GE Spacemaker PDW1800N, Spacemaker PDW1860NSS, PDW1800NBB - Profile 18-in Dishwasher, Profile PDW1800, Profile PDW1860N Dimensions And Installation Information

Dimensions and Installation Information (in inches)
For answers to your Monogram,® GE Profile™ or GE® appliance questions, visit our website at ge.com or call GE Answer Center® service,
800.626.2000.
PDW1800/60N
GE Profile™ 18" Built-In Dishwasher
Specification Revised 2/09
250218
Listed by Underwriters Laboratories
Electrical Rating
Voltage AC..........................................................120
Hertz....................................................................... 60
Total connected load amperage...............9.0
Calrod® heater watts max......................... 550
For use on adequately wired 120-volt, 15-amp circuit having 2-wire service with a separate ground wire. This appliance must be grounded for safe operation.
Note: Dishwasher must not be installed more than 10 feet from sink for proper drainage. All plumbing and electrical work must be in accordance with local codes.
Installation Information: Before installing, consult installation instructions packed with product for current dimensional data.
As an ENERGY STAR® partner, GE has determined that this product meets the ENERGY STAR
guidelines
for energy efficiency.
18*
22-1/2
Max.
25
32-1/2
to
35**
1-1/2"
90°
34-1/4" Min.
24"
Bottom of tub to floor
7"
Hot Water Line
Electrical Wiring
17-5/8" to 18" Min.
1-1/2"
From back of rear frame to wall
3"
90°
Electrical, drain and water supply line entrances must be confined to shaded areas to avoid interference with components
White (neutral)
Black (line)
Ground
Dishwasher Countertop
2" Minimum
Dishwasher
Door
*Width adjustable from 17-5/8" to 18". **Meets ADA countertop height requirement of 34".
For answers to your Monogram,® GE Profile™ or GE® appliance questions, visit our website at ge.com or call GE Answer Center® service,
800.626.2000.
PDW1800/60N
GE Profile™ 18" Built-In Dishwasher
Specification Revised 2/09
250218
Listed by Underwriters Laboratories
As an ENERGY STAR® partner, GE has determined that this product meets the ENERGY STAR
guidelines
for energy efficiency.
GE Pub. No. 031-30244
Custom Dishwasher Door Panel Template
For answers to your Monogram,® GE Profile™ or GE® appliance questions, visit our website at ge.com or call GE Answer Center® service,
800.626.2000.
Top of Panel
7-11/16"
Trim Around Dotted Line
2-5/32"
(5.5 cm)
(19.5 cm)
Trim Around Dotted Line
Drill 3/32" Pilot Hole 3/32" Deep
Top of Panel
7-11/16"
2-5/32" (5.5 cm)
(19.5 cm)
Drill 3/32" Pilot Hole 3/32" Deep
Drill 3/32" Pilot Hole 3/32" Deep
13/32" (1 cm)
6-1/2"
(16.5 cm)
5-29/32" (15 cm)
Drill 3/32" Pilot Hole 3/32" Deep
13/32" (1 cm)
6-1/2"
(16.5 cm)
5-29/32" (15 cm)
3/4" Thick Custom Panel
Template Instructions for 18"
Top Control Integrated Prole and
Monogram Dishwasher Models
Pub. No. 31-30244 Dwg. No. 206C1559P182 05-08 JR
The custom panel should be sized to your installation situation. See Step 1. For easier
installation, the custom panel and custom handle should be attached before installing the
dishwasher. Use this template to locate mounting screws and spacers on the custom panel.
IMPORTANT
• A custom handle must be installed onto the custom panel. Install the custom handle 4-1/2" max. from the top of the panel.
STEP 2 DRAW CENTERLINE
• Place the custom panel on a surface with the appearance side down.
• Locate the vertical center of the panel at the top.
• Use a carpenter's square to draw a centerline from top to bottom.
STEP 3 ALIGN TEMPLATE TO PANEL
• Trim template on the dotted line along all sides.
• Place the template on the panel aligned with the top edge and the centerline. Use tape to hold in place.
IMPORTANT: If the template is not aligned with the top edge of the panel, the 1/2" minimum gap will not be maintained. This 1/2" minimum gap must be maintained to prevent condensation and damage to the control panel from screw heads.
• Use an awl to mark the screw hole locations indicated on the template. Remove the template.
HEIGHT
Panel height should be 26-25/32" (68 cm).
• The top of the custom panel must be
with the top of the door. The 1/2" minimum gap
between the top of the door and the bottom of the countertop must be maintained.
PARTS INCLUDED: (2) Brackets (4) 1/2" Phillips at-head screws (2) Spacer pads (2) Metal spacers (2) 1" Phillips at-head screws (2) 3/4" Phillips round-head screws
STEP 1 CUSTOM PANEL SIZE REQUIREMENTS
IMPORTANT: To ensure optimum door balance performance, the custom panel must not weigh more than 8 lbs.
