Haws H1107.8 User Manual

1455 Kleppe Lane Sparks, NV 89431-6467 (775) 359-4712 Fax (775) 359-7424
HAWS AG Bachweg 3 CH-3401 Burgdorf Switzerland
Haws Mfg. Pte Lt. 2A Sungei Kadet Drive Singapore 729554
E-mail: haws@hawsco.com
NOTE TO INSTALLER: Please leave this information with the Maintenance Department.
A ground-fault circuit breaker shall be installed in the branch circuit supplying fountain equipment. NEC680-51(a).
HAWS® warrants that all of its products are guaranteed against defective material or poor workmanship for a period of one year from date of shipment. HAWS liability under this warranty shall be discharged by furnishing without charge F.O.B. HAWS Factory any goods, or part thereof, which shall appear to the Company upon inspection to be of defective material or not of first class workmanship, provided that claim is made in writing to company within a reasonable period after receipt of the product. Where claims for defects are made, the defective part or parts shall be delivered to the Company, prepaid, for inspection. HAWS will not be liable for the cost of repairs, alterations or replacements, or for any expense connected therewith made by the owner or his agents, except upon written authority from HAWS, Sparks, Nevada. HAWS will not be liable for any damages caused by defective materials or poor workmanship, except for replacements, as provided above. Buyer agrees that Haws has made no other warranties either expressed or implied in addition to those above stated, except that of title with respect to any of the products or equipment sold hereunder and that HAWS shall not be liable for general, special, or consequential damages claimed to arise under the contract of sale. The drinking fountain manufactured by HAWS is warranted to function if installation and maintenance instructions provided are adhered to. The units also must be used for the purpose for which they were intended.
NO OTHER WARRANTIES EXPRESSED OR IMPLIED ARE AUTHORIZED, PROVIDED OR GIVEN BY HAWS.
SHOULD YOU EXPERIENCE DIFFICULTY WITH THE INSTALLATION OF THIS MODEL, PLEASE CALL:
FOR PARTS CALL:
Model H1107.8 Water Cooler
LIMITED WARRANTY
1-800-766-5612 1-800-758-9378
(U.S.A. AND CANADA ONLY) MONDAY-THURSDAY: 6:00 A.M. – 4:00 P.M. PST
FRIDAY: 6:00 A.M – 1:00 P.M. PST
INSTALLATION, OPERATION
&
MAINTENANCE INSTRUCTIONS
website: www.hawsco.com
CAUTION! Prior to making any electrical connections, verify with a voltmeter that power from the service panel is off.
No. 2080221(3)
08/08 Model H1107.8 Page 1 of 7
RECOMMENDED TOOLS: Hack saw, pipe joint sealant, screwdriver, level, 12" adjustable wrench, 10" pipe wrench, 5/64“ hex key wrench, 9/16”, 1/2", 7/16” socket wrench or open end wrench.
LOCATION OF UNIT: The Model H1107.8 Cooler is a wheelchair accessible drinking water facility. The height dimensions shown, meet current ADA requirements. When installing this unit, local, state or federal codes should be adhered to. If height other than shown is required, then dimensions must be adjusted accordingly.
SUPPLY LINE: The minimum recommended line size is 1/2“IPS with 30-90 psi (2-6 ATM) flowing pressure. Where sediment or mineral content is a problem, an inlet filter is recommended.
PLUMBING CONNECTIONS: Inlet is 3/8” O.D. compression fitting. Waste trap outlet is female 1-1/4” IPS.
ELECTRICAL CONNECTIONS: 115VAC, 60HZ, 4.7 AMPS. Chiller wired direct to incoming line, by others.
