Hotpoint-Ariston HBRZA50 User Manual

FREEZER - MODELS RZA50
INSTRUCTIONS FOR INSTALLATION & USE
GETTING STARTED:
STEP 1
Choose a location for your
freezer,away from any
heat sources and
allow adequate
(4 inches) gap above.
STEP 3
Level the freezer by adjusting the front feet. This will stop rocking or
vibration and keep the
NB.The spanner is for illustration
only and is not supplied with the
STEP 5
Before plugging in and switching on, leave the
door aligned.
freezer.
freezer in its final
location for at least 15
minutes to allow it to
settle.
To ensure that your freezer runs reliably and efficiently follow these steps.
STEP 2
Move the freezer into position, using the sides of the cabinet. Take care to avoid damaging the refrigerant circuit pipe work on the rear.
STEP 4
After the front feet have been adjusted and the freezer is level, fit the left and right hand bottom hinge covers supplied. Align with the cover plate slots and push into position.
STEP 6
Plug in and switch on. Allow the freezer to cool before placing food inside.
All food in the freezer should be covered.
INSTALLATION
SAFETY &
CONTROLS USEFUL ADVICE
MAINTENANCE
CLEANING &
TROUBLESHOOTING
STEP 7
If you are freezing fresh
food,turn ON fast freeze
by pressing the switch 24
hours before placing the
food inside.Place the
fresh food inside.
Remember to turn fast freeze OFF
after 24 hours.
STEP 8
Your freezer is now working. If after 24 hours your freezer is not operating as you want, refer to the TROUBLESHOOTING section.
Read the rest of these instructions to get the best from your appliance
and remember to fill in your guarantee registration.
Keep this Book in a safe place for quick reference.
GUARANTEE
SERVICE &
For Your Safety
For your safety, read the following advice:
The freezer cooling system contains a small amount of gas which is environmentally friendly but flammable. To avoid any risk :-
Install the freezer following the installation instructions and ensure that
ventilation openings are kept clear of obstruction.
Take care when installing or moving the freezer to avoid damaging the pipes
on the rear.
If you suspect a leak, do not switch on the freezer,but open the windows and
doors to ventilate the room.
Do not use any electrical devices inside the freezer, for instance for
SAFETY &
INSTALLATION
Do not use any mechanical devices for defrosting other than any which may
Only use this freezer for storing domestic foodstuffs.
When installing your freezer :-
Ensure that the mains cable is not trapped underneath or behind the freezer
Do not stack any other appliance on top of this freezer as they may
defrosting.
have been supplied with the freezer as they may cause damage.
when you install or move it.
damage the freezer or become unstable.
When using your freezer :-
Do not sit or stand on top of your freezer.
Do not store poisonous, flammable or dangerous substances in your freezer.
Do not use aerosol sprays for defrosting or cleaning your freezer.
If you sell the freezer, pass on this booklet to the new owner.
2
Installation
Location & Air Circulation
100mm (4 inches)
Locate your freezer away from sources of heat e.g. cookers, radiators, direct sunlight as extreme temperature will affect its performance.
Allow a minimum 100mm (4 inches) between the top of the freezer and the ceiling or the underside of a wall cupboard.
Providing you follow the recommended ventilation requirements you will :-
Prolong the life of the freezer.
Minimise the risk of condensation on the outside of
the freezer.
Minimise the running costs.
Minimise operating sounds caused by vibration.
Minimum space required to open door
The freezer needs a space of 600mm (24 inches) in front to allow the door to open. When positioning the freezer next to a unit, a gap of 30mm (11/4inch) can be left at the hinge side of the door to allow the easy removal of furniture.If preferred the freezer can be positioned so that a gap is not left.This will restrict how far the door can be opened but the furniture can still be removed (see diagrams below). The door hinge side can be changed to make it easier to open (see ‘Door Reversal’ in the CLEANING & MAINTENANCE section).
INSTALLATION
SAFETY &
600mm
TOP VIEW
30mm or more
TOP VIEW
600mm
less than 30mm
3
Installation
Levelling:
Level the freezer when it is in its final location by adjusting the front feet, until firm contact is made with the floor. This will stop rocking or vibration and keep the door aligned which helps the freezer run reliably and efficiently.
Note: Before plugging in and switching on,leave the freezer standing in its
final location for at least 15 minutes to allow it to settle.
Hinge Covers:
After the front feet have been adjusted and the freezer is level, fit the left and right
SAFETY &
hand bottom hinge covers supplied.
INSTALLATION
To fit: Align the bottom hinge cover onto the
cover plate slots.
Push until the bottom hinge cover clicks into place.
Joining:
Equal height Hotpoint ‘FUTURE’ fridges and freezers can be joined together to look like one unit by using a Filler Kit available from Hotpoint Genuine Parts & Accessories Mail Order Hotline (see KEY CONTACTS,back page).
Defrost Tube:
A tube is supplied to help feed defrost water into a collecting vessel,ie. a bowl (see ‘Defrosting’in the CLEANING & MAINTENANCE section). For safe keeping until required, the tube can be stored in the floor of the freezer compartment.
Defrost tube in storage position
Floor of the freezer compartment
4
Installation
Electrical Supply
WARNING:This appliance must be earthed.
The freezer must be positioned so that the plug is accessible after installation.
Fuses
Your appliance comes fitted with a plug and a 13A fuse. If you need to replace the fuse, only use those rated at 13A and ASTA approved to BS1362.
Changing the Plug
Cut off and dispose of the supplied plug if it does not fit your socket.
WARNING:To avoid a shock hazard do not insert the discarded plug into a socket anywhere else.
IMPORTANT WIRES IN THE MAINS LEAD ARE COLOURED IN ACCORDANCE WITH THE FOLLOWING CODE :
Green/Yellow - Earth
INSTALLATION
SAFETY &
Blue - Neutral Brown - Live
If you change the plug, the colour of wires in the mains lead may not correspond with the colour of the markings identifying terminals in the plug. You should therefore wire it as shown above.
Changing the Mains Lead
This freezer is fitted with a special mains lead. If you need to replace the mains lead due to damage or require a longer lead,one can be bought from Hotpoint Service (see KEY CONTACTS,back page). It is strongly advised that this work is carried out by a qualified electrician.
CE Marking certifies that this appliance conforms to the following EEC directives : Low Voltage Equipment - 72/23/EEC & 93/68 EEC Electromagnetic Compatibility 89/336/EEC, 92/31/EEC & 93/68/EEC
5
Controls
Controlling the Temperature of the Freezer Compartment
The control wheel on the front of the worktop adjusts the internal freezer temperature. Your food should be maintained at -18˚C or colder for long term storage. The setting of the control wheel will depend on the location of the freezer, the room temperature and how often the door is opened. The normal set point (marked by a 3 and N on the dial) is usually suitable. If you need to adjust the temperature turn the control wheel:
Clockwise (higher number) - Colder Anti-clockwise (lower number) - Warmer
CONTROLS
You can check the temperature of the freezer compartment by using a Fridge Freezer Thermometer available from Hotpoint Genuine Parts and Accessories Mail Order Hotline (see KEY CONTACTS back page).
WARNING: Do not use a mercury filled thermometer,as breakage would cause a health hazard.
Your freezer must NOT be placed in a room where the temperature goes below 2˚C or above 38˚C for prolonged periods,as the internal freezer temperature will not be maintained.
6
Loading...
+ 14 hidden pages