WIDTH
Panel width must be 17-1/2" (44.4 cm).
• If the panel width is less than 17-1/2", it will not cover the dishwasher frame.
STEP 7 CHECK DOOR BALANCE
To check the door balance, hold the top of the dishwasher
• Check the door balance by opening and closing the door.
• If the door drops when released, increase the spring tension. If the door rises when released, decrease the spring tension.
• Using a T25 torque driver, adjust in the direction shown. Adjust both sides equally.
STEP 6 INSTALL ASSEMBLED PANEL
• Secure the panel to the door by inserting the top metal spacers and bottom brackets into the matching slots on the dishwasher door and control panel.
• Make sure both metal spacers and both brackets engage the slots.
• Press the panel against the door and push downward until the metal spacers and brackets are fully engaged into the slots. The panel should align evenly with the top and sides.
• Stand the dishwasher upright.
• Open the dishwasher door and remove the 2 plug buttons, one on each side as shown.
• Place the supplied 3/4" Phillips round-head screws inside the plastic sleeve and drive through the inner door and into the custom panel.
• Replace the 2 plug buttons by pressing them
back into the plastic sleeve.
WARNING: Do not overtighten screws. Excessive tightening of the screws could damage door edges.
STEP 5 INSTALL CUSTOM HANDLE
A custom handle must be installed onto the panel before the panel is secured to the dishwasher door.
• The handle should be installed so that it aligns with adjacent drawer handles, or 4-1/2" max. from the top of the panel. Secure the handle in the same manner as the cabinet handles. Screws must be countersunk into the panel.
STEP 4 INSTALL MOUNTING SCREWS AND SPACERS
Note: The custom panel is secured to the dishwasher door with the metal spacers, screws and brackets provided. The metal spacers and brackets will slip into the slots on the dishwasher door and control panel.
• Align the metal spacers over the top pilot holes. Ensure the thick, recessed side is facing up.
• Drive the supplied 1" Phillips screws through the metal spacers and into the panel.
• Align the brackets over the bottom pilot holes. Ensure the curved lip is facing up. If the back surface of the panel is not use the spacer pads provided.
• Drive the 1/2" Phillips screws through the brackets and into the panel.
Countertop
Minimum 1/2" gap for clearance
1/2" minimum
Mark center screw holes
Bracket
Spacer Pad
Spacer
Handle
4 1/2" Max. from top of panel
Custom door panel
Screws must be counter­sunk into panel
Custom panel
Dishwash­er door
Custom panel
PARTS SUPPLIED
(2) Brackets(2) Spacer Pads
(2) Metal spacers
(2) 3/4" Round-head screws
(4) Phillips at-head screws
(2) Phillips at-head screws
Increase
Decrease
Decrease
Increase
Instructions de gabarit pour panneau
sur mesure épais de 19 mm (3/4 po)
pour modèle de lave-vaisselle à réglage
intégré en haut Prole et Monogram
Le panneau de nition doit avoir des dimensions appropriées pour l’installation. Consulter l’étape 1.
Pour faciliter l’installation, le panneau de nition et la poignée de nition doivent être montés avant la mise
en place du lave-vaisselle. Utiliser ce gabarit pour déterminer l’emplacement des vis de montage et
des rondelles sur le panneau de nition.
IMPORTANT
le panneau de nition. Installer la poignée à moins de 11,5 cm (4-1/2 po) du haut du pan ­neau.
ÉTAPE 2 TRAÇAGE DE L’AXE
• Mettre le panneau de sur une surface plate, le côté extérieur vers le bas.
• Mettre le centre vertical du panneau en haut.
• Avec une équerre de menuisier, tracer un axe du haut au bas.
ÉTAPE 4 INSTALLER LES VIS DE MONTAGE ET LES RONDELLES
ÉTAPE 5 INSTALLATION DE LA POIGNÉE DE FINITION
• Mettre le lave-vaisselle debout.
• Ouvrir la porte du lave-vaisselle et visser les vis à tête bombée fournies nº 8 x 1-3/4 po. Visser une vis en haut et une en bas, à travers le panneau interne de la porte et le panneau de
ATTENTION : Il ne faut pas serrer les vis en excès. Un serrage excessif des vis peut endommager les bords de la porte.
• Couper le gabarit suivant le pointillé, sur tous les côtés.
• Mettre le gabarit sur le panneau, aligné sur le bord supérieur et sur l’axe. Le maintenir en place avec du ruban adhésif.
IMPORTANT : Si le gabarit n’est pas aligné à l’extrémité du haut du panneau, vous n’obtenez pas 1/2 po d’espace libre. Vous devez avoir un espace libre de 1/2 po pour empêcher la condensation et éviter d’endommager le panneau de contrôle avec les têtes de vis.
