Driver●
Nipper●
Hacksaw●Pipe cutter●
Hole core drill●Flaring tool●
Spanner(17,19 and 26mm)●Knife●
Gas leakage detector or●
soap-and-water solution
●
(17mm,22mm,26mm)
Measuring tape●
Reamer●
Power Source
●
Before inserting power plug into receptacle, check the voltage without fail.
The power
Install an exclusive branch circuit of the power.
●
A receptacle shall be set up in a distance where the power cable can be
●
reached.
source is the same as the
Do not extend the cable by cutting it.
corresponding name plate.
Drawing for the installation of indoor and outdoor units
The models adopt HFC free refrigerant R410A
more than 5cm
more than
10cm
Arrangement of piping
directions
Rear left
Left
Rear
right
Indoor Unit
Place, robust not causing vibration, where the body can be supported sufficiently.●
Place, not affected by heat or steam generated in the vicinity, where inlet and outlet of the
●
unit are not disturbed.
Place, possible to drain easily, where piping can be connected with the outdoor unit.●
Place, where cold air can be spread in a room entirely.●
Place, nearby a power receptacle, with enough space around. (Refer to drawings).●
Place where the distance of more than lm from televisions, radios, wireless apparatuses
●
and fluorescent lamps can be left.
In the case of fixing the remote controller on a wall, place where the indoor unit can
●
receive signals when the fluorescent
Outdoor Unit
Place, which is less af fected by rain or direct sunlight and is sufficiently ventilated.●
Place, possible to bear the unit, where vibration and noise are not increased.●
Place, where discharged wind and noise do not cause a nuisance to the neighbors.●
Place, where a distance marked●
Attention must be paid to
the rising up of drain hose
more than 10cm
A
lamps in the room are lightened.
is available as illustrated in the above figure.
G
F
Floor fixing dimensions of the
outdoor unit (Unit:mm)
Optional parts for piping
Non-adhesive tape
A
Adhesive tape
B
Saddle (L.S) with screws
C
Connecting electric cable
D
for indoor and outdoor
E
Drain hose
F
Heating insulating material
Piping hole cover
G
Right
Below
The marks fromto
●
G
in the figure are the
more than 10cm
more than
A
10cm
C
113.5
Fixing of outdoor unit
parts numbers.
The distance between
●
the indoor unit and the
floor should be more
than 2m.
more than
60cm
D
E
more than15cm
Please be subject to the actual product purchased , the above picture is just for your reference.
Read this manual before installation
Explain sufficiently the operating means to the user according to this manual
NO.0010506358
583
Fix the unit to concrete or block●
with bolts (10mm) and nuts firmly
and horizontally.
When fitting the unit to wall●
surface, roof or rooftop, fix
a supporter surely with nails
or wires in consideration of
earthquake and strong wind.
If vibration may affect the●
house, fix the unit by attaching a
vibration-proof mat.
113.5
5
.
9
1
3
Page 2
Remote controller (1)
R-03 dry battery (2)
Mounting plate (1)
Plastic cap (4)
Ø4X25 Screw
Indoor unit
Accessory parts
Drain hose (1)
Cushion (4)
Drain-elbow (1)
(4)
Pipe supporting plate (1)
Selection of pipe
Liquid pipe (Ø)6.35mm(1/4”)
Gas pipe (Ø)
NOTE:The thickness of the pipe must be 0.8mm at least.
12.7mm(1/2”)
1. Insert the drain hose into the dent of heat insulation materials of indoor unit.
2. Insert the indoor/outdoor electric cable from backside of indoor
out on the front side, then connect them.
3. Coat the flaring seal face with refrigerant oil and connect pipes.
Cover the connection part with heat insulation materials closely, and make sure
fixing with adhesive tape
Heat insulation
material
Lid for right
piping
Lid for under piping pipe
Fix with adhesive tape
●
Indoor/outdoor electric cable and drain hose must be bound with refrigerant
piping by protecting tape.
Lid for left piping
Drain hose
unit, and pull it
Indoor/outdoor electric c able
Piping
Pipe supporting
plate
[ Other direction piping ]
●
Cut away, with a nipper, the lid for piping according to the piping direction and
then bend the pipe according to theposition of wall hole. When bending, be
careful not to crash
●
Connect beforehand the indoor/outdoor electric cable,
connected to the heat insulation of connecting part specially.
pipes.
and then pull out the
1
Fitting of the Mounting Plate and
Positioning of the wall Hole
When the mounting plate is first fixed
1. Carry out, based on the neighboring pillars or lintels, a
to be fixed against the wall, then temporarily fasten the plate with one steel nail.
2. Make sure once more the proper level of the plate, by
weight from the central top of the plate, then fasten securely the plate with the
attachment steel nail.
