Read, understand and obey these safety rules and
operating instructions before operating this machine.
Only trained and authorized personnel shall be
permitted to operate this machine. If you have any
questions, call Genie Industries.
Industries in the USA and many other countries.
Printed on recycled paper
Printed in U.S.A.
Genie Super HoistPart No. 82297
Page 3
Fourth Edition • Second PrintingOperator’s Manual
Safety Rules
Warning
Failure to obey the instructions and
safety rules in this manual may
result in death or serious injury.
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
Know and understand the safety rules before
going on to the next section.
2 Always perform a pre-operation inspection.
3 Always perform function tests prior to use.
4 Inspect the workplace.
5 Only use the machine as it was intended.
You read, understand and obey the
manufacturer's instructions and safety rules—
safety and operator's manuals and machine
decals.
You read, understand and obey employer's
safety rules and worksite regulations.
You read, understand and obey all applicable
governmental regulations.
You are properly trained to safely operate the
machine.
Part No. 82297Genie Super Hoist1
Page 4
SAFETY RULES
Fourth Edition • Second PrintingOperator’s Manual
Tip-over Hazards
Do not use this machine
to lift people. This
machine is intended for
lifting material only.
Do not stand on the
platform.
Do not raise the platform
unless the machine is on
a firm, level surface.
Do not raise the platform unless all four legs are
locked into the down position and each caster
brake has been locked.
Do not raise the platform unless the load is
centered and secured with rope or straps.
Do not move the machine while the platform is
raised.
GH 3.8: Do not exceed rated load capacity of
136 kg / 300 lbs.
GH 5.6: Do not exceed rated load capacity of
113 kg / 250 lbs.
Do not place ladders or scaffolds against any part
of this machine.
Do not use this machine on a moving or mobile
surface or vehicle.
Immediately lower the platform if side deflection or
bowing occurs.
Electrocution Hazard
This machine is not electrically insulated and will
not provide protection from contact with or
proximity to electrical current.
Do not operate the machine within 10 feet / 3 m of
any overhead electrical current.
Keep away from the machine if it contacts
energized power lines or becomes electrically
charged.
Do not raise the platform in strong or gusty winds.
Increasing the load surface area will decrease
machine stability in windy conditions.
2Genie Super HoistPart No. 82297
Page 5
Fourth Edition • Second PrintingOperator’s Manual
SAFETY RULES
Collision Hazards
Do not lower the platform unless the area below is
clear of personnel and obstructions.
Do not raise the platform unless the load is
centered and secured with rope or straps.
Do not stand under or allow personnel under the
machine when the load is raised.
Inspect the workplace to avoid overhead
obstructions or other possible hazards.
Do not use or raise the platform unless it has been
securely fastened to the mounting plug.
Do not add or remove the load while the platform is
raised. The platform will move if the load is added
or removed while raising or lowering.
Damaged Machine Hazard
Do not use a damaged or malfunctioning machine.
Improper Use Hazard
Do not leave the machine unattended. Use of this
machine by unauthorized personnel could result in
death or serious injury.
Do not unplug the hose and hand control with a load
on the platform. Be aware of the position of the
hose and hand control and protect it from puncture,
crushing and severing.
Part No. 82297Genie Super Hoist3
Page 6
Pre-Operation Inspection
Fundamentals
The pre-operation inspection is a visual inspection
performed by the operator prior to each work shift.
This inspection is designed to discover if anything
is apparently wrong with a machine before the
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
Know and understand the pre-operation
inspection before going on to the next
section.
3 Always perform function tests prior to use.
operator tests it.
Refer to the list on the next page and check each
of the items.
If damage or any unauthorized variation from
factory delivered condition is discovered, the
machine must be tagged and removed from
service.
Repairs to the machine may only be made by a
qualified service technician, according to the
manufacturer's specifications. After repairs are
completed, the operator must perform a preoperation inspection again before going on to the
function tests.
Fourth Edition • Second PrintingOperator’s Manual
4 Inspect the workplace.
5 Only use the machine as it was intended.
4Genie Super HoistPart No. 82297
Page 7
Fourth Edition • Second PrintingOperator’s Manual
PRE-OPERATION INSPECTION
Pre-operation Inspection
o
Be sure that the operator’s manual is complete,
legible and available for reference.
o
Be sure that all decals are legible and in place.
