Harbor Freight Tools 69893 Owner's Manual

Table of Contents
Safety ......................................................... 3
Specifications ............................................. 4
Assembly .................................................... 5
WARNING SYMBOLS AND DEFINITIONS
This is the safety alert symbol. It is used to alert you to potential personal injury hazards.
Obey all safety messages that follow this symbol to avoid possible injury or death.
Maintenance .............................................. 29
Warranty .................................................... 32
Parts Lists .................................................. 30
will result in death or serious injury.
could result in death or serious injury.
could result in minor or moderate injury.
Addresses practices not related to personal injury.
Page 2 For technical questions, please call 1-800-444-3353. Item 69893
IMPORTANT SAFETY INFORMATION
The warnings, precautions, and instructions discussed in this manual cannot cover all possible conditions and situations that may occur. The operator must understand that common sense and caution are factors, which cannot be built into this product, but must be supplied by the operator.
Assembly / Installation Precautions
1. Assemble only according to these instructions. Improper assembly can create hazards.
2. Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.
3. This unit contains pieces with sharp edges. The machined edges of the aluminum parts and the ends of the panel clips may be sharp. Handle all parts carefully.
4. Keep assembly area clean and well lit.
5. Keep bystanders out of the area during assembly.
Use / Service Precautions
1. This product is not a toy. Do not allow children to play in or climb on this product.
Although this greenhouse does include some caps, there are still some exposed sharp edges. In addition, protective covers may fall off in time. Children must be supervised if allowed near the greenhouse.
2. SNOW/DEBRIS ACCUMULATION HAZARD. The heavy weight of accumulated snow or other debris can cause parts of this greenhouse to buckle suddenly. Do not allow debris to accumulate on top
6. Do not assemble when tired or when under the influence of alcohol, drugs or medication.
7. Product capabilities apply to properly and completely assembled product only.
8. Locate the Greenhouse on a flat, level, surface. A concrete foundation is recommended for a high-quality installation.
9. WARNING: The brass bushings inside the Rollers of this product contain lead, a chemical known to the State of California to cause birth defects (or other reproductive harm). (California Health & Safety Code § 25249.5, et seq.)
of the greenhouse. If snowfall is expected, place additional supports (not provided) underneath the Crown.
NEVER enter a greenhouse with accumulated debris on top.
3. Use as intended only.
4. Inspect periodically; replace damaged parts immediately and do not enter greenhouse if parts are loose or damaged.
5. For your safety, service and maintenance should be performed regularly by a qualified technician.
SAVE THESE INSTRUCTIONS.
Page 3For technical questions, please call 1-800-444-3353.Item 69893
Specifications
Overall Dimensions 1201/2″ W x 1441/2″ L x 123″ H
Window Dimensions 231/4″ W x 311/4″ L
Door Dimensions 751/2″ H x 351/2″ W x 11/4″ Thick
Materials
Aluminum Thickness 0.038″
Polycarbonate Sheet Thickness 0.165″
Aluminum Frame Transparent Polycarbonate Sheets
Page 4 For technical questions, please call 1-800-444-3353. Item 69893
Assembly
Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this document including all text under subheadings therein before set up or use of this product.
IMPORTANT–READ THE FOLLOWING CAREFULLY BEFORE PROCEEDING
• Thefirststepinassemblyistoassembleaproperbase.Thegreenhouse
must be properly supported to help prevent property damage and injury in the event of strong winds or inclement weather. Wind and ground conditions may vary from site to site, and may affect the practicality and effectiveness of anchoring methods substantially. If you have any doubt regarding the stability of the base/foundation you are to use, consult a professional.
• Itisalwaysyourresponsibilitytoensurethatthegreenhouseisproperlyanchored. Harbor Freight Tools cannot be held responsible for personal injury, damage to the greenhouse, or other property damage that occurs as a result of improperly anchoring the greenhouse.
• Becertaintocheckwithlocalauthoritiestoobtainallrequiredbuildingpermits
and to familiarize yourself with any building codes that may apply.
• Decideonalocationforthegreenhouse.Thelocationshouldoptimally
be a level, well-lit area that is sheltered from the wind. The door of the greenhouse should not open towards the prevailing wind, if possible.
IMPORTANT ASSEMBLY TIPS
• AssembleBoltswiththeirheadsfacingtheoutsideofthe
greenhouse, unless stated otherwise. Tighten Nuts (67) only about 1/4 turn past finger-tight; be careful not to overtighten.
• Layoutallpartsbynumberpriortoassembly.
• Atleasttwoassistantswillbenecessaryduringassembly.
