HP 2520G-POE User Manual

0 (0)

HP ProCurve 2520G-PoE Switches

Installation and Getting Started Guide

Power over Ethernet

HP ProCurve 2520G-PoE Switches

Installation and Getting Started Guide

© Copyright 2009 Hewlett-Packard Development

Company, L.P.

Publication Number

5992-4975 October 2009

Applicable Products

HP ProCurve 2520G-8-PoE Switch

(J9298A)

HP ProCurve 2520G-24-PoE Switch

(J9299A)

Disclaimer

HEWLETT-PACKARD COMPANY MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Hewlett-Packard shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material.

The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein.

Hewlett-Packard assumes no responsibility for the use or reliability of its software on equipment that is not furnished by Hewlett-Packard.

Warranty

See the Software License, Warranty and Support booklet included with the product.

A copy of the specific warranty terms applicable to your Hewlett-Packard products and replacement parts can be obtained from your HP Sales and Service Office or authorized dealer.

Safety

Before installing and operating these products, please read the “Installation Precautions” in chapter 2, “Installing the Switch”, and the safety statements in appendix B, “Safety and EMC Regulatory Statements”.

Hewlett-Packard Company

8000 Foothills Boulevard, m/s 5551 Roseville, California 95747-5551

www.hp.com/go/procurve

Contents

1 Introducing the Switch

Front of the Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

Network Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

LEDs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4

Port LEDs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6

LED Mode Select Button and Indicator LEDs . . . . . . . . . . . . . . . . 1-7

Reset Button . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8

Clear Button . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8

Console Port . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8

Back of the Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9

Power Connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9

Switch Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10

Save Power Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11

2 Installing the Switch

Included Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

Installation Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. 2-3

Installation Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. 2-4

1.

Prepare the Installation Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-5

2.

Verify the Switch Passes Self Test . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-6

 

LED Behavior . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-8

3.

Mount the Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-8

 

Rack or Cabinet Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-8

 

Rack Mounting the Switch 2520G-24-PoE . . . . . . . . . . . . . . . . . . .

2-9

 

Rack Mounting the Switch 2520G-8-PoE . . . . . . . . . . . . . . . . . . .

2-11

 

Wall or Under-Table Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-13

 

Horizontal Surface Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-14

 

Using a Kensington Security Cable . . . . . . . . . . . . . . . . . . . . . . . .

2-15

4. Connect the Switch to a Power Source . . . . . . . . . . . . . . . . . . . . . .

2-15

5.

Connect the Network Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-17

 

Using the RJ-45 Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-17

iii

6. Installing or Removing mini-GBICs . . . . . . . . . . . . . . . . . . . . . . . . .

2-18

Installing the mini-GBICs: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-18

Removing the mini-GBICs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-19

Connecting Cables to mini-GBICs . . . . . . . . . . . . . . . . . . . . . . . . .

2-19

7. (Optional) Connect a Console to the Switch . . . . . . . . . . . . . . . . . . 2-20 Terminal Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-20 Direct Console Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-21

Sample Network Topologies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-22

As a Desktop Switch Implementing PoE . . . . . . . . . . . . . . . . . . . . . . . 2-22

As a Segment Switch Implementing PoE . . . . . . . . . . . . . . . . . . . . . . . 2-23

Stacking the Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-25

3 Configuring the Switch

Recommended Minimal Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1

Using the Console Setup Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2

Where to Go From Here . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3

Using the IP Address for Remote Switch Management . . . . . . . . . . . . . . . . 3-5

Starting a Telnet Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5

Starting a Web Browser Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5

4 Troubleshooting

Basic Troubleshooting Tips . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-1

Diagnosing with the LEDs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4

LED patterns for General Switch Troubleshooting . . . . . . . . . . . . . . . 4-4

LED Patterns for PoE Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . 4-8

Proactive Networking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9

Hardware Diagnostic Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10

Testing the Switch by Resetting It . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-10

Checking the Switch LEDs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-10

Checking Console Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-10

Testing Twisted-Pair Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-11

Testing Switch-to-Device Network Communications . . . . . . . . . . . . 4-11

Testing End-to-End Network Communications . . . . . . . . . . . . . . . . . 4-11

Restoring the Factory Default Configuration . . . . . . . . . . . . . . . . . . . . . . . 4-12

Downloading New Switch Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13

iv

HP Customer Support Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13

Before Calling Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13

A Specifications

Switch Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-1

Physical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-1

Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-1

Environmental . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-1

BTU Ratings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-2

Acoustics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-2

Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-2

Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-3

Cabling and Technology Information Specifications . . . . . . . . . . . . . . . .

