GE PSB1000NBB01, PSB1000NWW01, PSB1001NSS01 Installation Guide

Profile Advantium TM 120 Built-ln
I I
Questions? Call800.GE.CARES (800.432.2737)orvisitour Website at:GEAppliances.com
tallati
structi
SpeedCook Ovens
PSB1000 PSB1001
BEFORE YOU BEGIN
and carefullg.
IMPORTANT- Savetheseinstructions
for local inspector's use.
IMPORTANT- Observeallgoverning
codes and ordinances.
Note to Installer- Be sure to leave these instructions with the Consumer.
Note to Consumer - Keep these instructions for future reference.
Skill level -Installation of this appliance requires basic mechanical and electrical skills.
Completion time- 1 hour
Proper installation is the responsibility of the installer,
Product failure due to improper installation is not covered under the Warranty, See Owner's
Manual for warranty information.
IMPORTANT:
Use this oven only for its intended purpose,
Never use the oven for warming or heating a
room, Prolonged use of the oven without proper ventilation can be hazardous,
-&CAUTION:
For personal safetLI, remove house fuse or oven circuit breaker before beginning installation to avoid
severe or fatal shock injurLI.
-_ CAUTION:
For personal safetLI, the mounting surface must be capable of supporting the cabinet load, in addition
to the added weight of the 7S-pound product, plus additional oven loads of up to 50 pounds or a total weight of 125 pounds.
-&CAUTION:
For personal safetg this product cannot be installed in cabinet arrangements such as an island,
a peninsula or below a countertop.
ForaSpanishversionofthis manual, visit our Websiteat GEAppliances.com.
Para consultar una version enespafiol deestemanual deinstrucciones,visite
nuestro sitio deinternet GEAppliances.com.
CONTENTS
Design Information
Models Available ....................................................................2
Product Dimensions and Clearances ..........................2
Tools Required ........................................................................2
Parts Supplied ........................................................................2
Advance Planning ................................................................3
Installation Preparation
Electrical Requirements ....................................................4
Prepare the Opening ......................................................5, 6
Remove the Packaging ......................................................6
Installation Instructions
Step 1, Slide the Oven into the Cutout ........................7
Step 2, Install Bottom Trim ................................................7
Step 3, Install Mounting Screws ......................................8
Step 4, Finalize Installation ................................................8
PIFL59060902 49-40607 02-09 JR
Design Information
MODELS AVAILABLE
Profile Models: PSBIOOOWW - White
PSBIOOOBB- Black PSBIO01SS - Stainless Steel
PRODUCT DIMENSIONS AND CLEARANCES
26-3/4"
TOOLS REQUIRED
#2, Phillips screwdriver
Handheld drill
High-speed drill bit, 1/8" diameter 3/8", slot-head screwdriver
13" _'_
1-1/16"
\
\
\
\
\
I
NOTE: Appearance may vary slightly by model.
]
18-5/8"
PARTSSUPPLIED
6 Brass screws (3 required, 3 extra)
5 Color-matched screws (4 required, 1 extra) Bottom trim
Design Information
ADVANCE PLANNING
These ovens mag be installed directlg into a 27'Lwide oven cabinet.
The front surface of the oven will be nearlg flush with surrounding cabinetrg doors.
This oven can be installed over ang GE single electric built-in oven or a warming drawer or both.
IMPORTANT: Thisoven isnotapproved foruse above another built-inSpeedCook oven,a side-bg-side installationorbelow a countertop.
For personalsafetg,thisoven cannot be installed ina cabinetarrangement such as an islandor peninsula.
The oven must be installed at least 36-3/4" above the floor.
Allow for clearance to adjacent corners, walls, drawers, etc.
Cabinets installed adjacent to wall ovens must have an adhesion spec of at least 194% temperature rating.
The oven must be securelg installed in a cabinet that is firmlg attached to the house structure. Weight on the oven door could cause the oven to tip and result in injurg. Never allow angone to climb, sit, stand or hang
on the oven door.
Installation Preparation
ELECTRICAL REQUIREMENTS
Single Advantium 120 Installation: This product requires a 120-volt, 60 Hz, 15-amp circuit
and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency.
Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating.
The power supply cord and plug should be brought to a separate 15- or 20-ampere branch circuit single grounded receptacle. The outlet box should be located within reach of the 48" power cord.
ELECTRICAL LOCATION
9"
Locateoutlet box in the shaded area
Install a recessed electrical outlet in the back wall of the opening within 6" of either side and at least
9" above the cutout floor.
IMPORTANT: (Please read carefully).
The power cord of this appliance is equipped with
a three-prong (grounding) plug that motes with a standard three-prong grounding wall receptacle
to minimize the possibility of electric shock. The
customer should have the wall receptacle and circuit checked bg o qualified electrician to make sure the receptacle is properlg grounded and has the correct polaritg.
Where o standard two-prong wall receptacle is encountered, it is the personal responsibilitg and obligation of the customer to hove it replaced with a properly grounded three-prong wall receptacle.
Do not, under ang circumstances, cut or remove
the third (ground) prong from the power cord.
DO NOT USE AN EXTENSION CORD.
4
Installation Preparation
PREPARE THE OPENING
The Advantium 120 can be installed in combination with other GE appliances. Always follow each
product's Installation Instructions to complete the installation.
Single Advantium 120 Installation: Order a 27"-wide single oven cobinet or cut the
opening in a wall to the dimensions shown.
23-1/2"
Construct Base ,
Min. 3/8' Plywood
\\ Supported
by2x4
or1 x2
Runnersall FourSides
PREPARE THE OPENING (CONT.}
Installation over a GE Warming Drawer:
27"-- 23-1/2"
.,,_ 25_1/8''_"
17-1/2"
W
9-1/4"
36-3/4"
Min.
NOTE: Additionol cleorances between the cutouts may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct the required interior depth and height. See Warming
Drawer instc_llation instructions for details.
J
I
Construct SolidBottom
Min. 3/8" Plywood
Supported by2x4or
1x 2 Runners all FourSides
2" Min.
Install2x 4 or
__)[ 2x2Runners
orSolidBottom. MustSupport
100Ibs.
Always maintain :36-3/4" minimum height from the floor to the cutout in ang single or combined
installation.
Allow 1-1/4" case trim overlop tit the top and 7/8"
overlop on the bottom and each side of the opening.
Oven overlops will conceal cut edges on all sides
of the opening.
When installed over a single oven or a warming drawer, allow at least 2" between the two openings. This separation will provide clearance for bottom overlap of the Advantium 120 and the other appliance overlaps.
Construct a solid oven floor of 3/8" rain. thick plgwood supported bg 2 x 4 runners on all sides.
The support must be level and rigidlg mounted, flush with the bottom edge of the cutout.