SYSTEM COMPAX 40E, CE Marked with MPH 50/65/80
(including XT, RS 85 and Tomo−Link
Direction 2154260−100, Revision 9
Copyright 1999 By General Electric Co.
All Rights Reserved
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
THIS PAGE INTENTIONALLY LEFT BLANK.
ii
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
− THIS SERVICE MANUAL IS AVAILABLE IN ENGLISH ONLY.
WARNING
AVERTISSEMENT
− IF A CUSTOMER’S SERVICE PROVIDER REQUIRES A LANGUAGE OTHER THAN
ENGLISH, IT IS THE CUSTOMER’S RESPONSIBILITY TO PROVIDE
TRANSLATION SERVICES.
− DO NOT ATTEMPT TO SERVICE THE EQUIPMENT UNLESS THIS SERVICE
MANUAL HAS BEEN CONSULTED AND IS UNDERSTOOD.
− FAILURE TO HEED THIS WARNING MAY RESULT IN INJURY TO THE SERVICE
PROVIDER, OPERATOR OR PATIENT FROM ELECTRIC SHOCK, MECHANICAL
OR OTHER HAZARDS.
− CE MANUEL DE MAINTENANCE N’EST DISPONIBLE QU’EN ANGLAIS.
− SI LE TECHNICIEN DU CLIENT A BESOIN DE CE MANUEL DANS UNE AUTRE
LANGUE QUE L’ANGLAIS, C’EST AU CLIENT QU’IL INCOMBE DE LE FAIRE
TRADUIRE.
− NE PAS TENTER D’INTERVENTION SUR LES ÉQUIPEMENTS TANT QUE LE
MANUEL SERVICE N’A PAS ÉTÉ CONSULTÉ ET COMPRIS.
− LE NON-RESPECT DE CET AVERTISSEMENT PEUT ENTRAÎNER CHEZ LE
TECHNICIEN, L’OPÉRATEUR OU LE PATIENT DES BLESSURES DUES À DES
DANGERS ÉLECTRIQUES, MÉCANIQUES OU AUTRES.
WARNUNG
AVISO
− DIESES KUNDENDIENST−HANDBUCH EXISTIERT NUR IN ENGLISCHER
SPRACHE.
− FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENÖTIGT,
IST ES AUFGABE DES KUNDEN FÜR EINE ENTSPRECHENDE ÜBERSETZUNG
ZU SORGEN.
− VERSUCHEN SIE NICHT, DAS GERÄT ZU REPARIEREN, BEVOR DIESES
KUNDENDIENST−HANDBUCH ZU RATE GEZOGEN UND VERSTANDEN WURDE.
− WIRD DIESE WARNUNG NICHT BEACHTET, SO KANN ES ZU VERLETZUNGEN
DES KUNDENDIENSTTECHNIKERS, DES BEDIENERS ODER DES PATIENTEN
DURCH ELEKTRISCHE SCHLÄGE, MECHANISCHE ODER SONSTIGE
GEFAHREN KOMMEN.
− ESTE MANUAL DE SERVICIO SÓLO EXISTE EN INGLÉS.
− SI ALGÚN PROVEEDOR DE SERVICIOS AJENO A GEMS SOLICITA UN IDIOMA
QUE NO SEA EL INGLÉS, ES RESPONSABILIDAD DEL CLIENTE OFRECER UN
SERVICIO DE TRADUCCIÓN.
− NO SE DEBERÁ DAR SERVICIO TÉCNICO AL EQUIPO, SIN HABER
CONSULTADO Y COMPRENDIDO ESTE MANUAL DE SERVICIO.
− LA NO OBSERVANCIA DEL PRESENTE AVISO PUEDE DAR LUGAR A QUE EL
PROVEEDOR DE SERVICIOS, EL OPERADOR O EL PACIENTE SUFRAN
LESIONES PROVOCADAS POR CAUSAS ELÉCTRICAS, MECÁNICAS O DE
OTRA NATURALEZA.
iii
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
− ESTE MANUAL DE ASSISTÊNCIA TÉCNICA SÓ SE ENCONTRA DISPONÍVEL
ATENÇÃO
AVVERTENZA
EM INGLÊS.
