No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address:Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website:http://www.huawei.com
Email:support@huawei.com
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
This document describes how to install the modules and cables for the BBU, DCU, RHUB,
pRRU3901, pRRU3902, and pRRU3907 indoors. It also provides checklists for hardware
installation.
NOTE
l Unless otherwise specified, BBU in this document refers to BBU3900 and BBU3910.
l DCU3900 in this document refers to DCU.
l RHUB3908 in this document refers to RHUB.
l Unless otherwise specified, pRRU in this document refers to pRRU3901, pRRU3902, and pRRU3907.
Product Version
The following table lists the product version related to this document.
Product Name
DBS3900 LampSite
Intended Audience
This document is intended for:
lBTS installation personnel
Solution VersionProduct Version
l SRAN10.1 and later versions
l RAN17.1 and later versions
l eRAN8.1 and later versions
l eRAN TDD 8.1 and later
versions
V100R010C10 and later
versions
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
2.2 Preparing Tools and Instruments.................................................................................................................................... 5
2.3 Requirements for Installation Personnel.........................................................................................................................6
3 Unpacking and Checking............................................................................................................ 7
4 Installing a BBU.............................................................................................................................9
5 Installing a DCU.......................................................................................................................... 10
6 Installing an RHUB.....................................................................................................................11
6.1 Information About the Installation............................................................................................................................... 12
6.3 Installing an RHUB...................................................................................................................................................... 22
6.3.1 Installing an RHUB in a 19-Inch Cabinet or Rack....................................................................................................22
6.3.2 Installing an RHUB in a 19-Inch Shelf..................................................................................................................... 25
6.3.3 Installing an RHUB on a Wall................................................................................................................................... 28
6.4.1 Requirements for Cable Layout.................................................................................................................................32
6.4.9 Installing Power Cable...............................................................................................................................................45
6.5 Checking the RHUB Hardware Installation................................................................................................................. 46
6.6 Power-on Check on an RHUB......................................................................................................................................48
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
7 Installing a pRRU3901................................................................................................................ 50
7.1 Information About the Installation............................................................................................................................... 51
7.1.3 Space Requirements.................................................................................................................................................. 55
7.2 Obtaining the MAC Address (Optional) ..................................................................................................................... 57
7.4 Installing a pRRU3901................................................................................................................................................. 58
7.4.2 Installing a pRRU3901 on a Wall.............................................................................................................................. 60
7.4.3 Installing a pRRU3901 on a Ceiling..........................................................................................................................63
7.4.4 Installing a pRRU3901 on a Pole.............................................................................................................................. 66
7.4.5 Installing a pRRU3901 on a Plate............................................................................................................................. 68
7.4.6 Installing a pRRU3901 on a Keel..............................................................................................................................71
7.5.1 Requirements for Cable Layout.................................................................................................................................74
7.5.6 Installing an Ethernet Cable...................................................................................................................................... 81
7.5.7 Installing an RF jumpers (Optional)..........................................................................................................................83
7.6 Checking the pRRU3901 Hardware Installation.......................................................................................................... 85
7.7 Powering on the pRRU3901.........................................................................................................................................86
8 Installing a pRRU3902................................................................................................................ 88
8.1 Information About the Installation............................................................................................................................... 89
8.1.3 Space Requirements.................................................................................................................................................. 93
8.3 Installing a pRRU3902................................................................................................................................................. 96
8.3.2 Installing a pRRU3902 on a Wall.............................................................................................................................. 98
8.3.3 Installing a pRRU3902 on a Ceiling........................................................................................................................102
8.3.4 Installing a pRRU3902 on a Plate........................................................................................................................... 105
8.3.5 Installing a pRRU3902 on a Keel............................................................................................................................ 112
8.3.6 Installing a pRRU3902 on Steel Hangers................................................................................................................ 116
8.4.1 Requirements for Cable Layout...............................................................................................................................120
8.4.5 Installing an Ethernet Cable.................................................................................................................................... 125
8.4.6 Installing an RF Jumpers (Optional)....................................................................................................................... 126
8.5 (Optional) Installing a Combiner................................................................................................................................128
8.6 Checking the pRRU3902 Hardware Installation........................................................................................................ 130
8.7 Powering on the pRRU3902.......................................................................................................................................131
9 Installing a pRRU3907.............................................................................................................. 133
9.1 Information About the Installation............................................................................................................................. 134
9.1.2 Constraints and Limitations.....................................................................................................................................134
9.1.3 Installation Clearance and Space Requirements......................................................................................................137
9.3 Installing a pRRU3907............................................................................................................................................... 141
9.3.2 Installing a pRRU on a Wall.................................................................................................................................... 142
9.3.3 Installing a pRRU on a Pole.................................................................................................................................... 146
9.4.5 Installing a PGND Cable......................................................................................................................................... 152
9.4.6 Installing an RF Jumper...........................................................................................................................................153
9.4.7 Opening the Cover Plate of a pRRU Cabling Cavity.............................................................................................. 157
9.4.8 Installing an Ethernet Cable.................................................................................................................................... 158
9.4.9 Closing the Cover Plate of a pRRU Cabling Cavity............................................................................................... 160
9.5 Checking the pRRU3907 Hardware Installation........................................................................................................ 161
9.6 Powering on the pRRU3907.......................................................................................................................................163
10 Installing the Extender (Optional)....................................................................................... 165
11.1 MAC Collection Template........................................................................................................................................169
Before starting the installation, you must obtain the required reference documents, tools, and
instruments, and familiarize yourself with the skills required.