A-4

Technology Distance Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-5

Mode Conditioning Patch Cord . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-6

Installing the Patch Cord . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-6

Twisted-Pair Cable/Connector Pin-Outs . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8

Straight-through Twisted-Pair Cable for

10 Mbps or 100 Mbps Network Connections . . . . . . . . . . . . . . . . . . . A-10 Cable Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 Pin Assignments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10

Crossover Twisted-Pair Cable for

10 Mbps or 100 Mbps Network Connection . . . . . . . . . . . . . . . . . . . . A-11 Cable Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11 Pin Assignments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11

Straight-Through Twisted-Pair Cable for

1000 Mbps Network Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-12 Cable Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-12 Pin Assignments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-12

B Safety and EMC Regulatory Statements

Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B-1

EMC Regulatory Statements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B-8

U.S.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-8

Canada . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B-8

Australia/New Zealand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B-8

v

Japan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-8

Korea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-9

Taiwan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-9

European Community . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-10

D Recycle Statements

Waste Electrical and Electronic Equipment (WEEE) Statements . . . . . . D-1

Index

vi

1

Introducing the Switch

The HP ProCurve 2520G-PoE Switches are multiport switches that can be used to build high-performance switched workgroup networks. These switches are store-and-forward devices that offer low latency for high-speed networking. The 2520G-PoE switches also support Power over Ethernet (PoE) technologies.

HP ProCurve 2520G-8-PoE Switch (J9298A)

HP ProCurve 2520G-24-PoE Switch (J9299A)

Throughout this manual, these switches will be referred to as the Switch 2520G-8-PoE and the Switch 2520G-24-PoE.

The Switch 2520G-8-PoE has 8 auto-sensing 10/100/1000Base-T RJ-45 ports with two Gigabit Uplink dual-personality ports (ports 9 and 10).

The Switch 2520G-24-PoE has 24 auto-sensing 10/100/1000Base-T RJ-45 ports, four of which are dual-personality ports (ports 21 through 24).

Power-over-Ethernet or PoE power - Both 2520G-PoE switches support PoE technology, which allows IP telephones, wireless LAN Access Points and other appliances to receive power as well as data over existing LAN cabling, without needing to modify the existing Ethernet infrastructure. The Switch 2520G-24-PoE is designed with an internal PoE power supply capable of providing 195 watts of PoE power (67 watts on the Switch 2520G-8-PoE). Each Switch port can provide up to 15.4 watts (or 7.5 watts if all ports are used) of PoE power to connected devices. For further information regarding PoE power, see the PoE Planning and Implementation Guide, which is on the ProCurve Web site at www.hp.com/go/procurve/manuals.

1-1

Introducing the Switch

Dual-personality ports use either the 10/100/1000Base-T RJ-45 connector, or a supported ProCurve mini-GBIC (Small Form Factor Pluggable (SFP)) for fiber-optic connection. By default, the RJ-45 connectors are enabled.

These switches can be directly connected to computers, printers, and servers to provide dedicated bandwidth to those devices, and you can build a switched network infrastructure by connecting the switch to hubs, other switches, or routers. In addition, the 2520G-PoE switches offer full network management capabilities.

Using ProCurve mini-GBICs, these products support optional network connectivity with the following speeds and technologies:

Table 1-1. Optional Network Connectivity, Speeds and Technologies

 

 

 

Transceiver Form-

 

 

 

Factor and

 

 

 

Connector

 

 

 

 

Speed

Technology

Cabling1

SFP ("mini-GBIC")

 

 

 

Connector

 

 

 

 

100 Mbps

100-FX

Fiber (multimode)

LC

 

 

 

100-BX

Fiber (single mode)

LC

 

 

 

 

 

 

1000-SX

Fiber (multimode)

LC

 

 

 

 

1 Gbps

1000-LX

Fiber (multimode or single mode)

LC

 

 

 

1000-LH

Fiber (single mode)

LC

 

 

 

 

 

 

1000-BX

Fiber (single mode)

LC

 

 

 

 

1 For supported transceivers, see www.hp.com/go/procurve/faqs. HP ProCurve MiniGBICs and SFPs have links to a list of supported products (first question in the "General product information" category).