See Decals section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
Visually inspect all machine components.
o
Platform and T-nut
o
CO
2 tank, CO2 tank bracket and pressure
regulator
o
Hose and hand control
o
Cylinder assembly
o
Base, legs, leg locks, leg lock springs and
casters
Part No. 82297Genie Super Hoist5
Page 8
Function Tests
Do Not Operate Unless:
Fourth Edition • Second PrintingOperator’s Manual
Function Tests
If any of the results listed under the following steps
are not observed or any other malfunction is
discovered, the machine must be tagged and
removed from service.
Setup
1 Select a firm, level area free of obstructions.
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to
use.
Know and understand the function tests
before going on to the next section.
4 Inspect the workplace.
5 Only use the machine as it was intended.
Fundamentals
The function tests are designed to discover any
malfunctions before the machine is put into service.
The operator must follow the step-by-step
instructions to test all machine functions.
A malfunctioning machine must never be used. If
malfunctions are discovered, the machine must be
tagged and removed from service. Repairs to the
machine may only be made by a qualified service
technician, according to the manufacturer's
specifications.
2 Stand the machine up on its base. Release the
leg locks one at a time and lower each leg to
the down position.
3 Firmly grasp the cylinder assembly and lift it
enough for each leg to lock into the down
position.
Result: All four leg locks should click into the
locked position.
4 Position the platform over the mounting plug and
fasten it securely with the T-nut.
5 Set the CO2 tank bracket next to the CO2 tank.
Wrap the straps around the tank and attach the
tank tightly to the bracket. Set the CO2 tank
bracket with the tank on any one of the hoist
legs.
Note: Leave the tank on the bracket until it is
necessary to change tanks.
After repairs are completed, the operator must
perform a pre-operation inspection and function
tests again before putting the machine into service.
6Genie Super HoistPart No. 82297
Page 9
Fourth Edition • Second PrintingOperator’s Manual
FUNCTION TESTS
6 Spin the pressure regulator connecting nut onto
the CO2 tank valve stem and hand tighten. It is
not necessary to use a wrench.
Tip-over hazard. The pressure
regulator operating pressure is
preset for the maximum load
capacity of the machine. Modifying
or using any other pressure
regulator or compressor in excess
of 600 kPa / 90 psi service could
result in death or serious injury.
Use only Genie approved
replacement parts.
7 Connect the hose and hand control by inserting
the hose plug end into the coupling on the side
of the pressure regulator. Connect the hand
control hose to the valve at the base of the
cylinder assembly.
8 Open the CO2 tank valve slowly by turning the
handle counterclockwise.
Component damage hazard. If the
CO2 tank valve is opened quickly,
the pressure regulator diaphragm
could be damaged.
Platform Raise and Lower
9 Lock all four caster brakes.
1 0 Raise the platform by pressing the up button on
the hand control.
Result: Each tube should extend individually and
smoothly. They should not stick.
1 1 Lower the platform by pressing the down button.
Result: The platform should descend at a
smooth, controlled rate.
1 2 Raise the platform again and then lower it by
opening the manual dump valve on top of the
hand control.
Result: The platform should descend at a
smooth, controlled rate, but more quickly.
Note: Raising and lowering the platform twice,
without a load, lubricates the columns.
Part No. 82297Genie Super Hoist7
Page 10
Workplace Inspection
Do Not Operate Unless:
Fourth Edition • Second PrintingOperator’s Manual
Workplace Inspection
Be aware of and avoid the following hazardous
situations:
·drop-offs or holes
·bumps, floor obstructions or debris
·sloped surfaces
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to use.
4 Inspect the workplace.
Know and understand the workplace
inspection before going on to the next
section.
5 Only use the machine as it was intended.
Fundamentals
The workplace inspection helps the operator
determine if the workplace is suitable for safe
machine operation. It should be performed by the
operator prior to moving the machine to the
workplace.
·unstable or slippery surfaces
·overhead obstructions and high voltage
conductors
·hazardous locations
·inadequate surface support to withstand all load
forces imposed by the machine
·wind and weather conditions
·the presence of unauthorized personnel
·other possible unsafe conditions
It is the operator's responsibility to read and
remember the workplace hazards, then watch for
and avoid them while moving, setting up and
operating the machine.
8Genie Super HoistPart No. 82297
Page 11
Fourth Edition • Second PrintingOperator’s Manual
Operating Instructions
Operating Instructions
This machine is intended for use as a material lift
only.
When new, the machine may be stiff due to tight
seals and packings. The machine will function
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to use.
4 Inspect the workplace.
5 Only use the machine as it was intended.
smoother after use. The machine is heavily
lubricated during manufacture to assure long lasting
and smooth performance. Occasionally, excess oil
may leak out of the quick disconnect plug at the
base of the cylinder assembly.