3. Find the wall hole location A using a measuring tape
B= 60mm
A=145mm
A=150mm
proper leveling for the plate
hanging a thread with a
30mm
B= 60mm
30mm
When the mounting plate is fixed side bar and lintel
Fix to side bar and lintel a mounting bar, Which is separately sold, and then
●
fasten the plate to the fixed mounting bar.
Refer to the previous article, “ When the mounting plate is
●
position of wall hole.
2
Making a Hole on the Wall and Fitting the Piping Hole Cover
Make a hole of 60 mm in diameter, slightly descending to outside the wall.
●
Install piping hole cover and seal it of f with putty after installation
●
Wall hole
Ø60mm
Outdoor side
(Section of wall hole)
3
Installation of the Indoor Unit
Indoor side
Thickness of wall
Piping hole pipe
G
first fixed “, for the
Fixing the indoor unit body
Hang surely the unit body onto the upper notches of the
●
mounting plate. Move the body from side to side to verify its
secure fixing.
In order to fix the body onto the mounting plate,hold up
●
the body aslant from the underside and then put it down
perpendicularly.
Unloading of indoor unit body
When you unload the indoor unit,please use
●
your hand to arise the body to leave agraffe,
then lift the bottom of the body outward
slightly and lift the unit aslant until it
leaves the mounting plate.
agraffe
4
Connecting the indoor/outdoor Electric Cable
Removing the wiring cover
Remove terminal cover at right bot tom corner of indoor unit, then take●
off wiring cover by removing its screws.
When connecting the cable after installing the indoor unit
1. Insert from outside the room cable into lef t side of the wall
hole, in which the pipe has already existed.
2. Pull out the cable on the front side, and connect the cable
making a loop.
When connecting the cable before installing the indoor unit
Insert the cable from the back●
●
Loosen the screws and insert
tighten the screws.
Pull the cable slightly to
●
tightened.
After the cable connection,
●
wiring cover.
side of the unit, then pull it out
the cable ends fully into
make sure the cables have
never fail to fasten the connected cable with the
been properly inserted and
mounting plate
mounting plate
on the front side.
terminal block, then
Drawing of pipe
[ Rear piping ]
Draw pipes and the drain hose, then fasten them with the adhesive tape
●
[ Left·Left-rear piping ]
●
In case of left side piping, cut away, with a nipper, the lid for left piping.
In case of left-rear piping, bend the pipes according to the piping direction to
●
the mark of hole for left-rear piping which is marked on heat insulation materials.
2
When connecting the cable, confirm the terminal number of indoor and
Note
outdoor units carefully. If wiring is not correct, proper operation can not
be carried out and will cause defect.
Page 3
Outdoor unit
1
Installation of Outdoor Unit
Indoor unit
Power cable:
3G2.5mm
Connecting wiring:
HSU-22HEA03
HSU-22HRA03/R2
)43
N
(
2
)
L
(
1
Indoor unit
Power cable: ≥3G2.5mm
Connecting wiring:
≥3G1.5mm
Outdoor unit
2
6G0.75mm
/R2
2
2
(For: L N )+2x0.75mm
21
3
4
5
L N
Outdoor unit
POWER
1
(
L
)
(2
N
)
2
Install according to Drawing for the installation of indoor and
Connection of pipes
2
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
●
and the bending radius should be 30 to 40
●
Connecting the pipe of gas side first makes working easier.
The connection pipe is specialized for R410A.●
Half union
Spanner
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 7m, the function of the unit will be
affected. If the pipe has to be lengthened, the refrigerant should be charged,
according to 20 g/m. But the charge of refrigerant must
sional air conditioner engineer. Before adding additional refrigerant, perform air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
charge additional refrigerant.
Flare nut
Torque wrench
Forced fastening without careful centering may
damage the threads and cause a leakage of gas.
Liquid side6.35mm(1/4")18N.m
Liquid/Gas side9.52mm(3/8")42 N.m
Gas side 12.7mm(1/2")55N.m
Gas side 15.8 8mm(5/8")60 N.m
mm or longer.
Pipe Diameter(ǿ)Fastening torque
outdoor units
be conducted by profes-
CAUTION
Outdoor unit
Indoor unit
B
A
Outdoor unit
B
Indoor unit
A
HSU-18RM03/R2
HSU-18HEA03/R2-I
HSU-18HRA103/R2
1. If the supply cord is damaged, it must be replaced by the manufacturer or its
service agent or a similar qualified person. The type of connecting wire is
H05RN-F
2. If the fuse on PC board is broken please change it with the
T. 3.15A/250V.
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into fixed wiring. The breaker should be
all-pole
than 3mm.
or H07RN -F.
switch and the distance betwee
type of
n its two contacts should be not less
Max.Elevation:
●
Outdoor unit
Oil trap
B
A
3
4
5
Connection
Use the same method on indoor unit. Loosen the screws on
●
insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor
●
unit.
If wiring is not correct, proper operation can not be carried out and controller
●
may be damaged.