PARTS LIST
MODEL PACKAGE QUANTITY ITEMS INCLUDED
MTGFR.7 1 Mounting Frame 3 #10 Sheet Metal Screws HCR8 1 Chiller H1107.8 1 Bowl Assembly
Package supply tubing assembly and 1 1 Panel-bowl back 1 Grille 1 Trap 1-1/4” IPS
1 Package of two each: grille attachment,
4 5/16 -18 retainer nuts 4 5/16 – 18 x 1 hex head screws
2 fittings
attachment clips, clip nuts, #10 sheet
metal screws and 6-32 screws
INSTALLATION PROCEDURE
The Model H1107.8 Water Cooler assembly requires installation of the mounting frame as described in Steps 1 - 2, then mounting the fountain bowl assembly as described in Steps 3 - 6, and finally completing chiller water and electrical connections and starting chiller per Steps 7 -
11. First check that all required parts are received.
Grounding may cause electrical feedback into the electric drinking fountain causing an electrolysis, which creates a metallic taste or an increase in the metal content of the water. This condition can be avoided by using dielectric couplings in the assembly. The waste line, which is supplied by the installer, should also have a dielectric (plastic) coupling to completely isolate the assembly from the building plumbing system.
08/08 Model H1107.8 Page 2 of 7
INSTALLATION PROCEDURE …
Step 1: Provide wall opening as detailed in Installation Drawing. Frame must be positioned such
that frame flanges overlap and butt against finished wall surface. Mounting holes are provided for #6 sheet metal screws. After frame is positioned in wall, swing chiller support tray into position (See Installation Drawing), align tray holes with holes in frame and fasten with #10 sheet metal screws. Mounted frame must support 50-pound chiller in addition to fountain weight and user generated forces.
Step 2: Install waste, supply and electrical lines in locations shown in Installation Drawing.
Waste and supply lines may be installed for either rear or side entry. Verify proper waste, supply, electrical and frame locations. Use level to verify horizontal and vertical frame mounting to insure proper bowl drainage.
Step 3: Installation Drawing shows fountain bowl, back panel and grille locations. Unpack bowl
and remove bottom plate using 5/64” hex-allen wrench. Install back panel on frame with narrower edge to bottom. Position nut retainers into mounting frame. Install bowl/bracket assembly onto panel using four 5/16-18x1 hex head screws hand tightened.
Step 4: Remove 1-1/4” IPS outlet elbow from trap as supplied. Install elbow inside frame onto
Step 5: Assemble waste trap onto bowl strainer using seal washer provided and tighten nut hand
Step 6: See Figure 1 for detail section view of side screw grille attachment. Unpack grille and
Step 7: Unpack and remove chiller from carton. Remove ten front panel screws and panel (See
Step 8: Thoroughly flush supply line to remove all foreign matter. Remove the grille and connect the 1/2" IPS supply screwdriver stop (not supplied) to stub-out in wall. Place chiller on
waste stub-outs.
tight.
insert upper lip behind bottom of back panel, align sides and hold up flush to bottom of back panel. Hold grille against wall and mark centers of grille side slots on wall. Masking tape may be used to prevent finished wall damage from mark. Install the “s” clips in mounting frame using #10 sheet metal screws into pre-drilled holes on lower end of each side of frame. Tighten #10 screw while holding “s” clips centered on wall marks. Check grille fit by installing grille and partially tightening #6-32 socket head screws through side of grille. Ensure proper panel and grille alignment, then tighten the four 5/16-18x1 hex head screws.
Figure 2). Do not remove insulating putty and foam from copper tubes or Styrofoam insulation from evaporator coil. Remove any inner packing, which may be around compressor. Remove junction box cover and electrical knock out on lower right side of housing. Install fittings (supplied) on chiller inlet and outlet tubes (see Installation Drawing).
chiller support tray against right hand side, fully to rear, with condenser (open panel) side facing to front., Install supply 3/8” O.D. tubing (not supplied) between screwdriver stop and chiller inlet. (Cut to proper length, Insert 1/2” to 3/4” of end of tube in connectors and tighten). Tubing insulation is not normally required on inlet side of chiller. Install insulated tube between fountain and chiller outlet. Open screwdriver stop wide open while checking for leaks at all connections. Also check waste for leaks.
08/08 Model H1107.8 Page 3 of 7
Loading...
+ 4 hidden pages