− SE QUALQUER OUTRO SERVIÇO DE ASSISTÊNCIA TÉCNICA, QUE NÃO A
GEMS, SOLICITAR ESTES MANUAIS NOUTRO IDIOMA, É DA
RESPONSABILIDADE DO CLIENTE FORNECER OS SERVIÇOS DE TRADUÇÃO.
− NÃO TENTE REPARAR O EQUIPAMENTO SEM TER CONSULTADO E
COMPREENDIDO ESTE MANUAL DE ASSISTÊNCIA TÉCNICA.
− O NÃO CUMPRIMENTO DESTE AVISO PODE POR EM PERIGO A SEGURANÇA
DO TÉCNICO, OPERADOR OU PACIENTE DEVIDO A‘ CHOQUES ELÉTRICOS,
MECÂNICOS OU OUTROS.
− IL PRESENTE MANUALE DI MANUTENZIONE È DISPONIBILE SOLTANTO IN
INGLESE.
− SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL
MANUALE IN UNA LINGUA DIVERSA, IL CLIENTE È TENUTO A PROVVEDERE
DIRETTAMENTE ALLA TRADUZIONE.
− SI PROCEDA ALLA MANUTENZIONE DELL’APPARECCHIATURA SOLO DOPO
AVER CONSULTATO IL PRESENTE MANUALE ED AVERNE COMPRESO IL
CONTENUTO.
− NON TENERE CONTO DELLA PRESENTE AVVERTENZA POTREBBE FAR
COMPIERE OPERAZIONI DA CUI DERIVINO LESIONI ALL’ADDETTO ALLA
MANUTENZIONE, ALL’UTILIZZATORE ED AL PAZIENTE PER FOLGORAZIONE
ELETTRICA, PER URTI MECCANICI OD ALTRI RISCHI.
iv
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
IMPORTANT! . . . X-RAY PROTECTION
X-ray equipment if not properly used may cause injury. Accordingly, the instructions herein contained
should be thoroughly read and understood by everyone who will use the equipment before you attempt to
place this equipment in operation. The General Electric Company, Medical Systems Group, will be glad to
assist and cooperate in placing this equipment in use.
Although this apparatus incorporates a high degree of protection against x-radiation other than the useful beam, no
practical design of equipment can provide complete protection. Nor can any practical design compel the operator to
take adequate precautions to prevent the possibility of any persons carelessly exposing themselves or others to
radiation.
It is important that everyone having anything to do with x-radiation be properly trained and fully acquainted with the
recommendations of the National Council on Radiation Protection and Measurements as published in NCRP Reports
available from NCRP Publications, 7910 Woodmont Avenue, Room 1016, Bethesda, Maryland 20814, and of the
International Commission on Radiation Protection, and take adequate steps to protect against injury.
The equipment is sold with the understanding that the General Electric Company, Medical Systems Group, its agents,
and representatives have no responsibility for injury or damage which may result from improper use of the equipment.
Various protective material and devices are available. It is urged that such materials or devices be used.
CAUTION: United States Federal law restricts this device to use by or on the order of a physician.
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT
All electrical installations that are preliminary to positioning of the equipment at the site prepared for the equipment shall be
performed by licensed electrical contractors. In addition, electrical feeds into the Power Distribution Unit shall be performed
by licensed electrical contractors. Other connections between pieces of electrical equipment, calibrations, and testing shall
be performed by qualified GE Medical personnel. The products involved (and the accompanying electrical installations) are
highly sophisticated, and special engineering competence is required. In performing all electrical work on these products,
GE will use its own specially trained field engineers. All of GE’s electrical work on these products will comply with the
requirements of the applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers, personnel of third-party
service companies with equivalent training, or licensed electricians) to perform electrical servicing on the equipment.
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent, have notation “damage in
shipment” written on all copies of the freight or express bill before delivery is accepted or “signed for” by a General
Electric representative or a hospital receiving agent. Whether noted or concealed, damage MUST be reported to the
carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held
for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested
within this 14 day period.
Call Traffic and Transportation, Milwaukee, WI (414) 827−3468 / 8*285−3468 immediately after damage is found. At
this time be ready to supply name of carrier, delivery date, consignee name, freight or express bill number, item
damaged and extent of damage.
Complete instructions regarding claim procedure are found in Section “S” of the Policy & Procedure Bulletins.