• Avec un pointeau, marquer les emplacements de trous de vis indiqués sur le gabarit. Enlever le gabarit.
HAUTEUR
Le panneau doit avoir entre au moins 30 1/16 po et 30 1/4 po de hauteur.
• Si le panneau a plus de 30 1/4 po de hauteur, il empêche la porte de s’ouvrir complètement.
• Si le panneau a moins de 30 1/16 po de hauteur, il ne couvre pas le châssis de porte du lave-vaisselle.
Numéro de publication 31-30569-1 Nº de plan 206C1559P109 07-04 JR
PIÈCES INCLUSES : (4) Rondelles (4) Vis nº 8 x 5/8 po à tête bombée Phillips, en acier inoxydable (3) Vis à bois nº 8 x 1-3/4 po à tête bombée Phillips, en acier
inoxydable
(2) Ressorts pour service sévère
ÉTAPE 1 TAILLE NÉCESSAIRE POUR LEPANNEAU SUR MESURE
Si l’épaisseur du panneau est inférieure à 19 mm (3/4 po), il faut utiliser des vis plus courtes. Utiliser des vis nº 8 x 1/2 po (pas fournies) pour les panneaux de 13 mm (1/2 po).
• Utiliser une mèche de 2,4 mm (3/32 po) pour percer des trous guides à une
profondeur de 2,4 mm (3/32 po) aux emplacements marqués. Remarque : Le panneau de est maintenu en place sur la porte du lave­vaisselle avec des rondelles et des vis fournies. La rondelle glisse dans les trous allongés dans la porte du lave-vaisselle.
• Visser les vis nº 8 x 5/8 po à tête bombée Phillips, en acier inoxydable(four-
nies) à travers la rondelle et dans le panneau.
• Installer les rondelles et les vis restantes, comme indiqué, aux endroits mar-
qués.
IMPORTANT : Pour que la porte fonctionne bien, le panneau sur mesure ne doit pas peser plus de 6,4 kilos (14 livres).
CONSEIL – Si la porte ne s’ouvre pas facilement ou si elle
tombe trop rapidement, le passage du câble des ressorts. Le câble est maintenu en place par des « épaulements » sur la poulie. que le câble n’a pas glissé sur les épaulements de poulie. IMPORTANT – Régler l’équilibre des deux ressorts pour avoir la même tension des deux côtés, d’éviter un gauchissement excessif de la porte en service.
ÉTAPE 3 ALIGNER LE GABARIT SUR LE PANNEAU
Installer une poignée de sur le panneau avant de monter le panneau sur la porte du lave-vaisselle.
• Il faut aligner la poignée sur les poignées des tiroirs adjacents ou à moins de 115 mm (4-1/2 po) du haut du panneau. Monter la poignée de la même manière que les poignées de l’armoire. Les vis doivent être noyées dans le panneau.
ÉTAPE 6 INSTALLATION DU PANNEAU ASSEMBLÉ
• Pour monter le panneau sur la porte, insérer les vis de montage du haut et du bas, avec les rondelles, dans les trous allongés correspondants.
• que les quatre rondelles s’engagent dans les trous allongés.
• Pousser le panneau contre la porte et l’abaisser jusqu’à ce que les rondelles sont totalement engagées dans les trous al­longés. Le panneau doit être aligné uniformément en haut et sur les côtés.
ÉTAPE 7 INSTALLATION DES RESSORTS DE LA PORTE
Le lave-vaisselle est expédié de l’usine avec un jeu de ressorts d’équilibre temporaires. Il faut utiliser les ressorts pour service sévère fournis et les trous de réglage du câble pour équilibrer la porte après avoir installé le panneau de nition sur le lave-vaisselle.
• Avec le lave-vaisselle sur la palette en bois, fermer et ver­rouiller la porte.
• Enlever et jeter les deux ressorts de la porte.
• Monter les nouveaux ressorts pour service sévère de la porte. Engager l’extrémité avec un crochet court dans la patte de support et celle avec le crochet long dans le câble.
• Ouvrir et fermer la porte.
• Si la porte s’ouvre quand elle est relâchée, augmenter la ten­sion du ressort. Si la porte se ferme quand elle est relâchée, diminuer la tension du ressort.
• Le haut du panneau sur mesure doit le haut de la porte. Il doit y avoir un espace libre d’au moins 1/2 po en­tre le haut de la porte et le bas du revêtement de comptoir.
LARGEUR
Le panneau doit avoir au moins 23 3/4 po de largeur.
• Si le panneau a moins de 23 3/4 po de largeur, il ne couvre pas le châssis de porte du lave-vaisselle.
For Reference Only
Not to Scale
Order GE Pub. No. 031-30244
Call 1-800-626-2000
For a full-size panel template with complete panel installation instructions.
Loading...
+ 1 hidden pages