higher.
l The Ethernet cables can be straight-through cables or crossover cables.
l With the internal PoE module providing power, the maximum length of an Ethernet
cable is 100 m. With the Extender, the distance of the pRRU and RHUB can be extended by the Extender up to a total distance of 200 m.
l Ethernet cables are not delivered, and they must be prepared onsite. You need to use a
network cable tester to test the Ethernet cable connection.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
39
DBS3900 LampSite Installation Guide
Context
Procedure
Step 1 Make the Ethernet cables.
6 Installing an RHUB
The Ethernet cable has the following functions:
l Provides power supply for the pRRU when connected to the CPRI_E0 port on the
pRRU.
l Transmits CPRI signals between an RHUB and a pRRU.
Using the CPRI_E1 port on the pRRU3901 has the same Ethernet cable connection to the RHUB as using the CPRI_E0 port. The following section describes the connection using the CPRI_E0 port.
1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable of Installation Reference.
NOTE
Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the unshielded RJ45 connector and the Ethernet cable. Otherwise,
the transmission signal quality deteriorates and CPRI links may be disconnected.
2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips.
3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2.
4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference.
Step 2 Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from
CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design.
Step 3 Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output
port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender.
If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.
Step 4 Remove the dustproof cap of the CPRI_E0 port on the pRRU.
Step 5 Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the
pRRU panel, as shown in Figure 6-33, Figure 6-34.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
40
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-33 Install an Ethernet cable between an RHUB and a pRRU3901
(1) Ethernet cable (2) CPRI_E0 port on the pRRU3901
Figure 6-34 Install an Ethernet cable between an RHUB and a pRRU3902
(1) Ethernet cable (2) CPRI_E0 port on the pRRU3902
----End
Follow-up Procedure
1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

6.4.7 Installing CRPI Optical Cables

Optical fibers can be used to interconnect BBU and RHUBs, or cascade RHUBs.
Context
l Multi-mode optical modules for CPRI ports are labeled MM and each has a black or gray
puller.
l Single-mode optical modules are labeled SM and each has a blue puller.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
41
DBS3900 LampSite Installation Guide
Procedure
Step 1 Install an optical module, as shown in Figure 6-35 and Figure 6-36.
6 Installing an RHUB
l For details about the connection of CPRI optical cables, see CPRI Topology in
DBS3900 LampSite Technical Description.
l An optical module to be installed must match the rate of its corresponding port.
NOTE
The performance of an optical module that is exposed to the air for more than 20 minutes may be abnormal. Therefore, you must insert a fiber optic cable into an unpacked optical module within 20 minutes.
1. Remove the dust-proof cap from the CPRI port on the RHUB panel.
2. Remove the dust-proof cap on the optical module.
3. Lower the puller of the optical module.
4. Insert the optical module into the CPRI port on the RHUB, DCU, BBU or ODF.
5. Raise the puller of the optical module.
Figure 6-35 Removing the dust-proof cap from a port
Figure 6-36 Installing an optical module
Step 2 Install a CPRI optical cable, as shown in Figure 6-37.
1. Remove the dust-proof cap from the optical cable connector.
2. Install the optical cables by referring to Table 6-4.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
42
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Table 6-4 CPRI optical cable connections
One End The Other End
ConnectorConnected to Connector Connected to
DLC connecto
BBU/LBBP&WBBP/CPRI port
DLC connector CPRI0 or CPRI1 port on
the RHUB
r
BBU/LBBP&WBBP/CPRI
DLC connector CPRI port on the DCU
port
CPRI port on the DCU CPRI0 or CPRI1 port on
the RHUB
CPRI0 or CPRI1 port on the RHUB
BBU/LBBP&WBBP/CPRI port
DLC connector CPRI0 or CPRI1 port on
the RHUB
FC, SC, or LC
ODF
connector
CPRI port on the DCU
CPRI0 or CPRI1 port on the RHUB
NOTE
l In sharing BBUs with Macro Networks scenario, RHUBs share only main control boards with with
RF modules on macro base stations, not baseband processing units.
l If one end of the CPRI cable is connected to the DLC connector, the other end connects the BBU or
RHUB through the DLC connector. If one end of the CPRI cable is connected to the ODF adapter, the other end connects the BBU/DCU or RHUB through a connector corresponding to the adapter. The connectors include the FC connector, SC connector, and LC connector.
l When connecting the CPRI cable to the TX and RX ports of the optical module through connectors
in a cross manner, ensure that one end of a core of the CPRI cable is connected to the TX port and the other end is connected to the RX port. Figure 6-37 shows how to install a CPRI optical cable for connecting the BBU and RHUBs.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
43
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-37 Installing an CRPI optical cable
----End
Follow-up Procedure
1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

6.4.8 Installing Alarm Cable (Optional)

An RHUB alarm cable transmits dry node alarm signals.
Prerequisites
Connectors for an alarm cable are prepared.
Context
Figure 6-38 shows the exterior of an RHUB alarm cable. 6.4.2 Cable List shows the
installation position on both ends of the RHUB cable.
Figure 6-38 RHUB alarm cable
Procedure
Step 1 Connect the RJ45 connector on one end of the alarm cable to the EXT_ALM port on the
RHUB.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
44
DBS3900 LampSite Installation Guide
Step 2 Connect the other end of the alarm cable to the alarm cable port on the device to be
monitored.
----End
Follow-up Procedure
1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

6.4.9 Installing Power Cable

The RHUB power cable provides 110 V AC/220 V AC power supply for the RHUB.
Context
Table 6-5 lists the recommended configurations of upper-level circuit breakers and power
cables for a RHUB.
6 Installing an RHUB
Procedure
Step 1 Route the power cable by referring to 6.4.1 Requirements for Cable Layout.
Step 2 Connect the power connector on the X1 end to the AC power input port on the RHUB panel,
Step 3 Connect the power connector on the X2 end to the external power supply port, as shown in
Table 6-5 Configurations of upper-level circuit breakers and power cables
Power Supply
220 V AC single-phase ≥ 6 A
110 V AC single-phase ≥ 10 A
as shown in Figure 6-39.
Figure 6-39.
Upper-level AC Circuit Breaker (For a single RHUB)
Cross-Sectional Area of the Input Power Cable
2
1 mm
1.25 mm
2
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
45
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Figure 6-39 Installing an RHUB power cable
----End
Follow-up Procedure
1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