6/17/94
v
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
THIS PAGE INTENTIONALLY LEFT BLANK.
vi
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
REVISION HISTORY
REVDATEREASON FOR CHANGE
0May. 10, 1996Initial release.
1Oct. 16, 1996To add job Card IST 002
2Feb. 26, 1997To add RS 85 Tube Stand and Tomo−Link configurations
3August 7, 1997MIS Map, MIS Chart Update
4December 7, 1997Updated (BUCge 14603, 29344, 29457, 31763)
5October, 1998Updated with 115/24OV setting when used with MPH (Chapter 2)
6November, 1998New reference number for OM Compax 40E, SG60 and SG100
Medys Bucky instead Liebel Bucky
7June 1999Illustrations 7−2, 7−5 and 7−8 updated (ground plug layout)
8July 2003Added note about installing local language rating plate over English version.
9November 2006To resolve PSR 13077161: added a “Warning” in Card IST 001 to use Loctite
Threadlocker, strength 242 or 243 when installing collimators to help prevent
the screws from backing out over time.
To add “Collimator PM” and “Collimator Installation” procedures to Chapter 6.
vii
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
THIS PAGE INTENTIONALLY LEFT BLANK.
viii
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
Direction 2137352−100
Direction 2137352−101
Direction 2137352−106
Direction 2137352−108
Direction 2137352−111
Direction 2137352−127
Eng
Fre
Spa
Ger
Ita
Por
ION CHAMBER
SMIon Chamber ( UL − 3 Fields )826 921 P285EngX
PROGRAM−X Option
OMOPERATING MANUAL
PROGRAM−X
Direction 2103514−100
Direction 2103514−101
Direction 2103514−106
Direction 2103514−108
Direction 2103514−111
Direction 2103514−127
Eng
Fre
Spa
Ger
Ita
Por
X
X
2
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Type
DESCRIPTION
Ref. nr. or DirectionLanguageFurnishedAvailable
PRINT−X Option
OMOPERATING MANUAL
PRINT−X
Direction 2107167−100
Direction 2107167−101
Direction 2107167−106
Direction 2107167−108
Direction 2107167−111
Direction 2107167−127
Eng
Fre
Spa
Ger
Ita
Por
RAFL−S
SMULTRANET SA & RAFL−S (Collimator Con-
trol)
SERVICE MANUAL
DIR. Y00W20L.04EngX
BUCKY
SIBUCKY SERVICE INSTRUCTIONSDIR. 248950EngX
COLLIMATOR
OMULTRANET SM CE marking
Operating Manual
SMULTRANET SMDIR Y00W21L.04EngX
Direction 2144901−100
Direction 2144901−101
Direction 2144901−106
Direction 2144901−108
Direction 2144901−111
Direction 2144901−127
Eng
Fre
Spa
Ger
Ita
Por
X
X
OMULTRANET SA CE marking
Operating Manual
SMULTRANET SADIR Y00W23L.04EngX
Direction 2144903−100
Direction 2144903−101
Direction 2144903−106
Direction 2144903−108
Direction 2144903−111
Direction 2144903−127
Eng
Fre
Spa
Ger
Ita
Por
WALL BUCKY
OMSG 60 VERTICAL BUCKY STAND CE
Operating Manual
pimSG 60 VERTICAL BUCKY STAND CE
Pre−Installation Manual
SMSG 60 VERTICAL BUCKY STAND CE
Service Manual
OMSG 100 VERTICAL BUCKY STAND CE
Operating Manual
Direction 2224051−148Eng/Fre/Spa
Ger/Ita/Por
Direction 2150301−100EngX
Direction 2150293−100EngX
Direction 2226754−148Eng/Fre/Spa
Ger/Ita/Por
X
X
X
3
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Type
pimSG 100 VERTICAL BUCKY STAND CE
Pre−Installation Manual
SMSG 100 VERTICAL BUCKY STAND CE
Service Manual
DESCRIPTION
X−RAY TUBE
TPMaxiray 100 X−RAY TUBE
Technical Publications
TPMaxiray 100 X−RAY TUBE
Technical Publications
XT SUSPENSION
OMX−RAY TUBE SUSPENSION
OPERATING MANUAL
SMX−RAY TUBE SUSPENSION
SERVICE MANUAL
pimX−RAY TUBE SUSPENSION
Pre−Installation MANUAL
RS 85 TUBE STAND
OMRS 85 CE Marked
Operating Manual
Ref. nr. or DirectionLanguageFurnishedAvailable
