Glow-worm SS 115, SS 150, SS 175, SS 200, SS 250 Instructions For Use Manual

...
12563
Unvented hot water
storage cylinders
SS 115-SS 150-SS 175-SS 200
SS 250-SS 300
Instructions for Use
Installation and Servicing
For customer service call:
01773 828100
Technical helpline: 01773 828300
For General and Sales enquiries:
Tel. 01773 824141
Fax: 01773 820569
To register your Glow-worm appliance call:
0800 073 2142
Guarantee Registration
Thank you for installing a new Glow-worm cylinder in your home.
Glow-worm appliances' are manufactured to the very highest standard so we are
pleased to offer our customers' a Comprehensive Guarantee.
We recommend you complete and return your Guarantee Registration Card as soon
as possible.
If this card is missing you can obtain a copy or record your registration by
telephoning Glow-worm's own service organisation on 01773 828100.
Our Guarantee gives you peace of mind plus valuable protection against
breakdown.
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference. Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.central heating.co.uk for more information.
2
Contents
The instructions consist of three parts, User, Installation and Servicing Instructions. The
instructions are an integral part of the appliance and must, to comply with the current
issue of the Gas Safety (Installation and Use) Regulations, be handed to the user on
completion of the installation.
CONTENTS DESCRIPTION SECTION PAGE
Testing and Certication 4 Design Description 4 Technical Data 1 5 Instructions for Use 2 6 Note to Installer 3 8
Installation 4 8 Commissioning 5 15
Maintenance 6 15 Fault Finding 7 16
INTRODUCTION
INSTALLATION
MAINTENANCE
3
NOTE: Only the correct immersion heater containing a safety overheat thermostat may be used for replacement.
Applications
The Glow-worm cylinder can be connected to any UK standard boiler.
Typical applications
Single bathroom property: Glow-worm cylinder SS 115 Single bathroom property with an en-suite shower room: Glow-worm cylinder SS 115 / SS 150 Two bathroom property: Glow-worm cylinder SS 150 / SS 175 Two bathroom property with an en-suite shower room: Glow-worm cylinder SS 175 / SS 200 Larger properties: Glow-worm cylinder SS 250 / SS 300 Commercial use: size depending upon hot water requirements. NOTE 1: Select the appropriate boiler to match the heating load (with the normal allowance for heating up from cold) plus an allowance for heating the hot water cylinder. Typically it is practice to allow an additional 2-3 kW for the hot water production. NOTE 2: Consideration should be given to the use of a larger size of cylinder than shown above where high water demands are likely.
The Glow-worm range of unvented hot water storage cylinders are indirectly heated cylinders which are designed for use with UK standard boilers in hot water supply systems. Glow-worm cylinders are available in six sizes; 115, 150, 175, 200, 250 and 300 litre. The cylinders are of stainless steel construction, insulated with EPS and enclosed in a decorative casing. They are supplied with all necessary cold and hot water controls and a 2 port valve for control of domestic hot water. The Glow-worm cylinders operate using a mains water pressure supply and do not require a feed from a cold water storage tank. The Glow-worm cylinders have 22 mm DHW outlet and cold water mains inlet connections for optimum ow rate. To achieve optimum performance from the Glow-worm cylinder an adequate cold water mains supply pressure and ow rate must be available (see section 4.2: Mains Water pressure).
DHW Temperature Control
The Glow-worm cylinder is supplied tted with an adjustable domestic hot water (DHW) thermostat with thermal cut­out and manual reset button which controls, via a 2 port motorised valve, the temperature of the water in the Glow­worm cylinder. The external electrical controls should be wired to the 2 port valve and cylinder thermostat in the normal way, as shown in the section Electrical Connections and Controls.
CH Control
Central heating is controlled by a separate 2 port valve in conjunction with suitable external controls, such as a programmer, room thermostat and thermostatic radiator valves.