6.5 Checking the RHUB Hardware Installation

After an RHUB is installed, check the installation of hardware including the devices and related cables.
Table 6-6 lists the hardware installation checking items.
Table 6-6 Hardware installation checking list
No.
1 The position for each device conforms to the engineering design and meets the
2 Ensure that the RHUB is properly installed.
Item
space requirement.
3 The surface of the RHUB is neat and clean. The external paint is intact. The
labels, tags, and nameplates are correct, legible, and complete.
Table 6-7 lists the checking list of the power cable and PGND cable connections.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
46
DBS3900 LampSite Installation Guide
6 Installing an RHUB
Table 6-7 Checklist for power cable and PGND cable connections
No. Item
1 The power cables and PGND cables comply with the requirements of local
regulations.
2 The power cables or the PGND cables are not inversely connected or short-
circuited.
3 The power cables and PGND cables are bound separately from other cables.
4 Labels are attached to both ends of the power cables, PGND cables, optical
fibers, and Ethernet cables.
5 The power cables and PGND cables are intact.
6 The power cables and PGND cables have no weld nugget.
7 No breaking device such as a switch or fuse lies in the electric connection of
the grounding system.
8 The redundant part of PGND cable is stripped off.
9 The lugs at both ends of the power cable or PGND cable are securely soldered
or crimped.
10 The flat washers and spring washers are fixed securely and closely at all the
wiring terminals.
11 The work GND cable and PGND cable of the BTS share a group of grounding
conductors with the lightning and GND cables of the building.
Table 6-8 lists the check items of the signal cable connection.
Table 6-8 Checklist for the signal cable connection
No.
Item
1 The connectors of the signal cables must securely connected.
2 The connectors of the signal cables are intact.
3 The signal cables are intact.
4 The cable ties are evenly spaced. The signal cables are bound neatly with cable
ties to proper tightness, and arranged at even intervals in the same direction.
5 The extra length of the cable ties is cut and removed. The cut surfaces of the
indoor cables are smooth and have no sharp edges.
6 The cable layout facilitates maintenance and expansion.
7 Correct and clear labels are attached to both ends of the signal cables.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
47
DBS3900 LampSite Installation Guide
6 Installing an RHUB
No. Item
8 The distance between the bundled fiber tails and the RHUB panel is less than
70 mm.
Table 6-9 lists the checking items for other cable connections.
Table 6-9 Checklist for other cable connections
No.
1 The connectors of the other cables must securely connected.
2 Labels on the cables are legible and bound based on the engineering
3 Positions for routing the cables must meet requirements of the engineering
Item
requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged.
design.

6.6 Power-on Check on an RHUB

This section describes the power-on check on the RHUB after the RHUB hardware is installed and checked.
Context
DANGER
Power-on check involves high-voltage operation. Be cautious when conducting the power-on check. Any direct contact with the input voltage or indirect contact through damp objects might endanger your life.
Procedure
Step 1 Measure the RHUB earth resistance.
If...
The RHUB earth resistance is less than 10 ohms
The RHUB earth resistance is equal to or larger than 10 ohms
Step 2 Measure the voltage of the RHUB.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Then...
Go to Step 2.
Find out the cause and ensure that the resistance meets requirement. Then, go to Step 2.
48
DBS3900 LampSite Installation Guide
6 Installing an RHUB
If... Then...
The external power supply ranges from
Go to Step 3.
100 V AC to 240 V AC
The external power supply does not range from 100 V AC to 240 V AC
Find out the cause and ensure that the resistance meets requirement. Then, go to Step 3.
Step 3 Power on the RHUB. Wait 3 to 5 minutes, check the status of the RUN indicator of the RHUB
after the RHUB runs properly.
If the Status of
It Indicates that... Then... the RUN Indicator...
Steady on The power supply is
normal while the board
Power off the RHUB, and power on it again after rectifying the board fault.
is faulty.
Steady off There is no power input
or the board is faulty.
Power off the RHUB, and check the power input again. Rectify the board faulty and power on the RHUB again if the power input is normal.
On for 1s and off for 1s
The devices work
properly.
End the operation.
On for 0.125s and off for 0.125s
----End
The board software is
being uploaded.
Power off the RHUB if the uploading is not finished in 5 minutes, and check whether the configuration file is correct. Power on the RHUB again after the fault is rectified.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
49
DBS3900 LampSite Installation Guide
About This Chapter
This chapter describes the pRRU3901 installation process. The pRRU3901 can have two transmission ports (plus PWR port) or three transmission ports (plus PWR port or no PWR port). Unless otherwise specified, this document uses the pRRU3901 with three transmission ports plus no PWR port as an example.

7 Installing a pRRU3901

7 Installing a pRRU3901
7.1 Information About the Installation
This section describes the information that you must be familiar with before installing a pRRU3901, including the pRRU3901 product family, installation scenarios, installation space and environment requirements.
7.2 Obtaining the MAC Address (Optional)
Before installing a pRRU3901, record the media access control (MAC) address, which will be used during pRRU3901 commissioning. This section applies only when a pRRU3901 with three transmission ports is configured with a Wi-Fi daughter board.
7.3 Installation Process
This section describes the pRRU3901 installation process, which involves installing a pRRU3901, and cables, checking the pRRU3901 hardware installation, and powering on the pRRU3901.
7.4 Installing a pRRU3901
This section describes the pRRU3901 installation process. A pRRU3901 can be installed on a wall, ceiling, indoor metal pole, or standard keel, but not on an aluminum panel or a non­standard keel.
7.5 Installing pRRU3901 Cables
This section describes the procedure of installing the pRRU3901 cables.
7.6 Checking the pRRU3901 Hardware Installation
pRRU3901 hardware installation checking includes hardware and cable installation checking.
7.7 Powering on the pRRU3901
This section describes the power-on check on the pRRU3901 after the pRRU3901 hardware is installed and checked.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
50
DBS3900 LampSite Installation Guide

7.1 Information About the Installation

This section describes the information that you must be familiar with before installing a pRRU3901, including the pRRU3901 product family, installation scenarios, installation space and environment requirements.

7.1.1 Product Family

This chapter describes the configurations and functions of the pRRU3901 components.
Table 7-1 lists the pRRU3901 product family.
Table 7-1 pRRU3901 product family
7 Installing a pRRU3901
Category
Main equipment
Auxiliary device
Equip ment
pRRU 3901
Extern al antenn a
Mounti ng kits
ExtenderOptional 1 or 2
Optional or Mandatory
Mandatory 1 Processes the radio
Optional 2 Provides external
Mandatory 1 Supports the pRRU3901
Quantity Function
NOTE
The quantity depends on the number of Ethernet cables in use.
frequency signals.
antennas for the pRRU3901.
NOTE
Configure two external antennas for each RF daughter board.
installation on a wall, pole, ceiling, or keel. The mounting kits vary with the pRRU3901 installation mode.
Extends the distance between the pRRU3901 and RHUB.

