GE DBVH512EF0GG, DBVH512EF0WW, DBVH512EF4WW, DBVH512GF0GG, DBVH512GF0WW Installation Guide

...
nstru ctl Ons w ,x10018
!Insta"ationIStac"Brac"etK'tI
BEFORE YOU BEGIN
Read these instructions completely and
carefully.
IMPORTANT- Savethese
instructions for local electrical inspector's use.
governing codes and ordinances.
Note to Installer - Be sure to leave these instructions with the Consumer.
Note to Consumer - Keep these instructions
for future reference.
Installation must be performed by a
qualified installer.
Proper installation is the responsibility of
the installer.
FOR YOUR SAFETY:
-&WARNING
Electric Shock Hazard. Disconnect power before installing. Failure to do so could result in serious injury or death.
Potential Personal Injury. More than two
people are recommended to lift the dryer
into position because of its weight and size. Failure to do so could result in
personal injury or death.
Avoid Tipping and Rupture of Utility
Services. Dryer must be securely attached to the washer. DO NOT place the washer on top of the dryer. Failure to do so could
result in personal injury/death or property
damage.
Mobile Home or Manufactured Home Installation - Stacking of a gas dryer is not
permitted in a mobile home or manufactured home.
MINIMUM CLEARANCE OTHER THAN ALCOVE OR CLOSET INSTALLATION
Minimum clearance to combustible surfaces
and for air opening are: 0" both sides and 1" rear. Consideration must be given to provide adequate clearance for installation and
service.
ALCOVE OR CLOSET INSTALLATION
If your dryer is approved for installation in an alcove or closet, it will be stated on a label on the dryer back.
The dryer MUST be vented to the outdoors. Refer to dryer Installation Instructions for
details.
Minimum clearance between dryer cabinet
and adjacent walls or other surfaces is: 0" either side
3" front and rear
Minimum vertical space from floor to
overhead cabinets, ceiling, etc. is 43"
without pedestal, 55" with pedestal and
84" stacked. Closet doors must be Iouvered or otherwise
ventilated and must contain a minimum of 60 square inches of open area equally
distributed. If the closet contains both a
washer and a dryer, doors must contain a
minimum of 120 square inches of open area equally distributed.
175D1807P508
49-90240
05-05 JR
mnstaliation mnstructions
KIT CONTENTS
Right Hand Bracket
Left Hand Bracket
4 Rubber Pads
4#12 x 1" Screws
4 #8 x 1/2" Screws
TOOLS YOU WILL NEED
[TI REMOVE THE DRYER
LEVEUNG LEGS
[] Carefully tay the dryer on its side. Use
the packing material so you don't scratch the finish on the dryer.
[] Use an open=end wrench or piiers to
remove the dryer leveling legs.
Phillips Screwdriver
Open Ended Wrench
Pliers
Gloves
Level
INSTALLATION PREPARATION
Remove the packaging. Flatten the product carton to use as a pad
to lay the dryer down on its side. Continue using the carton to protect the finished floor in
front of the installation location.
_-I INSTALL RUBBER PADS TO
DRYER BASE
Locate the 4 rubber pads in the parts package. Remove the adhesive backing and firmly place over on the bracket where you removed the levelling legs.
F
2
Loading...
+ 2 hidden pages