Direction 2150305−100EngX
Direction 2150297−100EngX
Direction 46−014427EngX
Direction 46−013804EngX
DIR 2116790−100EngX
DIR 2118733−100EngX
DIR 46019618EngX
OngoingEngX
ISMounting Instructions RS 85 Tube Stand CEDirection 0327 7223EngX
SMRS 85 Interface Package for Compax 40E CE
Marked Systems
Service Manual
PIM RS 85 Tube Stand
Pre−Installation Manual
OIOperating Instructions RS 85 Tube Stand CEDirection 0327 7324
Direction 2165897−100EngX
Direction 2172805−100EngX
Direction 0327 7341
Direction 0327 7361
Direction 0327 7303
Direction 0327 7351
Direction 0327 7371
Eng
Fre
Spa
Ger
Ita
Por
TOMO−LINK
OMTomo−Link
Operating Manual
SMTomo−Link
Service Manual
Direction 2122884−100
Direction 2122884−101
Direction 2122884−106
Direction 2122884−108
Direction 2122884−111
Direction 2122884−127
Direction 2133821−100EngX
Eng
Fre
Spa
Ger
Ita
Por
X
X
X
X
X
X
X
4
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Type
SMTomo−Link SchematicsDirection 2132473−100EngX
SMTomo−Link Upgrade Assembly for CE Marked
Compax 40E Tables
Installation Guide
DESCRIPTION
Ref. nr. or DirectionLanguageFurnishedAvailable
Direction 2182386−100EngX
5
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
1-3Manual System Composition
SYSTEM COMPAX 40E (Manual) with MPH 50/65/80
− COMPAX 40E
CLASSICAL RAD TABLE with Anticollision Kit
Core
− MPH 50/65/80
− High Speed Starter
− High Impedance Adaptation
Table Bucky with Grid & Ion Chamber
with AEC
To change mode
Optional
Features
− Power Supply:
XT SUSPENSION Inboard or Outboard with:
− HV cables + Stator and Collimator cables
− Manual Ultranet SM Collimator
− Maxiray 100 Tube
Tomo−Link
− Adapting kit for 40E
380Vac....480Vac (+/− 10%)
RST+GND
50/60 Hz
RS 85 TUBE STAND: with:
− Manual Collimator Ultranet SM
− Maxiray 100 Tube
SG 60/100 Vertical Bucky Stand
Right or Left hand
Grid & Ion Chamber
END
6
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
1-4Automatic System Composition
SYSTEM COMPAX 40E (Auto) with MPH 50/65/80
− COMPAX 40E
CLASSICAL RAD TABLE with Anticollision Kit
Core
− MPH 50/65/80
− High Speed Starter
− High Impedance Adaptation
Table Bucky with Grid & Ion Chamber
with AEC
To change mode
Optional
Features
− Power Supply:
XT SUSPENSION Inboard or Outboard with:
− HV cables + Stator and Collimator cables
− Auto Ultranet SA Collimator
− Maxiray 100 Tube
− RAFL−S Collimator Control
Tomo−Link
− Adapting kit for 40E
380Vac....480Vac (+/− 10%)
RST+GND
50/60 Hz
RS 85 TUBE STAND: with:
− Auto Collimator Ultranet SA
− Maxiray 100 Tube
− RAFL−S Collimator Control
SG 60/100 Vertical Bucky Stand
Right or Left hand
Grid & Ion Chamber
END
7
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
THIS PAGE INTENTIONALLY LEFT BLANK.
8
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
CHAPTER 2 − INSTALLATION
SECTION 1
OVERVIEW
1-1Foreword
teHLA (High Level Assembly) Program: There are two different versions of equipment shipped to the
customer, a non HLA or an HLA version.
COMPAX 40E SYSTEMS are fully assembled and calibrated at the factory (*) before shipment. Only
Tables purchased as add−ons to existing tables are non−HLA.
The aim of this factory integration, or High Level Assembly Program, is to improve the general quality of
the installation procedure on site while decreasing the installation time.
Program results:
−Increased customer satisfaction by reducing the equipment installation time and an increased
reliability and performance from its first use.