For technical details of cabling and technologies see “Cabling and Technology Information Specifications” in the appendix A.

1-2

HP 2520G-POE User Manual

Introducing the Switch

Front of the Switch

Front of the Switch

Power,

 

Test and Status

 

 

 

 

Switch port LEDs

Fault, and

 

LEDs

 

 

 

 

 

Locator

 

 

 

 

 

 

 

 

LEDs

 

 

 

 

 

 

 

 

 

HP ProCurve 2520G-8-PoE Switch (J9298A)

 

Console

 

Reset and Clear

 

LED Mode select button

 

10/100/1000Base-T RJ-45 ports

 

Dual-personality ports

 

 

Port

 

buttons

 

and indicator LEDs

 

 

 

(1000Base-T2 and mini-GBIC)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Power, Fault,

 

 

 

 

HP ProCurve 2520G-24-PoE Switch (J9299A)

PoE, Fan and Test

 

Switch port LEDs

and Locator

 

 

 

LEDs

 

Status LEDs

 

 

 

 

 

 

 

 

 

 

 

Reset and Clear

 

LED Mode select button

 

 

Dual-personality ports

Console

 

 

 

10/100/1000Base-T RJ-45 ports1

 

buttons

 

and indicator LEDs

 

 

(1000Base-T2 and Mini-GBIC)

Port

 

 

 

 

 

 

 

 

 

 

 

 

1All 10/100/1000Base-T RJ-45 ports have the Auto-MDIX feature.

2Dual-personality ports, either RJ-45 10/100/1000Base-T ports or Mini-GBIC (SFP) slots.

Network Ports

8, or 24 auto-sensing 10/100/1000Base-T ports.

All these ports have the “Auto-MDIX” feature, which means that you can use either straight-through or crossover twisted-pair cables to connect any network devices to the switch.

Two, or four dual-personality ports for either 10/100/1000Base-T RJ-45 uplinks, or mini-GBIC (SFP) slots for fiber uplinks.

1-3

Introducing the Switch

Front of the Switch

LEDs

On the 2520G-PoE switches, there are three groupings of LEDs:

switch status LEDs (Table 1-2)

port LEDs (Table 1-3)

Port LED Mode indicator LEDs (near the selector button) (Table 1-4)

Table 1-2. Switch Status LEDs

Switch LEDs

State

Meaning

 

 

 

Power

On

The internal power supply is working properly.

(green)

Off

No power connection. The switch is NOT receiving power.

 

 

 

 

Fault

Off

The normal state; indicates there are no fault conditions on the switch.

(orange)

Flashing2

A fault has occurred with a component on the switch. The Status LED for

 

 

 

the component with the fault will flash simultaneously.

 

On

On briefly after the switch is powered on or reset, at the beginning of

 

 

switch self test. If this LED is on for a prolonged time, the switch has

 

 

encountered a fatal hardware failure, or has failed its self test. See

 

 

chapter 4, “Troubleshooting” for more information.

 

 

 

Locator

On

The Locator LED is used to locate a specific switch in an area full of

(blue)

Flashing

switches. The LED can be set to be on solid or flash for a specified number

 

Off

of minutes (1-1440). The default is 30 minutes. Use the command

 

 

“chassislocate”.

 

 

 

PoE

On green

Normal operation. The switch is ready to supply PoE power

(green/orange)

Flashing

One or more ports has experienced a fault condition for PoE delivery. The

 

 

orange2

Fault LED will be flashing simultaneously. If it is a self test failure, the Test

 

 

LED will be flashing simultaneously. When the switch is put in PoE LED

 

 

Mode, the Mode LED for the port with the problem will also be flashing

 

 

simultaneously.

 

Flashing

One or more ports has an alert condition for PoE delivery, for example, an

 

orange1

oversubscription condition (not enough PoE power available). Only this

 

 

LED will be flashing, the Fault LED is off. When the switch is put in PoE

 

 

LED Mode, the Mode LEDs for the ports with the alert condition will also

 

 

be flashing.