Immersion Heater
Glow-worm cylinders are also provided with an auxiliary back up 3 kW electric immersion heater, including an adjustable thermostat, thermal cut-out and manual reset button and are tted behind the front panel.
Testing and Certication
This product has been assessed and complies with the requirements of the Building Regulations for unvented hot water storage systems and must not be altered or modied in any way. Any alteration not approved by Glow-worm, could invalidate the certication, warranty and may also infringe the current issue of the Statutory Requirements. WARNING: We cannot accept responsibility for any damage which may occur as a result of non-observance of these instructions. Subject to alteration.
Spare Parts
IMPORTANT: Use only genuine spare parts supplied by
Glow-worm.
Testing and Certication
Design Description
Assessed and found to comply with the requirements of the Building Regulations for unvented hot water storage systems.
WRAS Approval No.
0501063
4
NOTE: Heat up time based on a primary ow rate of 15 l/min at 82 °C. Temperature rise is from 15 °C to 65 °C for 70 % of the cylinder volume.
SS 115 SS 150 SS 175 SS 200 SS 250 SS 300 Unit
Size 115 150 175 200 250 300 litres
Nominal DHW ow from
GW 115/150/175/200
GW 250/300
15 l/min @ 60°C
20 l/min @ 60°C
Max. water supply pressure
10 bar
Expn. vessel charge pressure
4 bar
Operating pressure
3.5 bar
Pressure reducing valve
3.5 bar
Expansion relief valve
6.0 bar
T/P valve
95 / 7.0
°C bar
Net weight
28 30 33 39 44 49 kg
Weight (full)
145 175 205 245 310 340 kg
Height
969 1179 1339 1499 1789 2109 mm
Cylinder connections:
Cold mains inlet 22 mm compression
DHW outlet 22 mm compression
Balanced pres. cold water outlet 22 mm compression
DHW secondary return
G 3/
4
CH ow 22 mm compression (on 2 port valve)
CH return 22 mm compression
Electrical connections:
3 kW Immersion heater
230/240 V. 50 Hz
Two port valve
230/240 V. 50 Hz
Cylinder thermostat
230/240 V. 50 Hz
Coil Specications:
Heat loss
1.7 1.9 2.0 2.1 2.3 2.5 kW/24h
Heatup time
23 25 26 30 38 49 min
Recovery
20 21 23 27 33 44 min
SS 300
SS 250
SS 200
SS 175
SS 150
SS 115
12738
1 Technical Data
5
2.3 How to use your Glow-worm hot water cylinder
Your boiler and Glow-worm unvented hot water cylinder will provide both central heating and mains pressure hot water. Check that the boiler is operational as detailed in the instructions for use supplied with the boiler. The domestic hot water thermostat on the Glow-worm cylinder can be set from 20°C to 65°C. The desired temprature will be set by the installer while commissioning the Glow-worm cylinder (normally a setting of 60°C is adequate). NOTE: In hard water areas the DHW temperature selected should not exceed this setting to avoid possible scale build-up. If a programmer has been tted to control the central heating and hot water, check that this is set to the desired on and off periods. The boiler will then operate automatically to heat the cylinder contents at the desired times to the temperature selected. When domestic hot water is used, the boiler will operate to re-heat the cylinder as required.
2.4 Immersion heater
The electric immersion heater behind the front panel is provided as a back up means of water heating and is not intended for use at the same time that the boiler is heating the cylinder.
2.5 Important Notes
Shutting down the Glow-worm cylinder
To shut down the heating and hot water system for short periods, simply turn off the boiler as shown in the instructions supplied with the boiler.
Frost protection
Please ensure that if you are absent during a period of frost the central heating system remains in operation and the rooms and Glow-worm cylinder are kept above freezing point. It must be remembered however that the boiler will be automatically switched off by built-in monitoring devices if certain faults occur, e. g. interruption in the gas or electricity supply. Alternatively you can drain the central heating system, boiler and Glow-worm cylinder. Please contact your Installer.