−Facilitate the technician’s work:
>by relieving him of time−consuming, tricky and repetitive jobs.
>by involving technicians in this new global process which consists of reducing installation time
and the global quality improvement of our equipment.
This reduces work load and warranty cost.
The Installation Steering Guide which follows is conceived to take maximum advantage of this High
Level Assembly program.
To avoid any duplication of information given in other documents, this manual makes a number of cross
references to Service or Installation Manuals specific to the various components that make up the system.
Any remarks improving the contents of this document would be appreciated.
(*)COMPAX 40E Systems for the US are factory checked with a XT “tool” since the suspension
is purchased locally.
9
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
1-2Unpacking
1-2-1Receipt of Equipment
HANDLING PACKED SUB−ASSEMBLIES
Prior to installation, store the equipment in its original packing, and handle it with care.
Do not drop, throw or stamp packages containing equipment or parts of it.
1-2-2Inventory
Depending on the equipment ordered, check the number of packages delivered to the installation site.
The lists of packages hereafter do not include the optional components.
Crate ContentsDimensionsGross Weight
kg lb
N° 1
Compax 40E CE Table base including:
230x130x31350770
− Medys Bucky
− BVM Ion Chamber
− Telescopic Covers
− Compax 40E Documentation
− System Inspection Report
− System Cables
− Packing List
N° 2
Compax 40E CE Table Top
− Sensing Size Tray
150x94x10375165
10
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
CrateContentsDimensions
N° 3
MPH Cabinet including:
215x100x47280616
− I/F Room
− RAD Option
− HV Tank
− RAFL−S Collimator Control (optional)
− System cables
− C40E/MPH/XT/RS 85/SG SSM
(System Service Manual)
− Inspection Report
N° 4
MPH Console including:
72x120x6250110
− Program−X
− Hand Switch
− MPH Generator Documentation
− Packing List
N° 5
X−Ray Tube (Maxiray 100)
50x84x6046100
− X−ray Tube Unit
− Documentation
Gross Weight
kg lb
N° 6
N° 7
N° 8
GEMS−AM
delivered
systems
only
Ultranet SA Collimator or Ultranet SM Collimator
− Collimator Head
− Documentation
− Tools
SG60 or SG100 Vertical Bucky Stand including:
− Medys Bucky
− BVM Ion Chamber
− Size Sensing Tray
− SG60 or SG100 Documentation
− Packing List
− System cables
Tomo−Link
NOTE: In GEMS−AM delivered systems, the XT suspension
is shipped separately
47x39x563066
230x87x86288633
109x82x8898216
11
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
CrateContentsDimensions
N° 8
GEMS−E
and
GEMS−A
delivered
systems
only
N° 9
GEMS−E
and
GEMS−A
delivered
systems
only
N° 10
GEMS−E
and
GEMS−A
delivered
systems
only
XT Suspension including:
− Covers and Accessories
− Documentation
NOTE: In GEMS−AM delivered systems, the XT suspension
is shipped separately
XT Suspension Bridge
NOTE: In GEMS−AM delivered systems, the XT suspension
is shipped separately
Inboard Concealment 60’ Cables for MPH Generator
including: TBC
− HV Cables
− Stator Cable
− Suspension Cables
NOTE: In GEMS−AM delivered systems, the XT suspension
106x90x152276607
318x82x48140308
214x30x61109240
is shipped separately
N° 11
GEMS−E
and
GEMS−A
delivered
systems
only
Stationary Rails
NOTE: In GEMS−AM delivered systems, the XT suspension
is shipped separately
476x18x1248100
Gross Weight
kg lb
N° 12
GEMS−E
and
GEMS−A
delivered
systems
only
Tomo−Link
NOTE: In GEMS−AM delivered systems, the XT suspension
is shipped separately
109x82x8898216
12
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Crates N° 1 thru N° 7 are the same for both XT suspension and RS 85 Tube Stand Systems
CrateContentsDimensions
N° 8
RS 85 Tube Stand including:
320x66x56190396
Gross Weight
kg lb
− Documentation
RS 85 Interface Package for Compax 40E System including:
− Set of System cables
− Documentation
N° 9
Accessories47x39x563063
Nº 10Print−X (Option)
− Pedestal box
− Documentation
380 x 820 x 3502051
13
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
1-2-3Unpacking
Damage Due to Transport
On delivery of the equipment, all packages must be checked to make sure that they have not been
damaged during transport.
