Heat & Glo Studio 24 Doors Installation Instructions

Studio 24 Doors
- Installation Instructions -
Instructions:
1. Remove door from box.
2. Remove corner spacers from door .
3. Ensure that decorative caps are hand tight (see
Figure 1).
Figure 1
5. Use 3/8 inch nuts to attach hanging brackets (with shims
if necessary) to the door studs (see Figure 3).
Figure 3 Attach hanging bracket to door
ing brackets engage J-hook slots of fireplace (see Figure 4).
TRIM TO HERE FOR NO ADDITIONAL FINISHING MATERIAL
Figure 2 Hanging Bracket
4. Hanging bracket may be trimmed for different finishing
materials. The brackets are set for 3/4 inch finishing material placed over the non-combustible header.
Trim the support leg at the first notch for 1/2 inch finish­ing material.
Trim at the third notch for no additional finishing materi­als. (There is no need to trim the hook portion of the bracket). See Figure 2.
Use the included spacer shims to adjust the spacing to approximately 1/16
th
inch of space between the front
and the finishing material.
J-HOOK
SLOT
Figure 4
Service Parts List
DESCRIPTION SERVICE PART NO.
Glass 2077-147 Cap and Barrel Assembly 2077-013 J-Hook Bracket 2077-135 Spacer Shim 2077-175
Printed in U.S.A. Copyright 2006 Hearth & Home Technologies Inc. , 20802 Kensington Boulevard, Lakeville, MN 55044
2077-902B 3/06
Loading...