• Assembleonaclear,calmday.Windwilldamagethe Greenhouseandmakeassemblydifficult.
Page 5For technical questions, please call 1-800-444-3353.Item 69893
are fastened using
32 Base Bolts (68)
All parts in this phase
and 32 Base Nuts (69).
Phase 1: Base Assembly
Page 6 For technical questions, please call 1-800-444-3353. Item 69893
Base Assembly Instructions
1. Excavate an area for the base of the
greenhouse.
The area must be 10′ 2″ wide by 12′ 2″ long by 5″ deep. The floor of
the hole must be level and square. The diagonal dimensions, from corner
to corner, should each be 15′ 5″.
2. Assemble the Base outside
the hole as shown below. Note that the angled edges of the Base Plates (43, 44) need to face the corners of the base. Use Base Bolts (68), Base Nuts (69), and Connectors (45, 46) to secure the pieces together.
3. With assistance, lower the Base into the hole. The diagonal dimensions, from outside corner to outside corner, must be equal for the base to be square.
4. Fill the hole around the outside of the base with soil.
5. This base will need to be filled with about 40 cubic feet of gravel or another appropriate fill material (not provided). The gravel should reach up to about
1″ below the lip of the base.
Page 7For technical questions, please call 1-800-444-3353.Item 69893
Plate
Base
b
attachment
Hold-down Connector (47)
Plate
Floor
Grey parts are in place before this phase.
a
c
gravel
a. Slide Connector (47) under lip.
b. Insert Regular Bolt (65).
c. Fasten with Nut (67)
43
(Right)
3
43
44
2a
(Front)
4
47
44
1a
3
43
6
44
(Left)
(Rear)
5
44
Phase 2: Floor Plate Installation
Page 8 For technical questions, please call 1-800-444-3353. Item 69893
4
43
38 Nuts (67),
are fastened using
All parts in this phase
and 4 Floor Plate
38 Normal Bolts (65),
Brackets(82).
Floor Plate Installation Instructions
Front Floor
Plate (1a, 2a)
Rear/Side
Floor Plates
(3 – 6)
gravel
ground
outside
greenhouse
Base Plate
(43, 44)
Cross Section
1. When placing the Floor Plates (1a–6) on top of the Base Plates (43, 44), align them as illustrated above. The lip should extend slightly over the edge of the Base Plate and the raised flange with bolt holes should face inside the greenhouse.
2. Place the Front-Left Floor Plate (1a) on top of the Base Plate (44). Lay the Front-Right Floor Plate (2a) next to it.
3. Fasten the Front Floor Plates (1a, 2a) together using a Floor Plate Bracket (82), and secure to the Base Plate (44) using a Hold-down Connector (47) over one of the Bolts (65), see inset on facing page.
4. Place the Side Floor Plates (4) on the Side Base Plates (43) on the front-right and rear-left corners as illustrated. Lay the Long Side Floor Plates (3) next to them.
5. Fasten the Side Floor Plates (3, 4) together using Floor Plate Brackets (82), and secure to the Base Plates (43) using 3 Hold­down Connectors (47) on each side of the greenhouse in the places illustrated; see illustration and inset on facing page.
6. Lay the Rear-right Floor Plate (6) next to the Rear-left Floor Plate (5). Fasten the Rear Floor Plates (5, 6) together using a Floor Plate Bracket (82).
7. Place the assembled Rear Floor Plates (5, 6) on top of the Base Plates (44).
8. Secure the Rear Floor Plates (5, 6) to the Base Plates (44) using 2 Hold-down Connectors (47) in the locations shown; see illustration and inset on facing page.
Page 9For technical questions, please call 1-800-444-3353.Item 69893
67
67
Plate
Base
b
Hold-down Connector (47)
attachment with Strut (79, 80)
Plate
Floor
Grey parts are in place before this phase.
a
c
gravel
d
a. Slide Connector (47) under lip.
b. Insert Brace Bolt (66).
c. Slide Strut (79, 80) over Bolt.
d. Fasten with Nut (67)
49
3
80
(Right)
49
7
79
2a
(Front)
4
1a
79
7
80
3
65
65
49
7
7
47
47
79
31
49
80
6
(Rear)
79
7
31
(Left)
4
80
5
Parts in this phase
are fastened using
10 Normal Bolts (65),
and 26 Nuts (67).
14 Brace Bolts (66),
2 Double Brace Bolts (78),
Phase 3: Corner Post Installation
Page 10 For technical questions, please call 1-800-444-3353. Item 69893
Loading...
+ 22 hidden pages