If damage is observed, notify the transport service and the factory transport insurance service
immediately.
The above also applies for non apparent damage due to transport discovered when unpacking the
material or during installation, WITHIN 14 DAYS MAXIMUM AFTER DELIVERY.
Generally, a transport service will not pay a bill for non−apparent damage unless an expert’s report has
been requested within 14 days of delivery.
If damage is discovered, contact the concerned services immediately, specifying the type of apparatus,
the serial number and the order number if possible, as well as a description of the damage.
Unpacking and Inspection
Tools required for unpacking:
−a tool for removing nails, i.e. claw−hammer.
−a crowbar (minimum length 600 mm).
−a dolly for lifting and transporting the table base and SFD−fork, etc...
The components are wrapped in protective material and immobilized in the transport boxes. Each box is
numbered.
When unpacking, first find the packing list and check that all items are present. Check also that there is
no damage to the components received.
In case of missing parts, file a claim immediately mentioning the serial number of the unit as well as all
the shipping data.
Do not discard packing materials, such as envelopes or boxes, until all parts are accounted for.
−Do not place equipment cabinets in areas that are damp, poorly ventilated, too far from the console,
or on another floor.
−Avoid poor floor anchoring.
−Ensure that the screws and washers of each cover are inside plastic bags stuck on the inside of the
cover.
14
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
1-3Installation Steering Guide
Note: Read the following paragraphs carefully before continuing with this Steering Guide.
•Pre−installation:Pre−installation work is required to prepare the room for installing the
equipment. Check that this work is complete, if not, complete
pre−installation work now.
•Inspection Report:Some of the Steering Guide steps are factory performed. Refer to Inspection
Report Dir. 2167647 TDR, 2172166 TDR or 2179651 TDR(supplied with the
system) to know exactly which steps have already been performed.
•Steering Guide:Some steps of the Steering Guide refer to other Service Manual chapters.
When each task is performed, return to the Steering Guide and proceed with
the next step.
• Clamping:Do not forget to clamp the system cables for EMC compliance. Refer
to Job Card IST 005.
•Pinning: To facilitate critical realignment on−site, several sub−assemblies are
pre−drilled and pinned or marked during factory integration. Refer to Job
Cards IST001, IST002, IST003 and IST 004 for installation procedures
The Undertable configuration comes with several system cables
pre−installed in the Table Rolling frame. The remaining system cables are
pre−installed in the Tubestand assy. Take care not to damage these cables.
Step
A1
A2
Data Base Backup:Performed by Manufacturing on Xamine Calibration Diskette.
Mark each box when task is done
DescriptionDone
Supporting Documents
START
See PRE−INSTALLATION MANUALS
and LOCAL LAYOUT DATA Compax 40E CE, PIM
CHECK
Pre−installation Requirements
are met
1 person
1 Hour
Dir. 2150306−100
Vertical Bucky Stand CE, PIM Dir 2150305−100 (SG100),
Dir 2150301−100 (SG60)
MPH50/65/80, PIM Dir 2133000−100
XT CE, PIM Dir 46−019618
RS 85 CE, PIM Dir 2172805−100
UNPACKING
Collect the Product Locator cards
in sequential order
Localize Installation Flowchart
See section 1-2-3 of this manual.
Refer to Installation Flowchart for typical
main task durations
2 people
Continues on next page
4 Hours
15
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Mark each box when done
StepDescriptionDone
From previous page
No
Pilot
System
Yes/No
Yes
FEEDBACK FORMS
A3
PGS 017 (Appendix 2)
1 Person
1 Hour
Supporting Documents
MANDATORY: Fill out this Pilot
Feedback Form in English
throughout the System installation
process.