7.1.2 Installation Scenario

The pRRU3901 can be installed on a wall, ceiling, pole, or keel. The following table describes the installation in different scenarios.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
51
DBS3900 LampSite Installation Guide
Installing a pRRU3901 on a wall
NOTE
l The pRRU3901 must keep a minimum of 0.5 m away from the power equipment with interference,
and keep a minimum of 2 m away from the source with radiation.
l The pRRU3901 must keep away from a metal wall to avoid the impact on the antenna performance.
When a pRRU3901 is installed on a wall, installation modes vary with the quality of wall, as shown in Table 7-2.
Table 7-2 Wall-mounted suggestion
7 Installing a pRRU3901
Installation Mode
Installing the pRRU3901 on a wall by drilling holes
For details, see
7.4.2 Installing a pRRU3901 on a Wall.
Installing the pRRU on a wall using a V clamp through an attachment plate
For details, see
7.4.5 Installing a pRRU3901 on a Plate.
Requirements Mounting Brackets Installation
Diagram
l The wall can
bear a load at least four times the weight of a pRRU3901.
l The screws must
1. Plate
2. Screw (M6X50)
3. Plastic expansion sleeve
4. Flat washer
be tightened with a torque of 10 N·m. This ensures the screws work properly and the wall remains intact without cracks in it.
l The wall can
bear a load at least four times the weight of a
1. Plate
2. V clamp
3. Bolt (M6X80)
pRRU3901.
l The thickness of
the wall is less than 80 mm.
Installing the pRRU3901 on a wall using a plate on a metal wall
The wall cannot bear a load at least four times the weight of the pRRU. For example, EPS walls,
The plate is prepared by customers.
MDF walls, or walls cannot be drilled.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
52
DBS3900 LampSite Installation Guide
Installing a pRRU3901 on a ceiling
When a pRRU3901 is installed on a ceiling, installation modes vary with the quality of the ceiling, as shown in Table 7-3.
Table 7-3 Ceiling-mounted suggestion
7 Installing a pRRU3901
Installation Mode
Installing the pRRU3901 on a ceiling by drilling holes
For details, see
7.4.3 Installing a pRRU3901 on a Ceiling.
Installing the pRRU3901 on a ceiling using a V clamp through an attachment plate
For details, see
7.4.5 Installing a pRRU3901 on a Plate.
Requirements Mounting Brackets Installation
Diagram
l The ceiling, such
as a concrete ceiling, can bear a load at least four times the weight of the
1. Plate
2. Screw (M6X50)
3. Plastic expansion sleeve
4. Flat washer
pRRU3901.
l The screws must
be tightened with a torque of 10 N·m. This ensures the screws work properly and the ceiling remains intact without cracks in it.
l The ceiling, such
as a concrete ceiling, can bear a load at least
1. Plate
2. V clamp
3. Bolt (M6X80)
four times the weight of the pRRU3901.
l The thickness of
the ceiling is less than 80 mm.
Installing the pRRU3901 on a pole
For details, see
7.4.4
A pole under the ceiling can bear a load at least four times the weight of the pRRU3901.
For details, see Table
7-4.
Installing a pRRU3901 on a Pole.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
For details, see Table
7-4.
53
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Installation Mode
Installing the pRRU3901 on a keel
For details, see
7.4.6 Installing a pRRU3901 on a Keel.
Requirements Mounting Brackets Installation
A keel under the ceiling can bear a load at least four times the weight of the pRRU3901.
Installing the pRRU3901 on a pole
When a pRRU3901 is installed on a pole, installation modes vary with the diameter of the pole, as shown in Table 7-4.
Table 7-4 Pole-mounted suggestion
Installation Mode
Requirements Mounting Brackets Installation
For details, see Table
7-5.
Diagram
For details, see Table
7-5.
Diagram
Installing the pRRU3901 on a pole
For details, see
7.4.4 Installing a pRRU3901 on a Pole.
The diameter of the pole ranges from 30 mm to 70 mm.
The diameter of the pole ranges from 70 mm to 110 mm.
Installing the pRRU3901 on a keel
1. Plate
2. V clamp
3. Bolt (M6X80)
1. Plate
2. Hose clamp, which is
prepared by the customer
The pRRU3901 can be installed on a keel of U-shape, T-shape, or H-shape. For the keels of other shapes, they are determined based on the onsite requirements.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
54
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Table 7-5 Keel-mounted installation suggestion
Installation
Requirements Mounting Brackets Installation
Mode
Installing the pRRU3901 on a keel
For details, see
The keel is in U­shape, T-shape, H­shape, or other shapes.
7.4.6 Installing a pRRU3901 on a Keel.

7.1.3 Space Requirements

This chapter describes the space requirements of the pRRU3901.
When the pRRU3901 is installed on a wall, ceiling, pole or keel, the minimum space is required for easy cabling and O&M. Based on the engineering practice, the recommendation for the installation space is provided.
NOTE
During installation, a minimum clearance of 2 m must be reserved between the pRRU3901 working on the 2.6 GHz band and the Wi-Fi module if they need to process services concurrently.
Diagram
1. Plate
2. V clamp
3. Bolt (M6X80)
shows the pRRU installed on a U­shaped keel.
Figure 7-1 shows the recommended space requirements of the pRRU3901.
Figure 7-1 Recommended space requirements of the pRRU3901
The recommended space for installing a single pRRU3901 is described as follows:
l At least 300 mm above the pRRU3901 is reserved for maintenance.
l At least 300 mm under the pRRU3901 is reserved for cabling.
l At least 300 mm on the left of the pRRU3901 is reserved for maintenance.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
55
DBS3900 LampSite Installation Guide
l At least 300 mm on the right of the pRRU3901 is reserved for maintenance.
l At least 400 mm in front of the pRRU3901 is reserved for maintenance
l At least 40 mm on the back of the pRRU3901 is reserved for ventilation.

7.1.4 Installation Environment Requirements

The installation environment of a pRRU3901 involves the running environment specifications for the pRRU3901 and other specifications.
Running Environment Specifications
Table 7-6 shows the environment specifications for the pRRU3901 installed indoors.
Table 7-6 pRRU3901 environment specifications
7 Installing a pRRU3901
Specificat ions
Operating temperatur e
Relative humidity
Altitude - 60 m to + 1800 m Works properly.
Condition Remarks
- 5°C to + 40°C -
5% RH to 95% RH -
1800 m to 4000 m Above the 1800 m altitude, the
Other Running Environment Specifications
l The pRRU3901 cannot be installed at an air outlet of the heat dissipation box of an air
conditioner or other heat-generating appliances.
l The pRRU3901 cannot be installed near a strong heat source.
maximum operating temperature decreases by 1°C each time the altitude increases by 220 m.
l The pRRU3901 cannot be installed in a position with water dripping, such as outdoor
equipment of air conditioners, pipe, and leaking or dripping roofs.
l The installation position must be far from rains. If the pRRU3901 is installed on a wall,
there must be no window on either side of the wall.
l The installation position must be far away from high voltage, highly corrosive devices,
flammable or explosive substances, and electromagnetic interference (such as power stations, high-voltage substations, and wired TV towers.
l The pRRU3901 must be installed in a dry, ventilating, and dust-proof place.
l If the pRRU3901 is installed in parking areas or basements, the installation position must
be well-ventilated.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
56
DBS3900 LampSite Installation Guide

