GE LED Luminaire Installation Guide

GE
Lighting
GE LED Luminaire
(IS Series)
There are three types of xtures: starter (ISS Series),
continuous (ISC Series) and independent (IS1 series)
BEFORE YOU BEGIN
Read these instructions completely and carefully.
Installation Guide
RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all NEC and local codes.
• Use only IEC approved wire for input/output connections. Minimum size 18 AWG (0.75 mm2) or 14 AWG (2.5 mm2) for continuous runs.
RISQUES DE DÉCHARGES ÉLECTRIQUES
• Coupez l’alimentation avant d’’inspecter, installer ou déplacer le luminaire.
• Assurez-vous de correctement mettre à la terre le boîtier d’alimentation électrique.
RISQUES D’INCENDIE
• Respectez tous les codes NEC et codes locaux.
• N’utilisez que des ls approuvés par IEC pour les entrées/sorties de connexion.
Taille minimum 18 AWG ou 14 AWG pour les rangées continues.
Save These Instructions
Use only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.
Tools and Components Required:
• T15 torx screwdriver
Prepare Electrical Wiring
Electrical Requirements
• The LED driver must be supplied with 120-240 VAC, 50/60 Hz and connected to an individual properly grounded branch circuit, protected by a 20 ampere circuit breaker. Use min. 75°C supply conductor.
Grounding Instructions
• The grounding and bonding of the overall system shall be done in accordance with National Electric Code (NEC) Article 600 and local codes.
Components Supplied:
• Luminaire
• 2 Mounting Brackets
• Cable glands for 18-14 AWG (0.75-2.5 mm2) supply input cable/cord connection
Important
• Maximum length of electrical run per table below
Supply
voltage
120V 50m 40m
230V-240V 95m 75m
• Please see technical data sheet for electrical properties to ensure safe installation.
• Under any circumstance, maximum driver current
through connected xtures shall not exceed 15A.
Lumen Code
A B
imagination at work
Mechanical Installation
IS series luminaires come in three versions: Starter units (ISS series), continuous units (ISC series) and independent units (IS1 series).
A continuous electrical run will consist of one starter unit and a number of continuous units up to a maximum current of 15A. When
installing luminaires use clean gloves in order to avoid fouling the reective surface.
Choose suspension method
Carefully unpack unit from its
1 3
packaging. Properly inspect for defects before installing. Wear work gloves to prevent dirt and oil from being transferred to the luminaire.
Clip luminaire to the previously
4 5
installed mounting brackets.
Attach mounting bracket to ceiling
2
support structure either directly or using a GE suspension kit according to the suspension kit instructions (kit number 69075, 69076, 69077 or 94210 supplied separately). Maximum distance between suspension points shall not exceed the length of the luminaire.
Fix the mounting position and secure the suspension by tightening the two screws on both mounting brackets.
Prepare luminaire for installation by loosening the PSU cover screws and removing the cover.
Electrical Connections
AC line
Carefully remove appropriate
1 3
knockout for AC line input wires (inner knockout for 22mm conduit, outer knockout for 28mm conduit. Install supplied cable glands in the
Connect the green (ground), black
2
(line) and white (neutral) wires of the AC line to the similarly colored wires of the power supply unit using the
provided terminal. knockout holes for wire protection and pass supply conduit through the cable glands.
Wiring Diagrams
DALI
Fixture
Line
Neutral
Ground
DALI
DALI
Black
White
Green
Violet/White
Violet
0-10V
Fixture
Neutral
Ground
(0-10V) +
(0-10V) –
Line
Black
White
Green
Violet
Grey
Dimming line
(optional)
Optional dimmer: Install supplied cable glands in the knockout holes for wire protection and pass supply conduit through the cable glands. Connect dimming control wires (grey and violet for 0-10V or violet and violet/white strip for DALI) to the
similarly colored xture wire using
the provided terminal.
Replace power supply cover by
4
sliding over the captive screws and secure by tightening them.
Mechanical Installation for Continuous Runs
Continuous runs must begin with a starter unit which is suspended at both ends. The power supply side end cap from the starter unit must be removed and used to terminate the run.
Previously hung unit
To add a continuous unit to a
1 2 3
continuous run, rst suspend the
new unit per the instructions above. Position the non-power-supply end of the luminaire near the power-supply end of the previously hung luminaire.
New unit
Remove the PSU cover from the previously hung luminaire if present.
Continuous runs must begin with a starter unit. Remove the power supply side end cap from the starter unit and save for Step 5.
Pull out continuous wiring
Pull the continuous wiring out of the luminaire being mounted and slide the bridge of the luminaire down onto the bridge of the
4
already installed luminaire so that the tabs and slots at top and bottom nest into one another. The bridges will engage with a load click when fully mated.
Align tabs with slots
Push down to engage
Connect the power and control
5
connectors of the through wiring harness.
To terminate a mechanical run
6 7
take the end cap from the starter luminaire and clip down onto the last bridge.
Replace the PSU covers and secure using the mounting screws.
Note: When installation is complete, all lead wires and connectors shall be totally enclosed.
Troubleshooting
Symptom Solution
Luminaires will not turn on • Check that the color of the supply side wires match the color of the wires they are connected to.
• Check that the LED driver connector is fully engaged to the LED light engine connector.
Luminaire on through wiring will not turn on
Luminaire to luminaire mating in continuous run is loose
Suspension method won’t engage with luminaire
• Check that the through wiring connector from the previous xture in the linear row is fully
engaged to the malfunctioning luminaire.
• Ensure that both upper and lower connecting features are correctly engaged.
• Ensure that through wires are correctly routed in the wiring notch.
• Check that the suspension method is one of the approved types in the installation instruction.
GE Lighting • 1-888-MY-GE-LED (1-888-69-43-533) • www.gelighting.com
GE Lighting Solutions, LLC is a subsidiary of the General Electric Company. The GE brand, logo, and Lumination are trademarks of the General Electric Company. © 2014 GE Lighting Solutions, LLC. Information provided is subject to change without notice. All values are design or typical values when measured under laboratory conditions.
IND097-010914
Loading...