 

 

 

Fan

On green

The cooling fan is operating normally.

(green/orange)

Flashing

The cooling fan has failed. The switch Fault LED will be flashing

(Switch 2520G-

24-PoE only)

orange2

simultaneously.

1-4

 

 

Introducing the Switch

 

 

Front of the Switch

 

 

 

 

Switch LEDs

State

Meaning

 

 

 

 

 

Test

Off

The normal operational state; the switch is not undergoing self test.

 

(green/orange)

On green

The switch self test and initialization are in progress after the switch has

 

 

 

 

 

been power cycled or reset. The switch is not operational until this LED

 

 

 

goes off. The Test LED also comes on briefly when you “hot swap” a mini-

 

 

 

GBIC into the switch; the mini-GBIC is tested when it is hot swapped.

 

 

Flashing

A component of the switch has failed its self test. The switch Fault LED,

 

 

orange2

Test LED, and the failed component LED will flash simultaneously.

 

1 The flashing behavior is an on/off cycle once every 0.8 seconds approximately, a fast flash.

 

2 The flashing behavior is an on/off cycle once every 1.6 seconds approximately, a slow flash.

 

1-5

Introducing the Switch

Front of the Switch

Port LEDs

The port LEDs provide information about the individual switch ports.

Table 1-3. Port LEDs

Switch LEDs

State

Meaning

 

 

 

 

Port LEDs

 

 

 

 

 

 

 

Link2

On

 

The port is enabled and receiving a link indication from the connected

(green)

 

 

device. In PoE mode, indicates that the port is configured to enable PoE

 

 

 

power delivery to the connected device.

 

 

 

 

 

Off

 

One of these condition exists:

 

 

 

• no active network cable is connected to the port

 

 

 

• the port is not receiving link beat or sufficient light

 

 

 

• the port has been disabled through the switch console, the Web

 

 

 

browser interface, ProCurve Manager, or other network management

 

 

 

tool.

 

 

 

• In PoE mode, indicates that the port is configured such that PoE power

 

 

 

delivery is disabled.

 

 

 

• Save power mode is enabled.

 

 

 

 

Flashing1

The port has failed self test. The switch Fault, and Self Test LEDs will flash

 

 

 

simultaneously.

 

 

 

Mode (green)2

Depending on the mode selected, displays the following:

 

network activity information

 

connection duplex mode

 

connection speed information

 

• PoE power delivery status

 

See “LED Mode Select Button and Indicator LEDs:” below for more information.

 

 

 

 

Mini-GBIC LEDs

 

 

 

 

 

 

Link2

Flashing

One of the following conditions exist:

 

green

• the mini-GBIC is not supported by the current software

 

 

 

• the mini-GBIC is not a genuine ProCurve Mini-GBIC and is not

 

 

 

supported

 

 

 

• the mini-GBIC is an “A” version in a switch that requires a “B” version

 

 

 

or later.

 

 

 

Link and Mode2

On for 2

Both the Link and Mode LED turn on solid for 2 seconds and then go to

(green)

seconds

normal operation. This indicates the mini-GBIC has been recognized by

 

 

 

the switch.

 

 

 

 

1 The flashing behavior is an on/off cycle once every 1.6 seconds, approximately.

2 These LEDs are turned off when Save Power mode is enabled. If Save Power mode is enabled and the LEDs are turned off, they can be turned on temporarily through the LED Mode button.

1-6

Introducing the Switch

Front of the Switch

LED Mode Select Button and Indicator LEDs

To optimize the amount of information that can be displayed for each of the switch ports in the limited space available, the 2520G-PoE switches use multiple-display LEDs for each port.

The 2520G-PoE switches, have two LEDs per port. The Link status is always shown by the Link LED. The operation of the Mode LED is controlled by the LED Mode select button, and the current setting is indicated by the LED Mode indicator LEDs near the button. Press the button to step from one view mode to the next. The default view is Activity (Act).

Link LED

 

Mode LED

 

 

 

LED Mode select button and indicator LEDs

Table 1-4.