2 Installation Preparations
2 Installation Preparations
2.1 Reference Documents
Before the installation, you must read the following documents:
2.2 Preparing Tools and Instruments
This section describes the tools and instruments that must be prepared before the installation.
2.3 Requirements for Installation Personnel
This section describes requirements for installation engineers. They must be qualified and
trained, and familiar with correct operation methods and safety precautions before performing
any operations.
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
This section describes requirements for installation engineers. They must be qualified and
trained, and familiar with correct operation methods and safety precautions before performing
any operations.
Socket wrench (M6)
Before the installation, pay attention to the following items:
lTechnical engineers must take Huawei training and be familiar with proper installation
and operation methods.
lThe number of installation personnel depends on the engineering schedule and
installation environment. Generally, three to five persons are required. Generally, only
three to five onsite personnel are necessary.
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
Report the problems and causes to the local
Huawei office.
7
DBS3900 LampSite
Installation Guide
Step 3 Check the type and quantity of the equipment in the boxes according to the packing list.
3 Unpacking and Checking
If...Then...
The exterior of each packing box is intactGo to Step 3.
It is damaged or soakedReport the problems and causes to the local
Huawei office.
The collision label is redDo not unpack the packing box and claim for
compensation from the transportation
company.
If...
The type and number are consistent with
the packing list on each packing list
There is any shortage, wrong delivery, or
damaged equipment
Then...
Sign the Packing List with the operator.
Report the problems and causes to the local
Huawei office.
NOTICE
Perform the following operations to protect the components from any damages and help find
out the cause of any damage in future: 1. Store the unpacked equipment and packing materials
indoors. 2. Take photos of the storeroom, rusted or eroded equipment, packing box, and
packing materials. 3. File the photos.
----End
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
This chapter describes the process of installing an RHUB. RHUBs are classified into those
with electrical transmission ports and those with no electrical transmission ports. Unless
otherwise specified, this document uses the RHUBs with no electrical transmission ports as an
example.
6 Installing an RHUB
6 Installing an RHUB
6.1 Information About the Installation
This section describes the information to be learnt before RHUB installation, including the
RHUB installation scenarios, clearance, and installation environment.
6.2 Installation Process
The RHUB installation involves installing an RHUB module, installing RHUB cables,
checking the RHUB hardware installation, and powering on the RHUB.
6.3 Installing an RHUB
An RHUB can be installed in a cabinet, rack, shelf, or on a wall.
6.4 Installing RHUB Cables
This section describes how to install cables for an RHUB.
6.5 Checking the RHUB Hardware Installation
After an RHUB is installed, check the installation of hardware including the devices and
related cables.
6.6 Power-on Check on an RHUB
This section describes the power-on check on the RHUB after the RHUB hardware is
installed and checked.
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
This section describes the information to be learnt before RHUB installation, including the
RHUB installation scenarios, clearance, and installation environment.
6.1.1 Installation Scenarios
An RHUB can be installed in a 19-inch cabinet, rack, shelf, or on a wall.
NOTICE
To prevent the RHUB from water drops, the RHUB panel must not face upwards (shown in
Figure 6-1) in any installation scenarios.
Figure 6-1 Improper installation mode
6 Installing an RHUB
The RHUB mounting ears are installed in standard mode or reverse mode. The reverse mode
is used by default. The two installation modes are defined as follows:
lIn standard mode, the front of the mounting ear is aligned with the RHUB panel, as
shown in Figure 6-2.
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
Figure 6-4 Installing an RHUB in a 19-inch cabinet or rack in standard mode
Figure 6-5 Installing an RHUB in a 19-inch cabinet in reverse mode
Installing an RHUB in a 19-Inch Shelf
When an RHUB is installed in a 19-inch shelf, the shelf must be installed on a wall. One shelf
can house multiple RHUBs with 1 U space between two RHUBs.
Figure 6-6 and Figure 6-7 show RHUBs installed in a 19-inch shelf.
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
When an RHUB is installed in a 19-inch cabinet, rack, shelf, or on a wall, a minimum
clearance is required for easy cabling and operation and maintenance. A recommended
installation clearance is provided based on experience.
NOTICE
l Do not install or place inflammable materials above or under an RHUB.
l A clearance of 350 mm must be reserved in front of the air intake vent of the fan of the
power supply unit (PSU) for maintenance.
Figure 6-9 shows the installation clearance for the RHUB installed in a 19-inch cabinet, rack,
or shelf.
Issue 06 (2015-10-30)Huawei Proprietary and Confidential
Type C upper-level AC circuit breakers or slow-blow fuses must be used for power cables.
The maximum current must not exceed 16 A. Table 6-2 describes the recommended
specifications.
Table 6-2 Circuit breaker specifications for power cables
6 Installing an RHUB
Power Supply
220 V AC single-phase≥ 6 A
110 V AC dual-live-wire
110 V AC single-phase≥ 12 A
6.2 Installation Process
The RHUB installation involves installing an RHUB module, installing RHUB cables,
checking the RHUB hardware installation, and powering on the RHUB.
Figure 6-12 shows the RHUB installation process.
Upper-level AC Circuit
Breaker (For a single
RHUB)
Cross-Sectional Area of
the Input Power Cable
1.5 mm
2
Issue 06 (2015-10-30)Huawei Proprietary and Confidential