7.2 Obtaining the MAC Address (Optional)

Before installing a pRRU3901, record the media access control (MAC) address, which will be used during pRRU3901 commissioning. This section applies only when a pRRU3901 with three transmission ports is configured with a Wi-Fi daughter board.
Context
The MAC address indicates the IP address through which a device can be reached.
Procedure
Step 1 Remove the backup WIFI MAC label from the front housing of the pRRU3901 and keep
them secure, as shown in Figure 7-2.
NOTE
l Do not remove the WIFI MAC label on the side of the pRRU3901 housing.
l Before removing the backup WIFI MAC label, photograph it.
7 Installing a pRRU3901
Figure 7-2 Removing backup WIFI MAC label
Step 2 Save the MAC according to 11.1 MAC Collection Template, and report it to the pRRU3901
commissioning personnel.
----End

7.3 Installation Process

This section describes the pRRU3901 installation process, which involves installing a pRRU3901, and cables, checking the pRRU3901 hardware installation, and powering on the pRRU3901.
Figure 7-3 shows the pRRU3901 installation process.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
57
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-3 pRRU3901 installation process

7.4 Installing a pRRU3901

This section describes the pRRU3901 installation process. A pRRU3901 can be installed on a wall, ceiling, indoor metal pole, or standard keel, but not on an aluminum panel or a non­standard keel.
NOTE
Note the following when installing the pRRU3901:
l The pRRU3901 cannot be grounded. If the pRRU3901 is grounded but the RHUB connected to this
pRRU3901 is not, the pRRU3901 may fail to be powered on.
l A minimum distance of 50 cm must be reserved between the pRRU3901 and the incandescent lamp.
l The installation spacing between the pRRU3901 and the temperature sensor must be greater than 50
cm.
l It is good practice to install the pRRU3901 on materials that can tolerate a temperature higher than
65°C and have an ignition point higher than 70°C.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
58
DBS3900 LampSite Installation Guide

7.4.1 pRRU3901 Mounting Kits

This section describes the pRRU3901 mounting kits.
Figure 7-4 shows the exterior of the pRRU3901 mounting kits.
Figure 7-4 pRRU3901 mounting kits
7 Installing a pRRU3901
(1) V clamp (2) Mounting bracket (3) Screw (M6x50)
(4) Plastic expansion sleeve (5) Bolt (M6x80) (6) Flat washer
The following figure shows the specifications of the mounting bracket.
Figure 7-5 Mounting bracket specifications
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
59
DBS3900 LampSite Installation Guide

7.4.2 Installing a pRRU3901 on a Wall

This section describes how to install a pRRU3901 on an indoor wall. If a wall indoors has adequate load bearing capacity and installation space, it is good practice to install the pRRU3901 on the wall. If the wall does not have adequate load bearing capacity, choose an installation mode based on site requirements.
Context
NOTICE
This section describes only the wall-mounted installation in which mounting kits are directly installed on the wall without auxiliary devices. The procedure for other wall-mounted installation modes is similar.
Procedure
7 Installing a pRRU3901
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and
the clearance requirements.
NOTE
For details about the clearance requirements, see 7.1.3 Space Requirements.
Step 2 Place the mounting bracket in the installation position against the wall. Then, level the
mounting bracket and use a marker to mark two anchor points. See Figure 7-6.
Figure 7-6 Anchor points on the pRRU3901 mounting bracket (unit: mm)
(1) Wall (2) Mounting bracket (3) Anchor point
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
60
DBS3900 LampSite Installation Guide
Step 3 Use a hammer drill with φ8 bore to drill holes at the marked anchor points, as shown in
7 Installing a pRRU3901
CAUTION
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes.
Figure 7-7. Use a vacuum cleaner to clean the dust inside and around the holes and measure
the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole.
Figure 7-7 Drilling holes and installing expansion bolts
Step 4 Lead the M6x50 screws through the washers, and then through the drilling holes on the
mounting bracket to the plastic expansion sleeves, and torque the screws to 5 N•m, as shown in Figure 7-8.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
61
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-8 Installing the mounting bracket
NOTE
If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation.
Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and
then press the pRRU3901 downwards until a click is heard. See Figure 7-9.
NOTE
It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
62
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-9 Installing the pRRU3901 on a wall
----End

7.4.3 Installing a pRRU3901 on a Ceiling

This section describes how to install a pRRU3901 on the ceiling, such as the concrete ceiling, when the ceiling has adequate load bearing capacity and installation space.
Context
NOTICE
If the pRRU3901 is installed on a ceiling, the temperature of the ceiling may increase by a maximum of 30 degrees. Therefore, whether a pRRU3901 can be installed on a ceiling depends on the ceiling material.
Procedure
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and
the clearance requirements.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
63
DBS3900 LampSite Installation Guide
Step 2 Place the mounting bracket in the installation position against the ceiling. Then, level the
7 Installing a pRRU3901
NOTE
For details about the clearance requirements, see 7.1.3 Space Requirements.
mounting bracket and use a marker to mark two anchor points. See Figure 7-10.
Figure 7-10 Anchor points on the pRRU3901 mounting bracket (unit: mm)
(1) Ceiling (2) Mounting bracket (3) Anchor point
CAUTION
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes.
Step 3 Use a hammer drill with φ8 bore to drill holes at the marked anchor points, as shown in
Figure 7-11. Use a vacuum cleaner to clean the dust inside and around the holes and measure
the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
64
DBS3900 LampSite Installation Guide
Step 4 Lead the M6x50 screws through the washers, and then through the drilling holes on the
7 Installing a pRRU3901
Figure 7-11 Drilling holes and installing expansion bolts
mounting bracket to the plastic expansion sleeves, and use a torque screwdriver to torque the screws to 5 N•m, as shown in Figure 7-12.
Figure 7-12 Installing the mounting bracket
NOTE
If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation.
Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and
then press the pRRU3901 downwards until a click is heard. See Figure 7-13.
NOTE
It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
65
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-13 Installing a pRRU3901 on a ceiling
----End

7.4.4 Installing a pRRU3901 on a Pole

This section describes how to install a pRRU3901 on a metal pole indoors.
Procedure
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and
the clearance requirements.
NOTE
For details about the clearance requirements, see 7.1.3 Space Requirements.
Step 2 If the diameter of the pole ranges from 30 mm to 70 mm, use the delivered V clamp,
mounting bracket, and bolts to install the pRRU3901 on the pole. Lead the M6x80 bolts through the mounting bracket, and torque the bolts to 5 N•m, as shown in Figure 7-14.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
66
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-14 Securing the pRRU3901 mounting bracket on the metal pole
If the diameter of the pole is greater than 70 mm, use the hose clamp to install the mounting bracket on the pole. The hose clamp is prepared by customers. Torque the bolts to 5 N•m, as shown in Figure 7-15.
Figure 7-15 Securing the pRRU3901 mounting bracket on the metal pole
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
67
DBS3900 LampSite Installation Guide
Step 3 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and
7 Installing a pRRU3901
then press the pRRU3901 downwards until a click is heard. See Figure 7-16.
NOTE
It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes.
Figure 7-16 Installing a pRRU3901 on a pole
----End