Care and Maintenance
The casing of the Glow-worm cylinder may be cleaned with a damp cloth and a little soap. Do not use any abrasive or solvent material which could damage the case or ttings. It is important that your hot water cylinder is serviced annually by a competent person approved at the time by the Health and safety Executive. Please contact your installer or Glow­worm 01773 828100 for further details.
2.1 Introduction
Your Glow-worm unvented hot water cylinder together with a boiler, provides you a modern, efcient, high performance heating and hot water system. Because your Glow-worm hot water cylinder is supplied with water directly from the mains, you get the benet of mains pressure hot water at your hot taps, without the need for storage tanks in the loft and without a hot water pump. The Glow-worm cylinder is made from high quality stainless steel within an easy clean casing. The cylinder is fully insulated using environmental friendly EPS insulation to help keep your hot water running costs at a minimum, and protect the environment! Your Glow-worm cylinder is tailor made to accompany a Glow-worm boiler as well as any other UK standard boiler. All Glow-worm boilers are equipped with 'built-in' energy saving technology, such as burner modulation, anti cycling control and high efciency heat exchangers. Please read these instructions carefully to ensure that you get the very best out of your heating and hot water system.
2.2 Liability
WARNING: We can accept no liability whatsoever for damage
or injury resulting from failure to observe these instructions.
Specied use
Glow-worm unvented cylinders are made to full the latest technical specication and ofcial safety regulations. These cylinders are designed for use with UK standard boilers for use in hot water supply systems. Use of this type is entirely at the owner's risk. The term 'specied use' also covers observance of the operating and installation instructions, along with adherence to the servicing schedules. NOTE: The commissioning should be carried out by a competent person approved at the time by the Health and Safety Executive and in accordance with the current issue of BS6798. The Benchmark documents, for both boiler and cylinder, should be completed by the installer and/or commissioning engineer and handed to the user. The Benchmark checklist and service record are located on the inside back pages of these instructions. Do not remove or adjust any component part of this cylinder. In the unlikely event that your Glow-worm develops a fault, such as a ow of hot water from the discharge pipe, switch the boiler and immersion heater off and contact Glow-worm or your installer. NOTE: If the Glow-worm cylinder is installed in a cupboard used for airing purposes please ensure that clothing or other articles are not placed on the cylinder or its associated controls. NOTE: Access should always be maintained to allow operation of the domestic hot water thermostat control.
2 Instructions for Use
6
Diagram 2.1
12528
2.6 Guarantee
Glow-worm offers a guarantee of 25 years for the stainless steel vessel against faulty materials or manufacture: The following information is important as without it your guarantee may be invalid.
1. The warranty will become invalid if the damage is due to scaling, frost damage, transient voltages, lightning strikes or any act of vandalism or misuse.
2. The proof of purchase must be produced in the event of any warranty claim (bill of sale).
3. The Glow-worm cylinder must be installed by a competent person approved at the time by the Health and
safety Executive to the prevailing standards, installation book and building regulations at the time of installation.
4. The benchmark cylinder commissioning checklist must be completed on installation and kept up to date.
5. The Glow-worm cylinder must be serviced annually.
6. The installation must be in an appropriate location
and its use is restricted to potable water (chloride levels less than 200 mg/l).
7. Tampering or modication will invalidate the warranty.
8. The guarantee card must de completed and returned
to Glow-worm, within 30 days of purchase.
9. The guarantee does not cover the effects of scale.
For all other Glow-worm parts (electrical, thermal controls, valves and design elements Glow-worm carry a 2 year guarantee.
2 Instructions for Use
7
4.1 Siting
IMPORTANT. With regards to the Manual Handling Operations, 1992 Regulations, the following lift operation exceeds the recommended weight for a one man lift. Locate the Glow-worm cylinder in the building in the most convenient position ensuring that:
1. The discharge pipe from the tundish can be installed with a minimum fall of 1:200 and must be terminated in a safe and visible position (see section 4.4 Discharge pipework).
2. The base chosen for the unit is level and capable of supporting the weight of the cylinder when full (see section 1 Technical Data).