Multiple-Display Port LEDs

 

 

 

 

Switch LEDs

Mode

 

Meaning

 

 

 

 

Port Mode

Act

 

Indicates the Port LEDs are displaying network activity information.

indicator LEDs

 

 

 

FDx

 

Indicates the Port LEDs are lit for ports that are in full-duplex mode.

(4 green LEDs)

 

 

 

 

 

Spd

 

Indicates the Port LEDs are displaying the connection speed at which each

 

 

 

port is operating:

 

 

 

• if the Port LED is off, the port is operating at 10 Mbps.

 

 

 

• if the Port LED is flashing, the port is operating at 100 Mbps.

 

 

 

• if the Port LED is on continuously, the port is operating at 1000 Mbps.

 

 

 

 

 

PoE

 

Indicates the Port LEDs are lit for ports that are providing PoE power to the

 

 

 

connected device.

 

 

 

 

When Save Power mode is enabled and all port LEDs are off, press the LED Mode select button to turn the port LEDs on. Press the LED Mode select button again to step through each view mode. Press the LED Mode select button after the PoE view mode to turn LEDs off.

If the port LEDs are left on when Save Power mode is enabled, they turn off automatically after 10 minutes.

1-7

Introducing the Switch

Front of the Switch

Reset Button

This button is for:

Resetting the switch - When the switch is powered on. This action clears any temporary error conditions that may have occurred and executes the switch self test.

Restoring Factory Default Configuration - When pressed with the Clear button in a specific pattern, any configuration changes you may have made through the switch console, the Web browser interface, and SNMP management are removed, and the factory default configuration is restored to the switch. For the specific method to restore the factory default configuration, see “Restoring the Factory Default Configuration” on page 4-12 of this manual.

Clear Button

This button is used for:

Deleting Passwords - When pressed by itself for at least one second, the button deletes any switch console access passwords that you may have configured. Use this feature if you have misplaced the password and need console access. This button is provided as a convenience, however if you are concerned with the security of the switch configuration and operation, you should make sure the switch is installed in a secure location. This button can be disabled by a CLI command.

Restoring Factory Default Configuration - See Reset Button above.

Console Port

This port is used to connect a console to a 2520G-PoE Switch by using the RJ-45 to DB9 cable, supplied with the switch. This connection is described under “7. (Optional) Connect a Console to the Switch” on page 2-20 in chapter 2, “Installing the Switch.” The console can be a PC or workstation running a VT-100 terminal emulator, or a VT-100 terminal.

1-8

Introducing the Switch

Back of the Switch

Back of the Switch

HP ProCurve 2520G-8-PoE Switch (J9298A)

DC power connector

HP ProCurve 2520G-24-PoE Switch (J9299A)

AC power connector

Power Connector

The Switch 2520G-24-PoE does not have a power switch; it is powered on when connected to an active AC power source. The switch automatically adjusts to any voltage between 100-127 and 200-240 volts and either 50 or 60 Hz. There are no voltage range settings required.

The Switch 2520G-8-PoE also does not have a power switch. It is powered on when the external AC/DC power adapter is connected to the switch and to a power source. The external AC/DC power adapter supplies 48 volts DC to the switch and automatically adjusts to any AC voltage between 100-240 volts and either 50 or 60 Hz. No voltage range settings are required.

1-9

Introducing the Switch

Switch Features

Switch Features

The features of the 2520G-PoE switches include:

8, or 24 auto-sensing 10/100/1000Base-T RJ-45 ports with Auto-MDIX.

Two, or four dual-personality uplink ports (1000Base-T RJ-45 or miniGBIC).

Power over Ethernet (PoE) operation—the switches are IEEE 802.3af compliant and provide up to 15.4W per port to power IP phones, wireless access points, Web cameras, and more. For more information, see the PoE Planning and Implementation Guide, which is on the ProCurve Web site at www.hp.com/go/procurve/manuals.

The switches support some pre-standard PoE devices. However, the use of a cross-over cable may be required.

Plug-and-play networking—all ports are enabled—just connect the network cables to active network devices and your switched network is operational.

Auto-MDIX on all twisted-pair ports, meaning that all twisted-pair connections can be made using straight-through cables. Cross-over cables are not required, although they will also work.

Automatic learning of the hardware addresses in each switch’s 8000address forwarding table, (with configurable address aging value).