Take precautionary care to avoid
lubricant spills on finished floors.
Setup
Follow the instructions listed in the Function Tests
section.
Platform Raise and Lower
1 Lock all four caster brakes.
Fundamentals
The Operating Instructions section provides
instructions for each aspect of machine operation.
It is the operator's responsibility to follow all the
safety rules and instructions in the operator's
manual.
Using the machine for anything other than lifting
material is unsafe.
If more than one operator is expected to use a
machine at different times in the same work shift,
each operator is expected to follow all safety rules
and instructions in the operator's manual. That
means every new operator should perform a preoperation inspection, function tests and a workplace
inspection before using the machine.
2 Raise the platform by pressing the up button on
the hand control.
3 Lower the platform by pressing the down button.
Part No. 82297Genie Super Hoist9
Page 12
OPERATING INSTRUCTIONS
Manual Lowering
1 Open the manual dump valve on top of the hand
control.
Storage Instructions
1 Completely lower the platform. Close the CO2
tank valve by turning the handle clockwise.
Remove the platform and CO2 tank. Disconnect
the hose and hand control and coil it on the
clips under the platform.
2 Support the cylinder assembly with one hand.
With the other hand, release the nearest leg
lock. Raise the leg and lock it in the storage
position. Repeat this procedure for the other
three legs.
3 Select a safe storage location that is weather
protected and away from traffic. Preferably,
store the machine standing up on its base to
preserve smooth operation and prolong the life
of the seals.
Fourth Edition • Second PrintingOperator’s Manual
10Genie Super HoistPart No. 82297
Page 13
Fourth Edition • Second PrintingOperator’s Manual
Maintenance Schedule
Maintenance Schedule
DailyInspect and, if necessary, tighten the
following components: fittings, hoses,
fasteners.
Inspect the leg locks to be sure that they
move freely and the springs function
properly through their entire range of
motion.
Inspect the casters and the caster
brakes.
MonthlyVisually inspect the felt wipers. Remove
debris and clean as necessary.
Part No. 82297Genie Super Hoist11
Page 14
Decals
Decal Inspection
Use the pictures on this page to verify that all
decals are legible and in place. Below is a
numerical list with quantities and descriptions.
Height41 in1.04 m
Platform length19 in48 cm
Platform width24 in61 cm
Base width, corner to corner53 in1.35 m
Load capacity300 lbs136 kg
Lifting height12 ft 55/8 in3.8 m
Dimensions for14 x 14 x 391/2 in
storage/transport36 cm x 36 cm x 1 m
Weight64 lbs29 kg
Recommended psi85 psi5.86 bar
Continuous improvement of our products is a Genie
policy. Product specifications are subject to change
without notice or obligation.
Genie Super Hoist 5.6
Height54 in1.37 m
Platform length19 in48 cm
Platform width24 in61 cm
Base width, corner to corner53 in1.35 m
Load capacity250 lbs113 kg
Lifting height18 ft 41/2 in5.6 m
Dimensions for14 x 14 x 391/2 in
storage/transport36 cm x 36 cm x 1 m
Weight69 lbs31 kg
Recommended psi85 psi5.86 bar
Part No. 82297Genie Super Hoist13
Page 16
Genie North America
Phone 425.881.1800
Toll Free USA and Canada
Genie Australia Pty Ltd.
800.536.1800
Fax 425.883.3475
Phone +61 7 3375 1660
Fax +61 7 3375 1002
Genie Scandinavia
Phone +46 31 3409612
Fax +46 31 3409613
Genie France
Phone +33 (0)2 37 26 09 99
Fax +33 (0)2 37 26 09 98
Genie Iberica
Phone +34 93 579 5042
Fax +34 93 579 5059
Genie Germany
Phone +49 (0)4202 88520
Fax +49 (0)4202 8852-20
Genie U.K.
Phone +44 (0)1476 584333
Fax +44 (0)1476 584334
Genie Mexico City
Phone +52 55 5666 5242
Fax +52 55 5666 3241
Genie China
Phone +86 21 53852570
Fax +86 21 53852569
Genie Malaysia
Phone +65 98 480 775
Fax +65 67 533 544
Genie Japan
Phone +81 3 3453 6082
Fax +81 3 3453 6083
Genie Korea
Phone +82 25 587 267
Fax +82 25 583 910
Genie Brasil
Phone +55 11 41 665 755
Fax +55 11 41 665 754
Genie Holland
Phone +31 183 581 102
Fax +31 183 581 566
Distributed By:
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.