GE LED 55 CC 1.4A ESRDL 1-10V 220-240 Installation Manual

Page 1 of 6
Imagination at work
LED 55 CC 1.4A ESRDL 1-10V 220-240 Infusion System Power Supply
Power Supply Installation
Tighten the screws (x4) until the CAP goes down all the way and reaches the BASE.
BEFOR YOU BEGIN
Read these instruction completely and carefully
CAP
BASE
CAP
Page 2 of 6
Imagination at work
Power Supply Installation LED 55 CC 1.4A ESRDL 1-10V 220-240
PRIMARY SIDE – CHANNE L #1
OPTION – 1 OPTION – 2
WIRE TABLE
mm2 CABLE
CHANNEL#1 – OPTION - 1 2X0.75mm2 – 2X1mm
2
H05VVH2-F, SALCAVI-LSF
R30268
CHANNEL#1 – OPTION - 2 0.75mm2 H03VV-F
CHANNEL #1
CHANNEL #2
CHANNEL #4
CHANNEL #3
PRI SIDE
TOP VIEW
SEC SIDE