3. The installation site is frost-free. If necessary provide a frost protection thermostat.
4. Access is available for user operation of the DHW temperature control under the front panel.
5. Suitable clearances exist to allow installation, checking and repressurising of the expansion vessel.
6. The installation site chosen does not result in excessive ”dead leg” distances, particularly to the point of most frequent use.
7. A suitable cold mains water supply pipe can be provided to the Glow-worm cylinder direct from the main water stop valve of the building.
8. The cylinder is factory equipped with adjustable feet to
allow for uneven oor surface.
This product has been assessed and found to comply with the requirements of the Building Regulations for unvented hot water storage systems and must not be altered or modied in any way. The installation must be carried out by a competent person approved at the time by the Health and Safety Executive and be in accordance with the relevant requirements of the Local Authority, Building Regulations, Building Regulations (Scotland), Building Regulations (Northern Ireland), and the bye-laws of the local Water Undertaking. The installation is subject to Building Regulation approval, notify the Local Authority of intention to install. In the event of parts replacement, use only genuine spare parts supplied by Glow­worm.
3.1 DHW System
The Glow-worm cylinder is provided with all necessary safety and control devices for unvented DHW operation. These are as follows: A Temperature (95°C) and pressure relief valve (7 bar) factory
tted.
B A Thermal cut set at 90°C which when wired to the 2 port
valve will isolate the heat source in the event of failure of the cylinder thermostat.
C A cylinder thermostat (20°C - 65°C) D Expansion relief valve (6.0 bar) incorporating a non return
valve.
E Pressure limiting valve (3.5 bar) incorporating a line strainer.
3 Note to Installer
4 Installation
4.2 Mains Water Pressure
The DHW performance of an Glow-worm unvented cylinder installation will depend on to the available mains water supply pressure and ow rate. To achieve optimum performance from the Glow-worm cylinder a suitable cold mains water supply must be available, i. e. the measured static pressure from the incoming mains water supply should be at least 2.0 bar. A corresponding ow rate at least 20-25 l/min should be available. NOTE: Mains water pressure will be reduce during periods of peak demand. Ensure that measurements are taken during these periods. Example: If the measured cold mains supply pressure is 2 bar static and the cold mains ow rate available is 30 l/min, the available ow rate of mixed water at 40°C will be 25 l/min (from 15 l/min hot water from the Glow-worm cylinder @ 60 °C together with 10 l/min cold water @ 10°C). The Glow-worm cylinder will operate satisfactorily with water supply pressures below 2 bar although ow rates will be reduced. If the supply pressure is below 1 bar the Glow-worm cylinder should not be installed. Contact Glow-worm for details on alternative hot water supply systems. In order to minimise frictional losses minimum 22 mm bore is recommended for new cold mains supply pipework into the dwelling although satisfactory performance can be achieved with 15 mm bore pipework.
Check that the cylinder has been supplied with the following:
Packed inside cylinder carton
• Water control pack (pressure reducing valve, expansion relief valve; connections for: balanced cold water, secondary return, expansion vessel)
• Motorised 2 port valve
• Tundish
• Instructions for Use, Installation and Servicing.
Expansion vessel:
• 12 litre for Glow-worm cylinder SS 115/SS 150
• 18 litre for Glow-worm cylinder SS 175/SS 200
• 25 litre for Glow-worm cylinder SS 250/SS 300
• Four compression ttings
Accessory: Mounting bracket No. 0020000000
Prior to installation, ensure that the Glow-worm cylinder is stored upright in dry conditions. Please also refer to “General Requirements“ in the installation instructions supplied with the boiler.
3.2 DHW Secondary Return
A secondary return connection is provided in the water control pack. Remove the 3/4 BSP blanking plug from the water control group using an appropriate tting. Using a WRAS approved circulation pump which incorporates a check valve to prevent backow (see g. 6). The secondary connection can be made.
8
Loading...
+ 16 hidden pages