Automatically negotiated full-duplex operation for the 10/100/1000 RJ-45 ports when connected to other auto-negotiating devices.

a “Save Power” mode option that keeps port LEDs turned off except for when the LED Mode select button is pressed.

an automatic low-power mode for ports when a link is not present.

Easy management of the switches through several available interfaces:

console interface—a full featured, easy to use, VT-100 terminal interface that is especially good for out-of-band switch management or for Telnet access to the switch.

Web browser interface—an easy to use built-in graphical interface that can be accessed from common Web browsers.

ProCurve Manager—an SNMP-based, graphical network management tool that you can use to manage your entire network.

Support for the Spanning Tree Protocol to eliminate network loops

Support for up to 256 IEEE 802.1Q-compliant VLANs so you can divide the attached end nodes into logical groupings that fit your business needs.

Download of new switch software for product enhancements or bug fixes.

1-10

Introducing the Switch

Switch Features

Variable speed fans ensure quiet operation on the Switch 2520G-24-PoE.

Support for many advanced features to enhance network performance— for a description, see the Management and Configuration Guide, which is on the ProCurve Web site at www.hp.com/go/procurve/manuals. (You may want to bookmark this Web page for easy access in the future.)

Save Power Mode

A Save Power mode feature can be configured through the console. Save Power mode can be used to turn off port LEDs unless the LED Mode button is pressed. In addition, it can configure the LAN ports to operate at low power if a link is not detected.

1-11

2

Installing the Switch

This chapter provides installation information for the 2520G-PoE switches.

Included Parts

The 2520G-PoE switches have the following components:

Documentation kit

Read Me First

Switch Quick Setup Guide

Safety and Regulatory information

Software License, Warranty, and Support information

Console port serial cable (DB-9 to RJ-45)

Accessory kits:

Switch 2520G-24-PoE

Switch 2520G-8-PoE

Kit number 5069-6535

Contains:

two mounting brackets

eight 8-mm M4 screws to attach the mounting brackets to the switch

four 5/8-inch number 12-24 screws to attach the switch to a rack

four rubber feet

Kit number 5070-6881

Contains:

two mounting brackets 1

four 8-mm M4 screws to attach the mounting brackets to the switch

four rubber feet

cable tie for power cord

1For wall mounting the Switch 2520G-8-PoE. For rack mounting, an optional bracket kit, 5070-6570, is available. Visit www.hp.com/go/procurve-parts.

2-1

Installing the Switch

Included Parts

Switch 2520G-24-PoE AC power cords, one of the following:

Australia/New Zealand

8121-0833

China

8120-8377

Continental Europe

8120-6802

Denmark

8120-6806

India

8121-0772

Israel

8120-6799

Japan

8120-6804

South Africa

8120-6808

Switzerland

8120-6807

Thailand

8121-0667

Taiwan

8121-0964

United Kingdom/Hong Kong/Singapore

8120-8709

United States/Canada/Mexico

8120-6805

Switch 2520G-8-PoE external AC/DC power adapters and power cords, one of the following:

External AC/DC Power Adapter

 

All countries/regions

5070-6082

Power Cords for AC/DC Power Adapter

 

Australia

8121-0838

China

8121-0910

Continental Europe

8120-8861

Denmark

8120-8930

India

8121-0564

Israel

8121-1035

Japan

8121-0875

South Africa

8120-8929

Switzerland

8121-0908

Thailand

8121-0673

United Kingdom/Hong Kong/Singapore

8121-0909

United States/Canada/Mexico

8121-0921

J a p a n P o w e r

C o r d W a r n i n g

2-2

W A R N I N G

C a u t i o n s

Installing the Switch

Included Parts

Installation Precautions

The rack or cabinet should be adequately secured to prevent it from becoming unstable and/or falling over.

Devices installed in a rack or cabinet should be mounted as low as possible, with the heaviest devices at the bottom and progressively lighter devices installed above.

Wall-mount the Switch 2520G-8-PoE with network ports facing up (away from the floor). Do not wall-mount the switch with the network ports facing down (toward the floor) or ventilation ducts facing up or down.

Use only the AC/DC power adapter supplied with the Switch 2520G-8-PoE for connection to an AC power source.