7.4.5 Installing a pRRU3901 on a Plate

This section describes how to install a pRRU3901 on a plate. If a suspended ceiling plate has adequate load bearing capacity and installation space, the pRRU3901 can be installed on the plate. However, it is good practice not to install a pRRU3901 on an aluminum plate.
Procedure
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and
the clearance requirements.
NOTE
For details about the clearance requirements, see 7.1.3 Space Requirements.
Step 2 Place the mounting bracket in the installation position against the wall. Then, level the
mounting bracket and use a marker to mark two anchor points. See Figure 7-17.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
68
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-17 Anchor points on the pRRU3901 mounting bracket (unit: mm)
(1) Plate (2) Mounting bracket (3) Anchor point
CAUTION
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes.
Step 3 Use a hammer drill with φ8 bore to drill holes at the anchor points.
Step 4 Lead the M6x80 bolts through the mounting bracket and the ceiling plate, and use a torque
screwdriver to torque the bolts to 5 N•m, as shown in Figure 7-18.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
69
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-18 Installing the pRRU3901 mounting bracket
Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and
then press the pRRU3901 downwards until a click is heard. See Figure 7-19.
NOTE
It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
70
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-19 Installing a pRRU3901 on a plate
----End

7.4.6 Installing a pRRU3901 on a Keel

This section describes how to install a pRRU3901 on a keel. If a suspended ceiling plate cannot bear the pRRU3901, the pRRU3901 can be installed on the keel on the ceiling.
Context
Before installing the pRRU3901 on a keel, ensure that the keel is strong enough to bear the pRRU3901.
l The mounting bracket of the pRRU3901 can be installed on the keel of the following
specifications: GBT 11981-2008, JIS A6517-2002, and ASTM C635 C635M-2007. The installation mode depends on onsite requirements because there are various keels.
l This section describes the procedure of installing a pRRU3901 on the keel of JIS
standard used in Japan. The procedure of installing a pRRU3901 on other keels is the same as that of installing a pRRU3901 on the keel of JIS standard.
Procedure
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and
the clearance requirements.
NOTE
For details about the clearance requirements, see 7.1.3 Space Requirements.
Step 2 Place the V clamp across the keel, and use a marker to mark the projective positions of the
mounting holes on the suspended ceiling plate, as shown in Figure 7-20.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
71
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-20 Anchor points on the suspended ceiling plate (unit: mm)
CAUTION
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes.
Step 3 Use a hammer drill to drill holes at the anchor points. You are advised to use the hammer drill
with Ф12 bore.
Step 4 Lead the M6x80 bolts through the mounting bracket and the suspended ceiling plate. Use a
torque screwdriver to torque the bolts to 5 N•m, as shown in Figure 7-21.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
72
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-21 Installing the pRRU3901 mounting bracket
Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and
then press the pRRU3901 downwards until a click is heard. See Figure 7-22.
NOTE
It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
73
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-22 Installing a pRRU3901 on a keel
----End

7.5 Installing pRRU3901 Cables

This section describes the procedure of installing the pRRU3901 cables.

7.5.1 Requirements for Cable Layout

Cables must be routed according to the specified cabling requirements to prevent signal interference.
NOTE
If certain cables listed below are not required, skip the requirements for routing these cables.
General Requirements for Cable Layout
National Standards
l Code for Engineering Design of Generic Cabling System for Building and Campus (GB
50311-2007)
l Code for Engineering Acceptance of Generic Cabling System for Building and Campus
(GB50312-2007).
l Security Protection Engineering Technology Specifications (GB 50348-2004)
l Code for Construction and Acceptance of the Electronic Information System Room (GB
50462-2008)
l Code for Quality Acceptance of the Intelligent Building Engineering (GB 50339-2003)
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
74
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
l Code for Quality Acceptance of Electric Engineering Construction in Building (GB
50303-2002)
l Technical Specification for Construction and Acceptance of Telecommunication Conduit
Engineering (GB 50374-2006)
International Standards
l Generic Cabling for Customer Premises (ISO/IEC 11801)
l Commercial Building Telecommunications Cabling Standard (EIA/TIA 568)
l Commercial Building Standard for Telecommunication Pathways and Spaces (EIA/TIA
569)
l Administration Standard for Commercial Telecommunications Infrastructure (EIA/TIA
606)
l Grounding and Bonding Requirements for Telecommunications in Commercial
Buildings (EIA/TIA 607)
l Generic Cabling Systems for Information Technology (EN 50173)
l Cabling Installation for Information Technology (EN 50174)
Bending radius
l The bending radius of a 1/4'' jumper, a 1/2'' softer jumper, and a 1/2'' common jumper
must be longer than 35 mm, 50 mm, and 127 mm, respectively.
l The bending radius of a power cable is at least three times the diameter of the cable.
l The bending radius of a signal cable must be at least five times of the diameter of the
cable.
Cable binding
l Cables of the same type are bound together.
l Different types of cables must be separately routed with a minimum spacing of 30 mm
and cannot be entangled.
l The cables are bound tightly and neatly and the sheaths of the cables is intact.
l The cable ties face the same direction and all cable ties bound at similar positions must
be in a straight line.
l The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for
each outdoor cable tie before the extra length is cut off. All cut surfaces are without sharp edges.
l Labels or nameplates are attached to both ends, joints, or turns of cables after they are
installed.
Safety
l The steel pipe or fire-resistant rigid polyvinyl chloride pipe should be used for the cable
duct or for routing cables. The cross-sectional usage of the cable duct should be 30% to 50% and that of the pipe for routing cables should be 25% to 30%.
l Cables are placed away from sharp objects or wall burrs. If these positions are inevitable,
protection pipes are required for the cables.
l Cables are routed away from heat sources, or heat-insulation materials are added
between cables and heat sources.
l A clearance is reserved at turns of a cable or the position close to a device, facilitating
cable and device maintenance. The recommended clearance is about 0.1 m.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
75
DBS3900 LampSite Installation Guide
Requirements for Special Cables
Ethernet Cable
l A maximum of 100 Ethernet cables can be bundled if no PVC pipes are used. If pipes are
used, a maximum of 24 Ethernet cables can be led through a pipe. In this case, ensure that 1/3 space inside the pipes must be vacant.
l The point at which an Ethernet cable is bundled must be spaced 400 mm or less from the
Ethernet port on a pRRU.
l For the pRRU3901 used in the elevator engine room on the rooftop, generator set for the
subway engine, and equipment room with central air conditioning, Ethernet cables must be led through metallic conduits that are reliably grounded at both ends.

