Holman EZ10 Service Manual

OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
OVEREASY MODEL EZ10
FOR SERVICE INFORMATION
U.S. AND CANADA CALL: TOLL FREE 1-800-225-3958
24 HOURS/DAY 7 DAYS/WEEK
TABLE OF CONTENTS
UNCRATING AND INSPECTION PAGE 1
FRONT BEARING ASSEMBLY PAGE 1a
COOKING PROCEDURES PAGE 2
CLEANING PROCEDURES PAGE 3
TROUBLESHOOTING GUIDE PAGE 4, 5
MAINTENANCE PROCEDURES PAGE 5, 6
PARTS LIST PAGE 7
DRAWINGS
OPTIONAL FEED TRAY PAGE 3
DRIVE SYSTEM PAGE 4
HEATER TUBE INSTALLATION PAGE 5
COMPONENT ARRANGEMENT PAGE 7
HEAT REFLECTOR/CRUMB TRAY PAGE 7
WIRING DIAGRAM PAGE 8
REINSTALLING TOP COVER PAGE 9
FILE:F\USERS\BOB/MANUALS\VAMUAL\EZ10
HG0126
REVISED 07/25/00 RRD
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
OVEREASY MODEL EZ10
UNCRATING AND INSPECTION
Unpack unit and components from container. Remove all visible packing material, inspect unit for damage. If damage is discovered, file a claim immediately with the carrier that handled the shipment
.
ASSEMBLY AND INSTALLATION
The unit has been shipped fully assembled and ready to plug into a standard 15 amp outlet. Removal or replacement of the power supply cord and plug will result in the voiding of the warranty. For assistance, consult with the factory service team at 1-800-225-3958.
FIG. 1 PLUG CONFIGURATION
NEMA 5-15 PLUG 120V / 15 AMPS
G
WARNING
WARNING
W
: MAKE SURE ALL INPUT POWER IS OFF BEFORE
INSTALLING/REMOVING ANY PARTS.
: BE ABSOLUTELY SURE THE GROUND CONNECTION FOR THE
RECEPTACLE IS PROPERLY WIRED. NEVER CONNECT UNIT TO POWER WITHOUT PROPER GROUND CONNECTIONS. IMPROPER GROUND MAY RESULT IN SEVERE INJURY OR FATALITY.
REVISED 4/18/95 MJC
Page 1
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
MODEL EZ10
SPRING LOADED FRONT BEARING ASSEMBLY
Your Holman Conveyor Toaster is equipped with a spring-loaded front bearing assembly as shown below in fig. 1. The spring-loaded bearing assembly keeps the conveyor belt at a constant tension as the unit heats up and cools down. The conveyor belt is set to the proper tension when the white teflon bushing is flush with the end of the extension as shown in fig. 2.
Fig. 1
Fig. 2
REVISED 11/30/99 MJC
EZ10DOC.
Page 1a
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
OVEREASY MODEL EZ10
COOKING PROCEDURES
A. BREAD TOASTING
LIGHTER
DARKER
LIGHT TO DARK CONTROL
ON/OFF SWITCH
1. Switch On/Off switch control to the ON position; turn light to dark control to the center of the dial.
2. Allow warm up time of 5 to 10 minutes.
3. Test with a slice of bread.
a. If toast is too light, turn light to dark control clockwise to a slower speed.
b. If toast is too dark, turn light to dark control counterclockwise to a faster speed.
OPTIONAL FEED TRAY
1). Optional Feed Tray is Stored Inside Of Crumb Tray.
2). Slide Crumb Tray out To Expose Feed Tray.
3). Flip Feed Tray Into Position.
4). Slide Crumb Tray Back Into Unit Before Operation.
REVISED 8/31/95 MJC
Page 2
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
OVEREASY MODEL EZ10
CLEANING PROCEDURES
1. For lightly soiled conveyor belts, turn conveyor light to dark control to fastest setting and wipe with a damp cloth. For heavily soiled conveyors, turn conveyor light to dark control to fastest setting and wipe with a light abrasive pad.
2. Turn main power switch to the OFF position.
3. After the unit cools, remove interior crumb tray (as shown below) and clean. Slide crumb tray back into position. DO NOT OPERATE UNIT WITHOUT
CRUMB TRAY IN PLACE AS THIS CAUSES OVERHEATING IN THE CONTROL BOX
4. Wipe exterior surface of unit.
CRUMB TRAY
SLIDES BENEATH
CONVEYOR BELT
NOTE:
PERIODIC MAINTENANCE. CALL HOLMAN FACTORY SERVICE DEPARTMENT FOR DETAILS.
REVISED 1/16/97 MJC
LUBRICATION OF DRIVE CHAIN WITH A GRAPHITE BASED LUBRICANT IS REQUIRED AS
Page 3
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
OVEREASY MODEL EZ10
Loading...
+ 9 hidden pages