Ensure the power source circuits are properly grounded, then use the power cord supplied with the switch to connect it to the power source.

If your installation requires a different power cord than the one supplied with the switch, ensure the cord is adequately sized for the switch’s current requirements. In addition, be sure to use a power cord displaying the mark of the safety agency that defines the regulations for power cords in your country. The mark is your assurance that the power cord can be used safely with the switch. If the supplied power cord does not fit, contact ProCurve Networking support.

When installing the switch, the AC outlet should be near the switch and should be easily accessible in case the switch must be powered off.

Ensure the switch does not overload the power circuits, wiring, and overcurrent protection. To determine the possibility of overloading the supply circuits, add together the ampere ratings of all devices installed on the same circuit as the switch and compare the total with the rating limit for the circuit. Maximum ampere ratings are usually printed on the devices near the AC power connectors.

Do not install the switch in an environment where the operating ambient temperature might exceed 50°C (122°F). This includes a fully-enclosed

rack. Ensure the air flow around the sides and back of the switch is not restricted. Leave at least 7.6 cm (3 inches) for cooling.

Ensure all port covers are installed when the port is not in use.

2-3

Installing the Switch

Installation Procedures

Installation Procedures

These steps summarize your switch installation. The rest of this chapter provides details on these steps.

1.Prepare the installation site (page 2-5). Make sure the physical environment into which you will be installing the switch is properly prepared, including having the correct network cabling ready to connect to the switch and having an appropriate location for the switch. See page 2-3 for some installation precautions.

2.Verify the switch passes self test (page 2-6). Plug the switch into a power source and observe that the LEDs on the switch’s front panel indicate correct switch operation.

3.Mount the switch (page 2-8). The 2520G-PoE switches can be mounted in a 19-inch telco rack, in an equipment cabinet, on a wall, or on a horizontal surface.

4.Connect power to the switch (page 2-15). Once the switch is mounted, plug it into the main power source.

5.Connect the network devices (page 2-17). Using the appropriate network cables, connect the network devices to the switch ports.

6.(Optional) Install mini-GBICs (page 2-18). The switch has two or four slots for installing mini-GBICs. Depending on where you install the switch, it may be easier to install the mini-GBICs first. Mini-GBICs can be hot swapped—they can be installed or removed while the switch is powered on.

7.(Optional) Connect a console to the switch (page 2-20). You may wish to modify the switch’s configuration, for example, to configure an IP address so it can be managed using a Web browser, from an SNMP network management station, or through a Telnet session. Configuration changes can be made by using the included console cable to connect a PC to the switch’s console port.

At this point, your switch is fully installed. See the rest of this chapter if you need more detailed information on any of these installation steps.

2-4

Installing the Switch

Installation Procedures

1. Prepare the Installation Site

Cabling Infrastructure - Ensure the cabling infrastructure meets the necessary network specifications. See appendix A, “Cabling and Technology Information Specifications” for more information:

Installation Location - Before installing the switch, plan its location and orientation relative to other devices and equipment:

In the front of the switch, leave at least 7.6 cm (3 inches) of space for the twisted-pair and fiber-optic cabling.

In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space for the power cord.

On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.

2-5

Installing the Switch

Installation Procedures

2. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first verify it is working properly by plugging it into a power source and verifying it passes its self test.

1.For the Switch 2520G-24-PoE, connect the power cord supplied with the switch to the power connector on the back of the switch, and then into a properly grounded electrical outlet.

For the Switch 2520G-8-PoE, connect the AC/DC adapter’s power cord to the power connector on the back of the switch, and then plug the AC/DC power adapter into a nearby properly grounded electrical outlet.

Switch 2520G-24-PoE

Connect power cord to the power connector

Switch 2520G-8-PoE

 

 

Connect AC/DC power adapter to the

 

 

 

switch and an AC power outlet

 

 

 

 

 

 

Figure 2-1. Connecting the power cord

 

 

 

 

N o t e

The Switch 2520G-24-PoE does not have a power switch. It is powered on

 

when the power cord is connected to the switch and to a power source. For

 

safety, the power outlet should be located near the switch installation.