7.5.2 pRRU3901 Cable List

This section describes pRRU3901 cable connections.
Table 7-7 lists pRRU3901 cables.
Table 7-7 List of pRRU3901 cables
7 Installing a pRRU3901
Cable
One End The Other End
Connector Connected
Connector Connected to ...
to ...
Ethernet Cable
RJ45 connector CPRI_E0~CP
RI_E7 port on RHUB
RJ45 connector Transmission
port on Access
RJ45 connector CPRI_E0~CPRI_
E1 port on pRRU3901
RJ45 connector GE port on
pRRU3901
Control(AC)
(Optional) RF Jumper
SMA straight male connector
External antenna TX/RX RF port on
Based on the port model of the antenna system.
Antenna system
pRRU3901
NOTE
l The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected
using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901.
l The Ethernet cable used for connecting the GE port on the pRRU3901 to the transmission port on
the AC is required only when the pRRU3901 have three transmission ports and is configured with the Wi-Fi daughter board.

7.5.3 Cable Connections

This section describes the cable connections for a single pRRU3901 and multiple pRRU3901s in UMTS, LTE FDD, UMTS+LTE FDD, LTE FDD+LTE FDD mode.
Before installing the pRRU3901 cables, you must be aware of the following information:
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
76
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
l The pRRU3901 can obtain power supply through the power over Ethernet (PoE).
l For external antennas corresponding to RF daughter board 1, the TX port and RX port
are ANT0 and ANT1, respectively. For external antennas corresponding to RF daughter board 2, the TX port and RX port are ANT2 and ANT3, respectively. For external antennas corresponding to RF daughter board 3, the TX port and RX port are ANT4 and ANT5, respectively.
l The external antenna system is optional, and the pRRU3901 jumpers are not delivered.
By default, the pRRU3901s are configured with built-in antennas. If the external antenna system is connected, the antenna system automatically switches to the external one. One end of the pRRU3901 RF jumper is the SMA male connector, which is connected to the external antenna TX/RX RF port on the pRRU3901. The other end of the pRRU3901 RF jumper is the type N male connector, which is connected to the antenna system. For the standard of the pRRU3901 RF jumper, see (Optional) RF Jumper of the DBS3900 LampSite Hardware Description.
Figure 7-23 shows the cable connection when the pRRU3901 is configured with only one RF
Daughter Board.
Figure 7-23 pRRU3901 cable connection (1)
(1) Ethernet cable (2) RF jumper
NOTE
l The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected
using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901.
l When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the
CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd­numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example.
Figure 7-24 shows the cable connection when the pRRU3901 is configured with two RF
Daughter Boards.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
77
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-24 pRRU3901 cable connection (2)
(1) Ethernet cable (2) RF jumper
NOTE
l The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected
using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901.
l When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the
CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd­numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example.
Figure 7-24 shows the cable connection when the pRRU3901 is configured with two RF
Daughter Boards and one Wi-Fi daughter board.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
78
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-25 pRRU3901 cable connection (3)
(1) Ethernet cable (2) RF jumper
NOTE
l The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected
using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901.
l When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the
CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd­numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example.

7.5.4 Cable Connections (LTE TDD)

This section describes the cable connections for a single pRRU3901 and multiple pRRU3901s in LTE TDD mode.
Before installing the pRRU3901 cables, you must be aware of the following information:
l The pRRU3901 can obtain power supply through the power over Ethernet (PoE).
l For external antennas corresponding to RF daughter board 1, the TX port and RX port
are ANT0 and ANT1, respectively. For external antennas corresponding to RF daughter board 2, the TX port and RX port are ANT2 and ANT3, respectively. For external antennas corresponding to RF daughter board 3, the TX port and RX port are ANT4 and ANT5, respectively.
l The external antenna system is optional, and the pRRU3901 jumpers are not delivered.
By default, the pRRU3901s are configured with built-in antennas. If the external antenna system is connected, the antenna system automatically switches to the external one. One end of the pRRU3901 RF jumper is the SMA male connector, which is connected to the
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
79
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
external antenna TX/RX RF port on the pRRU3901. The other end of the pRRU3901 RF jumper is the type N male connector, which is connected to the antenna system. For the standard of the pRRU3901 RF jumper, please see (Optional) RF Jumper of the DBS3900 LampSite Hardware Description.
Figure 7-26 shows the cable connection when the pRRU3901 is configured with only one RF
Daughter Board.
Figure 7-26 pRRU3901 cable connection (1)
(1) Ethernet cable (2) RF jumper
NOTE
The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.
Figure 7-27 shows the cable connection when the pRRU3901 is configured with one RF
Daughter Boards and one Wi-Fi daughter board.
Figure 7-27 pRRU3901 cable connection (2)
(1) Ethernet cable (2) RF jumper
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
80
DBS3900 LampSite Installation Guide
NOTE
The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.

7.5.5 pRRU3901 cable installation process

This section describes the process of installing pRRU3901 cables.
Figure 7-28 shows the process of installing pRRU3901 cables.
Figure 7-28 pRRU3901 cable installation process
7 Installing a pRRU3901

7.5.6 Installing an Ethernet Cable

This section describes how to install an Ethernet cable.
Prerequisites
l The Ethernet cable must be of Category 5e (enhanced) or higher. In addition, its cross-
sectional area must be 24 AWG or larger and frame spread rating must be CM or higher.
l The Ethernet cables can be straight-through cables or crossover cables.
l With the internal PoE module providing power, the maximum length of an Ethernet
cable is 100 m. With the Extender, the distance of the pRRU3901 and RHUB can be extended by the Extender up to a total distance of 200 m.
l Ethernet cables are not delivered, and they must be prepared onsite. You need to use a
network cable tester to test the Ethernet cable connection.
Context
The Ethernet cable has the following functions:
l Provides power supply for the pRRU3901 when the cable connects the CPRI_E0 port on
the pRRU3901 to the RHUB.
l Transmits CPRI signals between an RHUB and a pRRU3901.
l Provides Wi-Fi services for the pRRU3901 when the cable connects the GE port on the
pRRU3901 with three transmission ports to the AC.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
81
DBS3900 LampSite Installation Guide
Procedure
Step 1 Make the Ethernet cables.
7 Installing a pRRU3901
Using the CPRI_E1 port on the pRRU3901 has the same Ethernet cable connection to the RHUB as using the CPRI_E0 port. The following section describes the connection using the CPRI_E0 port.
1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable of Installation Reference.
NOTE
Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the unshielded RJ45 connector and the Ethernet cable.
Otherwise, the transmission signal quality deteriorates and CPRI links may be disconnected.
2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips.
3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2.
4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference.
Step 2 Install an Ethernet cable between an RHUB and a pRRU3901.
1. Remove the dustproof cap of the CPRI_E0 port on the pRRU3901.
2. Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the pRRU3901 panel.
3. Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender.
4. Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design, as shown in Figure 7-29.
Step 3 Optional: Install the Ethernet cable between the pRRU3901 and the AC. This operation is
required when the pRRU3901 with three transmission ports is configured with a Wi-Fi daughter board.
1. Remove the dustproof cap of the GE port on the pRRU3901.
2. Connect the RJ45 connector at one end of the Ethernet cable to the GE port on the pRRU3901 panel.
3. Connect the RJ45 connector at the other end of the Ethernet cable to the transmission port of the AC based on the engineering design, as shown in Figure 7-29.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
82
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-29 Installing an Ethernet cable
(1) Ethernet cable (2) GE port on the pRRU3901 (3) CPRI_E0 port on the pRRU3901
NOTE
The pRRU3901 can have two transmission ports plus one PWR port or three transmission ports (plus one PWR port or no PWR port), requiring the same installation operations. This section uses the pRRU3901 with three transmission ports no PWR port as an example.
----End
Follow-up Procedure
1. Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