This General Service Procedure PG017 is
available for GEMSE at local GE offices
PHYSICAL INSTALLATION OF SYSTEM COMPONENTS
XT INSTALLATION
Without XT
A4
XT Ceiling Suspension
Horizontal SID Sensors
2 people
Continues on next page
XT
with/without
With XT
INSTALLATION
If present, the ceiling suspension must be
installed first: carefully follow instructions
given in XT SM, Dir 2118733−100;
Chapter 3 or 4 (Do not install covers now)
16
System Service Manual − SYSTEM COMPAX 40E, CE Marked
Í
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Mark each box when done
StepDescriptionDone
From previous page
INSTALLATION
A5
X−Ray Tube
Collimator Head (SA/SM)
2 people
A4 − A5=16 Hours
Without
Tomo−Link
Supporting Documents
Refer to Inspection Report 2179651 TDR
or 2167647 TDR, sections 2.1 and 3.1
CAUTION: X−Ray Tube and Collimator
are factory aligned and assembled during
HLA.
The mounting ring should be not be
adjusted during installation .
See Job Card IST001 of this manual for
X−Ray Tube and Collimator installation
and levelling.
A6
with/without
With
INSTALLATION
Drive Unit
Yoke
Fulcrum Arm Support (Wall)
Operator Control Console
2 People8 Hrs
Continues on next page
Refer to Inspection Report 2179651 TDR,
section 5.1
Refer to Tomo−Link SM 2133821−100
sections 1,2,5
17
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Step
DescriptionDone
From previous page
RS 85 INSTALLATION
without
RS 85
with/without
with
INSTALLATION
A7
Column Cables Wall Box
Tube Stand Rail
Column With Carriage
Tube Support Arm
Counterweights
Supporting Documents
If present, RS 85 Tube Stand must be
installed first. Follow instructions given in
RS 85 PIM, Dir 2172805−100, Chapter 2.4
Refer to Inspection Report 2172166 TDR,
sections 1.1 and 1.2
See SM− RS 85 Dir. 0327 7223
Mounting Instructions Chapter 1 Section
1.6.1 (Overall dimensions) and:
Chapter 2, Section 2.3 (Adjust floor rails)
Chapter 2, Section 2.4
Chapter 2 sections 2.5 thru2.6
A8
2 People
INSTALLATION
X−ray Tube with Adapter
Collimator Assembly
HV Cable Routing
H
2 People
Continues on next page
XXHrs
Refer to Inspection Report 2172166 TDR,
sections 3.1 and 2.1
See SM− RS 85 Dir. 0327 7223
Installation & Service Instructions
CAUTION: X−Ray Tube and Collimator are
factory aligned and assembled during HLA.
The mounting ring should be not be
adjusted during installation .
See Job Card IST003 of this manual
HANDLE with CARE (by the support only).
18
System Service Manual − SYSTEM COMPAX 40E, CE Marked
GE HEALTHCAREwith MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
REV 9DIRECTION 2154260−100
Mark each box when done
Step
A9
A 10
DescriptionDone
From previous page
INSTALLATION
Counterbalancing & Leveling
1 Person
CONNECTIONS
Collimator cable
Lock Cable
Column Cable concealment
1 Person
A7 − A10= 8 Hours
Supporting Documents
See RS 85 Mounting Instructions, SM Dir.
0327 7223. Chapter 1, Section 1.7, Chapter
2 section 2.9 and Chapter 3 sections 3.1
thru 3.3 and 3.5.
REMARK: Most of these cables are already
factory connected.
See RS 85 Interface Kit for Compax 40E CE;
SM Dir.2165897−100, Chapter 1 Installation,
Chapter 2 MIS MAP and Chapter 3 MIS
CHART
See Job Card IST 005 for cable clamping
See MIS MAPS, Chapter 5 of this manual, and
MIS CHART in section 1-4-3 this chapter.
MIS No. 27304
See Job Card IST003 for Cable concealment
A 11
A12
COMPAX 40E TABLE INSTALLATION
INSTALLATION
Table Base Installation and leveling
Tabletop Installation
2 People
ALIGNMENT
Table Base Longitudinal Axis Alignment with:
XT Longitudinal Rails
(or) RS 85 Longitudinal Rails
2 People
Continues on next page
A11 − A12 = 4 Hours
Refer to Inspection Report 2179651 TDR
or 2167647 TDR sections 4.1 and 4.3
or
Inspection Report 2172166 TDR
sections 4.1 and 4.8
See SM COMPAX 40E CE, Dir. 2150299−100,
Chapter 1, Section 3.
NOTE: Precise alignment is extremely
important for Tomographic Performance.
See SM COMPAX 40E CE, Dir. 2150299−100,
Chapter 1, Section 3.2
19
Loading...
+ 109 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.