2-6

C a u t i o n

Installing the Switch

Installation Procedures

The switch automatically adjusts to any voltage between 100-127 or 200-240 volts and either 50 or 60 Hz. There are no voltage range settings required.

The Switch 2520G-8-PoE also does not have a power switch. It is powered on when the external AC/DC power adapter is connected to the switch and the adapter power cord to a power source. The external AC/DC power adapter automatically adjusts to any voltage between 100-240 volts and either 50 or 60 Hz.

If your installation requires a different power cord than the one supplied with the switch, be sure the cord is adequately sized for the switch’s current requirements. In addition, be sure to use a power cord displaying the mark of the safety agency that defines the regulations for power cords in your country. The mark is your assurance that the power cord can be used safely with the switch. If the supplied power cord does not fit, contact ProCurve Networking support.

Use only the AC/DC power adapter and power cord (if applicable), supplied with the Switch 2520G-8-PoE. Use of other adapters or power cords, including those that came with other ProCurve Networking products, may result in damage to the equipment.

2.Check the LEDs on the switch as described below.

Power, Fault, and

 

 

Switch port LEDs

Locator LEDs

 

 

 

 

Self Test LED

Figure 2-2. Checking the LEDs

When the switch is powered on, it performs its diagnostic self test. Self test takes approximately 50 seconds to complete.

2-7

Installing the Switch

Installation Procedures

LED Behavior

During the self test:

Initially, all the switch and port LEDs are on. Most of the LEDs go off and then may come on again during phases of the self test.

For the duration of the self test, the Test LED stays on.

When the self test completes successfully:

The Power, PoE and Fan (Switch 2520G-24-PoE only) LEDs remain on.

The Fault, Locator and Test LEDs stay off.

The Act LED remains on indicating the default port LED mode.

The port LEDs on the front of the switch go into their normal operational mode:

If the ports are connected to active network devices, the Link LEDs stay on and the Mode LEDs behave according to the mode selected. In the default mode (Act), the Mode LEDs should be blinking indicating port activity.

If the ports are not connected to active network devices, the Link and Mode LEDs will stay off.

If the LED display is different than what is described above, especially if the Fault and Test LEDs stay on for more than 60 seconds or they start flashing, the self test has not completed correctly. Refer to chapter 4, “Troubleshooting” for diagnostic help.

3. Mount the Switch

After the switch passes self test, it is ready to be mounted in a stable location. The switch can be mounted in these ways:

in a rack or cabinet

on a horizontal surface

on a wall

Rack or Cabinet Mounting

The Switch 2520G-24-PoE is designed to be mounted in any EIA-standard 19inch telco rack or communication equipment cabinet. The Switch 2520G-8- PoE can also be rack mounted using the optional bracket kit, 5070-6570 (not included).

Note that the mounting brackets have multiple mounting holes and can be rotated allowing for a wide variety of mounting options. Secure the rack in accordance with the manufacture’s safety guidelines.

2-8

W A R N I N G

E q u i p m e n t C a b i n e t

N o t e

W A R N I N G

N o t e

Installing the Switch

Installation Procedures

For safe operation, please read the mounting precautions on page 2-3, before mounting a switch.

The 12-24 screws supplied with the switch are the correct threading for standard EIA/TIA open 19-inch racks. If installing the switch in an equipment cabinet such as a server cabinet, use the clips and screws that came with the cabinet in place of the 12-24 screws that are supplied with the switch.

Rack Mounting the Switch 2520G-24-PoE

1.Use a #1 Phillips (cross-head) screwdriver and attach the mounting brackets to the switch with the included 8-mm M4 screws.

Figure 2-3. Attaching mounting brackets

For safe reliable installation, only use the screws provided in the accessory kit to attach the mounting brackets to the switch.

The mounting brackets have multiple mounting holes and can be rotated allowing for a wide variety of mounting options. These include mounting the switch so that its front face is flush with the face of the rack, or mounting it in a more balanced position.

2-9

Installing the Switch

Installation Procedures

2.Hold the switch with attached brackets up to the rack and move it vertically until rack holes line up with the bracket holes, then insert and tighten the four number 12-24 screws holding the brackets to the rack.

Install 12-24

screws

Figure 2-4. Mounting in a rack

2-10

Loading...
+ 71 hidden pages