Fix the cable with a clamp.●
Attaching Drain-Elbow
If the drain-elbow is used,●
please attach it as figure. (Note:
Only for heat pump unit.)
Purging Method:To use vacuum pump
1.
Detach the service port’s cap of
and 3-way’s, connect the service port into the
for gaugemanifold.
gemanifold into vacuum pump.
Open the handle at Iow in
2.
moves of gause (Iow) reach vacuum condition in a moment, check
Indoor unit
Then connect the projection of charge hose (center) for gau-
gaugemanifold, operate vacuum pump. If the scale-
In case the elevation A is more●
than 5m, oil trap shoud be
installed every 5~7m
●
Max. Length:
In case the pipe length B is●
more than 7m, the refrigerant
should be charged, according
to 20 g/m.
3-way valve, the valve rod’s cap for 2-way valve
Amax=15m
Bmax=25m
terminal block and
projection of charge hose (Iow)
1. again.
3.
(76 cm Hg) at Iow
handle ‘Lo’ in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
tightening, make flaring work again, the return to the beginning of 3 .
Open the valve rod for the 2-way valve to an angle of4.
pressure side. After the
completion of vacuumizing, close the
anticlockwise 90 degrees.
ze for over 15min.And check the level gauge which should read - 0.1MPa
Vacuumi
3
Page 4
1
1+2=
kg
R410A
2
kg
2=
1=
B
C
D
FE
kg
A
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
• 1 the factory refrigerant charge of the product
• 2 the additional refrigerant amount charged in the field and
• 1+2 the total refrigerant charge
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop value cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Refrigerant charge label■
After 6 seconds, close the
No gas leakage?5.
In case of gas leakage, tighten parts of pipe connection. If
leakage stops, then proceed 6. steps
2-way valve and make the
inspection of gas leakage.
CorrectIncorrect
Lean
Damage of flare CrackPartial Too outside
If it does not stop gas leakage, discharge whole refrigerants
port. After flaring work again and vacuumize, fill up prescribed
Detach the charge hose6.
the valve rod anticlockwiseuntil hitting lightly.
To prevent the gas
7.
valve and 3-way’s a little more
After attaching the each
8.
Step 1.
Tube(for R410A)
Step 4.
Open 90
2-way valve
2-way valve Liquid Side
3-way valve Gas Side
Vacuum pump(for R410A)
2-way valve
3-way valve
O
3-way valve
refrigerant from the gas cylinder.
from the service port,
leakage, turn the ser vice
Gaugemanifold(for
Anti countercurrent joint
than the point where the torque increases sudden
caps, check the gas
R410A)
open 2-way valve and 3-way. Turn
port’s cap, the valve
leakage around the caps.
Step 2.
Open
Step 3.
Step 6.
Step 7.
Service port cap
Close
from the service
rod’s cap for 2-w
2-way valve
3-way valve
2-way valve
3-way valve
Valve rod cap
Valve rod cap
CAUTION
●
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
refrigerant. Vacuumize first, then
ner according to the amount marked on the name plate.
●
Please do not let other cooling medium, except specified one (R410A), or air
enter into the cooling circulation system. Otherwise, there will be abnormal
high pressure in the system to make it crack and lead to personal injuries.
1
Power Source Installation
●
The power source must be exclusively used for air
In the case of installing an air conditioner in a moist place,●
rth leakage breaker.
●
For installation in other places, use a circuit breaker as far
2
Cutting and Flaring Work of Piping
Pipe cutting is carried out with a pipe cutter and burs must●
After inserting the flare nut, flaring work is carried out.●
Flare tool for R410AConventional flare tool
Clutch-typeclutch-type(Rigid-t ype) Wing-nut type (Imperial-type)
A0~0.5mm1.0~1.5mm1.5~2.0mm
Flare tooling die
charge the liquid refrigerant into air conditio-
conditioner. (Over I0A)
please install an ea-
as possible.
be removed.
1.Cut pipe
3.Insert the flare nut
2.Remove burs
4.Flare pipe
3
On Drainage
Please install the drain hose so as to be downward slope without fail.
●
Please don’t do the drainage as shown below.
●
ay
l
y.
It becomes
high midway.
Please pour water in the drain pan of the indoor unit, and
●
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please
●
it without fail.
The end is immersed in water.
It waves.
Less than
5cm
The gap with the
ground is too smal
There is the bad
smell from a ditch
confirm that drainage
apply heat insulation to
Check for Installation and Test Run■
Please kindly explain to our customers how to operate
■
through the instruction manual.
Check Items for Test Run
Put check mark
Gas leak from pipe connecting?
Heat insulation of pipe connecting?
Are the connecting wirings of indoor and outdoor firmly
inserted to the terminal block?
Is the connecting wiring of indoor and outdoor firmly fixed?
Is drainage securely carried out?
Is the earth line securely connected?
Is the indoor unit securely fixed?
Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
in boxes
4
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.