Checkout procedure
To ensure the valve is plumbed and wired correctly, carry
out the following checks after filling the system and
switching on the power.
1 a Check manual lever is in ‘AUTO’ position.
b Check programmer has power.
c Check boiler is switched on and its thermostat set to
maximum.
2 Confirm correct hot water functions as follows:
a Turn room thermostat to minimum setting or switch off
at programmer.
b Set cylinder thermostat to maximum and programmer to
‘HOT WATER ON’.
c Pump should run (S Plan ONLY) and boiler should fire
(S and C Plan). Feel pipe approximately 12" from valve
port it should get hot.
3 Confirm correct heating functions as follows:
a Turn cylinder thermostat to minimum or switch off
at programmer.
b Set room thermostat to maximum and programmer to
‘CENTRAL HEATING ON’.
c Boiler should fire and pump should run. Feel pipe
approximately 12" from pump (C Plan), or valve (S
Plan) it should get hot.
Completion
Reset both thermostats to temperature required, normally
60°C for cylinder thermostat and 20°C for room thermostat.
Return programmer to ‘Auto’ or mode selected by
householder. Full installation wiring and operating
instructions for SUNDIAL products are included in every
product pack. For special wiring diagrams or applications,
contact Honeywell. ENSURE THAT VALVE HEADS HAVE
FREE AIR MOVEMENTAROUND THEM.
NOTE:
1. If using the V4043H1080 (1" BSP) or V4043H1106 (28mm), the white wire must be electrically isolated. (‘S’Plan only.)
The wiring diagram above shows relevant connections to a Honeywell junction box (Part No. 42002116-001).
Ensure that each numbered, lettered or coloured wire is connected to the correct terminal in the junction box.
Make sure all connections are good and all terminal screws are firmly tightened.
Notes:
a Wiring diagram shows connections to a programmer with separate control of heating and hot water.
b If single channel time clock is used, connect switched live from time clock to terminal 4 or 6 at junction box,
then link terminal 4 to terminal 6 with a link wire.
Wiring
Whilst Honeywell takes all practicable steps to design and manufacture its products to comply with the requirements of the Health and Safety at Work Act 1974, all products
must be properly used and Purchasers are reminded that their obligations under the Act are to ensure that the installation and operation of such products at a place of work
should be safe and without risk to them.
Honeywell reserve the right at any time and without notice to change any product or information contained in this publication.
The wiring diagrams and installation instructions in this publication are provided for guidance purposes when installing recognised standard systems only. Any application of
this product not shown here, or any deviation from these instructions, is neither recommended nor advised. Any such application or deviation should be referred to
Honeywell for technical assistance.
Form No. 95C-10819-1
Rev. 5/97 KT
Printed In Canada