7.5.7 Installing an RF jumpers (Optional)

The RF jumpers transmit radio frequency signals. One end of the RF jumpers is the SMA straight male connector, and the other end is the type N connector.
Context
l If the RF jumper is provided by the customer, the jumper must not be lower than the
RG316 specifications. In addition, the jumpers can be used after they are checked by Huawei engineers.
l pRRU3901s can be connected to external whip antennas or external remote antennas
(through pRRU3901 RF jumpers). Whip antennas are delivered optionally. RF jumpers are not delivered.
Procedure
Step 1 Expose the SMA female connector by removing the pRRU3901 antenna housing, as shown in
Figure 7-30.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
83
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Figure 7-30 Removing the pRRU3901 antenna housing
Step 2 Use a torque wrench with a torque of 0.6 N•m to connect the SMA straight male connector on
a jumper to the ANT port on the pRRU3901 panel.
NOTICE
Tighten it with hands, and then use a torque wrench to tighten it with a rotational speed of less than or equal to 2.4 rpm to tighten it.
Step 3 Connect the type N female connector of the jumper to the type N male connector of the RF
feeder connected to the built-in antenna.
NOTICE
Tighten the feeder close to the type N connector to ensure that the jumper is not tightened. In this way, the connectors on both ends of a jumper are not affected by the external force.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
84
DBS3900 LampSite Installation Guide
Figure 7-31 Installing jumpers between the pRRU3901 and external antennas
----End
Follow-up Procedure
7 Installing a pRRU3901
1. Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1
Requirements for Cable Layout.
2. Label the installed cable. For details, see section 11.3 Attaching an L-Shaped Label.

7.6 Checking the pRRU3901 Hardware Installation

pRRU3901 hardware installation checking includes hardware and cable installation checking.
Table 7-8 lists the hardware installation checking items.
Table 7-8 Hardware installation checking list
No.
1 Ensure that the pRRU3901 is not grouned.
2 The position for each device conforms to the engineering design and meets the
3 Ensure that the pRRU3901 is properly installed.
4 The surface of the pRRU3901 is neat and clean. The external paint is intact.
Item
space requirement.
The labels, tags, and nameplates are correct, legible, and complete.
Table 7-9 lists the check items of the signal cable connection.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
85
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
Table 7-9 Checklist for the signal cable connection
No. Item
1 The connectors of the signal cables must securely connected.
2 The connectors of the signal cables are intact.
3 The signal cables are intact.
4 The cable ties are evenly spaced. The signal cables are bound neatly with cable
ties to proper tightness, and arranged at even intervals in the same direction.
5 The extra length of the cable ties is cut and removed. The cut surfaces of the
indoor cables are smooth and have no sharp edges.
6 The cable layout facilitates maintenance and expansion.
7 Correct and clear labels are attached to both ends of the signal cables.
Table 7-10 lists the checking items for other cable connections.
Table 7-10 Checklist for other cable connections
No.
1 The connectors of the other cables must securely connected.
2 Labels on the cables are legible and bound based on the engineering
3 Positions for routing the cables must meet requirements of the engineering
Item
requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged.
design.

7.7 Powering on the pRRU3901

This section describes the power-on check on the pRRU3901 after the pRRU3901 hardware is installed and checked.
Procedure
Step 1 Power on the pRRU3901. Wait 3 to 5 minutes, check the status of the RUN indicator on the
pRRU3901.
If the RUN Indicator...
Steady on There is power input, but the
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Because... Then...
board is faulty.
Power off the power supply, rectify the fault, and power on the pRRU3901.
86
DBS3900 LampSite Installation Guide
7 Installing a pRRU3901
If the RUN Indicator... Because... Then...
Steady off There is no power input, or an
alarm is reported on the board.
Power off the power supply and check the power input. If no fault is found after the pRRU3901 is powered off, clear the fault on the board, and power on the pRRU3901.
On for 1s and off for 1s The device works properly. End this operation.
On for 0.125s and off for
0.125s
The software of the board is loading.
Wait five minutes for the software to be successfully loaded. If the software is loading five minutes later, shut off the power supply. Check whether the data configuration file is correct. After the fault is rectify, power on the pRRU3901 again.
----End
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
87
DBS3900 LampSite Installation Guide
About This Chapter
This chapter describes the pRRU3902 installation process.

8 Installing a pRRU3902

8 Installing a pRRU3902
8.1 Information About the Installation
This section describes the information that you must be familiar with before installing a pRRU3902, including the pRRU3902 product family, installation scenarios, installation space and environment requirements.
8.2 Installation Process
This section describes the pRRU3902 installation process, which involves installing a pRRU3902, and cables, checking the pRRU3902 hardware installation, and powering on the pRRU3902.
8.3 Installing a pRRU3902
This section describes the pRRU3902 installation process. A pRRU3902 can be installed on a wall, ceiling, indoor metal pole, or keel, but not on an aluminum panel or a non-standard keel.
8.4 Installing pRRU3902 Cables
This section describes the procedure of installing the pRRU3902 cables.
8.5 (Optional) Installing a Combiner
This section describes how to install a combiner.
8.6 Checking the pRRU3902 Hardware Installation
pRRU3902 hardware installation checking includes hardware and cable installation checking.
8.7 Powering on the pRRU3902
This section describes the power-on check on the pRRU3902 after the pRRU3902 hardware is installed and checked.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
88
DBS3900 LampSite Installation Guide

8.1 Information About the Installation

This section describes the information that you must be familiar with before installing a pRRU3902, including the pRRU3902 product family, installation scenarios, installation space and environment requirements.

