Hp PROLIANT BL2X220C G5 BBWC Battery Option Installation Instructions

BBWC Battery Option

Kit contents

Installation Instructions
for the HP ProLiant BL2x220c Generation 5 Server Blade
Battery tray
Cable clips (2)
Cache batteries (2)
Cable shield
This document
In addition to the contents of this kit, the mezzanine card installation documentation is required.

Installing a cache module battery

To install the component:
1. Power down the server blade.
2. Remove the server blade.
3. Remove the server B assembly: a. Place the server blade on a flat, level work surface with the
bezel facing away from you.
b. Extend the server B serial label pull tab.
CAUTION: The jackscrews control the unseating and
seating of critical system connectors. Failure to use the jackscrews to remove and install the server B assembly can cause the system boards to fail.
c. Turn the jackscrew on the right approximately six turns
counterclockwise.
d. Turn the jackscrew on the left counterclockwise until the
threads are fully disengaged.
e. Turn jackscrew on the right counterclockwise until the
threads are fully disengaged.
CAUTION: To prevent damage to the server blade, do not apply pressure to the enclosure connector.
f. Lift server B assembly from server A assembly, and then
place it on the work surface with the system board facing up.
© Copyright 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The
only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein.
Part Number 468229-002 March 2008 (Second Edition)
4. Remove the server A USB key, if installed.
5. Remove the hard drive carrier. Retain the component for future use.
6. Install the lower cache battery in the battery tray.
8. Connect the cables to the battery packs.
9. Install the battery tray.
7. Install the upper cache battery in the battery tray.
10. Do one of the following:
o If a heatsink blank is installed on processor socket 2, then
remove the heatsink blank, route the cables between the processor socket and the chassis, and install the heatsink blank.
CAUTION: Route the cable so that it does not become pinched when the system board is installed.
Loading...
+ 2 hidden pages