Great Plains VT5300 Operator Manual

Assembly Instructions for the Ridge Splitter
Verti-Till
9/23/03
Your initial action is to bolt the angled drop stubs [(3) 589-147H] to the back 4x4 tube on the Verti-Till using 5/8x4x5 ½ U-Bolts [(63) 806-184C] 5/8” hex nuts [(25) 803-021C] and 5/8” lock washers [(26) 804-022C]. Be sure to place them as shown on the overhead layout. Do not tighten these bolts at this time. Your next step is to U-Bolt the splitter shank tube(s) [(1) 589-077D or 589-081D] to the drop stubs. Be sure everything is placed with the correct dimensions and tighten everything down at this time.
Your spring shank should come to you pre-assembled, so installation of these should be fairly straightforward. Take the shank mount plate off of the assembly and bolt the spring shank assembly to the splitter shank tube. Space the spring shank assemblies out as shown on the overhead layout and tighten bolts.
Loading...
+ 2 hidden pages