8.1.1 pRRU3902 Product Family

This chapter describes the configurations and functions of the pRRU3902 components.
Table 8-1 lists the pRRU3902 product family.
Table 8-1 pRRU3902 product family
8 Installing a pRRU3902
Category
Main equipment pRRU3902
Equipment Optional or
with internal antennas
pRRU3902 supporting external antennas
Combiner Optional 2 Combines
Quantity Function
Mandatory
Mandatory 1 Functions as a
remote radio unit that processes RF signals.
Mandatory 1 Functions as a
remote radio unit that processes RF signals. It has no internal antennas and must connect to external antennas.
signals of RF units operating in different frequency bands.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
89
DBS3900 LampSite Installation Guide
8 Installing a pRRU3902
Category Equipment Optional or
Quantity Function
Mandatory
Auxiliary device Mounting kits Mandatory 1 Supports the
pRRU3902 installation on a wall, ceiling, or keel. The mounting kits vary with the pRRU3902 installation mode.
Extender Optional 1 or 2
NOTE
The quantity depends on the number of Ethernet cables in use.
Extends the distance between the pRRU3902 and RHUB.

8.1.2 pRRU3902 Installation Scenario

The pRRU3902 can be installed on a wall, ceiling, or keel. The following table describes the installation in different scenarios.
Installing a pRRU3902 on a wall
NOTE
l The pRRU3902 must keep a minimum of 0.5 m away from the power equipment with interference,
and keep a minimum of 2 m away from the source with radiation.
l The pRRU3902 must keep away from a metal wall to avoid the impact on the antenna performance.
When a pRRU3902 is installed on a wall, installation modes vary with the quality of wall, as shown in Table 8-2.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
90
DBS3900 LampSite Installation Guide
8 Installing a pRRU3902
Table 8-2 Wall-mounted suggestion
Installation Mode
Installing the pRRU3902 on a wall by drilling holes
For details, see 8.3.2
Installing a pRRU3902 on a Wall.
Installing the pRRU3902 on a wall using a clamp through an attachment plate
For details, see 8.3.4
Installing a pRRU3902 on a Plate.
Requirements Mounting Brackets Installation
Diagram
l The wall can bear
a load at least four times the weight of a pRRU3902.
l The screws must
be tightened with
1. Plate
2. Screw (M3.5x35)
3. Plastic expansion sleeve
4. Flat washer
a torque of 1.5 N·m. This ensures the screws work properly and the wall remains intact without cracks in it.
l The wall can bear
a load at least four times the weight of a pRRU3902.
l The thickness of
1. Plate
2. Clamp
3. Bolt (M4x35)
4. Bolt (M4x60)
the wall is less than 45 mm.
Installing the pRRU3902 on a wall using a plate on a metal wall
The wall cannot bear a load at least four times the weight of the pRRU3902. For example, EPS walls, MDF walls, or walls
The plate is prepared by customers.
cannot be drilled.
Installing a pRRU3902 on a ceiling
When a pRRU3902 is installed on a ceiling, installation modes vary with the quality of the ceiling, as shown in Table 8-3.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
91
DBS3900 LampSite Installation Guide
8 Installing a pRRU3902
Table 8-3 Ceiling-mounted suggestion
Installation Mode
Installing the pRRU3902 on a ceiling by drilling holes
For details, see 8.3.3
Installing a pRRU3902 on a Ceiling.
Installing the pRRU3902 on a ceiling using a clamp through an attachment plate
For details, see 8.3.4
Installing a pRRU3902 on a Plate.
Requirements Mounting Brackets Installation
Diagram
l The ceiling, such
as a concrete ceiling, can bear a load at least four times the weight of the pRRU3902.
1. Plate
2. Screw (M3.5 x 35)
3. Plastic expansion sleeve
4. Flat washer
l The screws must
be tightened with a torque of 1.5 N·m. This ensures the screws work properly and the ceiling remains intact without cracks in it.
l The ceiling, such
as a concrete ceiling, can bear a load at least four times the weight
1. Plate
2. U-shaped metal plate
3. Bolt (M4 x 35)
4. Bolt (M4 x 60)
of the pRRU3902.
l The thickness of
the ceiling is less than 45 mm.
Installing the pRRU3902 on a keel
For details, see 8.3.5
A keel under the ceiling can bear a load at least four times the weight of the pRRU3902.
For details, see Table
8-4.
Installing a pRRU3902 on a Keel.
Installing the pRRU3902 on a keel
The pRRU3902 can be installed on a keel of U-shape, T-shape, or H-shape. For the keels of other shapes, they are determined based on the onsite requirements.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
For details, see Table
8-4.
92
DBS3900 LampSite Installation Guide
8 Installing a pRRU3902
Table 8-4 Keel-mounted installation suggestion
Installation Mode
Installing the pRRU3902 on a keel
For details, see 8.3.5
Installing a pRRU3902 on a Keel.
Requirements Mounting Brackets Installation
The keel is in U­shape, T-shape, H­shape, or other shapes.
1. Plate
2. U-shaped metal plate
3. Bolt (M4 x 35)
4. Bolt (M4 x 60)
Installing the pRRU3902 on a on steel hangers
Either M6 or M8 steel hangers can be used for installation.
Table 8-5 Steel hangers installation suggestion
Diagram
shows the pRRU3902 installed on a U­shaped keel.
Installation Mode
Installing the pRRU3902 on a steel hangers
For details, see 8.3.6
Installing a pRRU3902 on Steel Hangers.
Requirements Mounting Brackets Installation
Either M6 or M8 steel hangers can be used for installation.

8.1.3 Space Requirements

This chapter describes the space requirements of the pRRU3902.
When the pRRU3902 is installed on a wall, ceiling, pole or keel, the minimum space is required for easy cabling and O&M. Based on the engineering practice, the recommendation for the installation space is provided.
Diagram
1. Plate
2. U-shaped metal plate
3. Bolt (M4 x 35)
4. Bolt (M4 x 60)
Figure 8-1 shows the recommended space requirements of the pRRU3902 when the external
antenna is required.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
93
DBS3900 LampSite Installation Guide
8 Installing a pRRU3902
Figure 8-1 Recommended space requirements of the pRRU3902
When the external antenna is required, the recommended space for installing a single pRRU3902 is described as follows:
l At least 300 mm above the pRRU3902 is reserved for maintenance.
l At least 300 mm under the pRRU3902 is reserved for cabling.
l At least 300 mm on the left of the pRRU3902 is reserved for maintenance.
l At least 300 mm on the right of the pRRU3902 is reserved for maintenance.
l At least 400 mm in front of the pRRU3902 is reserved for maintenance
l At least 40 mm on the back of the pRRU3901 is reserved for ventilation.

8.1.4 Installation Environment Requirements

The installation environment of a pRRU3902 involves the running environment specifications for the pRRU3902 and other specifications.
Running Environment Specifications
Table 8-6 shows the environment specifications for the pRRU3902 installed indoors.
Table 8-6 pRRU3902 environment specifications
Specificat ions
Condition Remarks
Operating temperatur e
Relative humidity
Altitude - 60 m to + 1800 m Works properly.
Issue 06 (2015-10-30) Huawei Proprietary and Confidential
- 5°C to + 40°C -
5% RH to 95% RH -
Copyright © Huawei Technologies Co., Ltd.
94