FSR FL-FRK-605P User Manual

8.
ROUTE CONDUITS AS REQUIRED TO FLOOR BOX.
FL-FRK-605P INSTALLATION INSTRUCTIONS FOR CORRUGATED OR FORMED DECK
FSR
NOTE: READ FLOOR BOX INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION.
1.
PRIOR TO CUTTING THE 17-1/4" x 20" OPENING IN THE DECK SURFACE, REFER TO CUSTOMER SPECIFICATIONS FOR ORIENTATION OF FLOOR BOX. ORIENTATION OF OPENING WILL BE BASED ON ORIENTATION OF PAN (SEE LABEL IN PAN BOTTOM).
NOTE: CONSULT STRUCTURAL ENGINEER BEFORE CUTTING
DECKING. ADD ADDITIONAL SUPPORTS AS REQUIRED PER ENGINEERING INSTRUCTIONS.
17-1/4" x 20"
OPENING
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
17-1/4" x 20"
OPENING
FORMED DECKSTEEL CORRUGATED DECK
9.
PULL WIRES AND CABLES TO BOX AS NECESSARY (CONFIGURING OF GANG MOUNTING BRACKETS MAY BE REQUIRED - REFER TO FLOOR BOX INSTALLATION INSTRUCTIONS). TERMINATE WIRES AND CABLES TO ELECTRONIC COMPONENTS, AND INSTALL ELECTRONIC COMPONENTS ONTO GANG MOUNTING BRACKETS. REINSTALL TEMPORARY COVER IF FINISHED COVER IS TO BE INSTALLED AT A LATER DATE.
INSTALLED ELECTRONIC COMPONENT
GANG
MOUNTING
BRACKET
NOTE: FOR CORRUGATED DECK PAN MUST BE CENTERED ON
PAN CENTER LINE
2.
INSTALL PAN IN CUT-OUT AND SECURE TO DECKING WITH HARDWARE (BY OTHERS) OR WELDING.
BEND DOWN TABS AS NEEDED TO SECURE PAN TO DECK
PEAK OR VALLEY.
20"
PAN CENTER LINE
BEND IN MIDDLE, WIRE
DOWN THRU CUT-OUT
PAN CENTER LINE
WIRE - 13"-14" LONG,
HOLE IN FORM
CUT-OUT
HOLE
20"17-1/4"17-1/4"
DO NOT SECURE
FLANGES TO FORM
FROM TOP OF FORM
NAIL/SCREW INTO FORM FROM BELOW, IN LINE WITH EMBOSS
TWIST WIRE
AROUND
NAIL/SCREW.
CUT WIRE
FOR EASY
REMOVAL
OF FORM
STEEL CORRUGATED DECK FORMED DECK
43024 LIT1429B
UNDERSIDE VIEW
3.
REMOVE AND RETAIN TEMPORARY COVER AND SCREWS.
(8) #6-32 FLAT
HEAD SCREWS
TEMPORARY
COVER
4.
REMOVE (4) 1-1/2" KNOCKOUTS LOCATED ON BOTTOM OF FLOOR BOX. ALL OTHER KNOCKOUTS IN THE BOX
ARE NOT TO BE USED OR REMOVED.
6.
INSTALL FLOOR BOX INTO PAN. LEVEL BOX TO PROPER HEIGHT WITH LEVELING BOLTS. ANCHOR BOX USING WIRE (SUPPLIED BY OTHERS) TO PREVENT BOX FROM FLOATING DURING POUR.
LEVELING BOLT
CONCRETE
3.25 MIN
6.00 MAX
3.50 MIN
6.25 MAX
1.9 MIN
4.6 MAX
FLOOR BOX
5.
INSTALL INTUMESCENT-LINED CONDUIT AND FLOOR BOX LEVELING BOLTS AS SHOWN.
REMOVE (2) 1-1/2"
KNOCKOUT
(4) 1-1/2" CONDUIT LOCKNUT
(4) 1/4-20 x 6.00" LONG HEX BOLT
REMOVE (2) 1-1/2" KNOCKOUT
(4) INSERT LEVELING BOLT INTO HOLE
WIRE (BY OTHERS) TO SECURE BOX DURING POUR
7.
GANG BRACKET SCREWS AND GROUND SCREWS MUST BE IN PLACE AND BOTTOMED TO ENSURE SCREW VOIDS AFTER POUR. REINSTALL TEMPORARY
COVER. FILL VOIDS BETWEEN DECK CUT-OUT HOLE AND PAN WITH TAPE OR CAULK TO PREVENT CONCRETE LEAKAGE WHILE POURING. DURING POUR, A VIBRATORY TOOL MUST BE USED TO ENSURE COMPLETE FILL OF CONCRETE SURROUNDING THE FLOOR BOX WITHIN THE PAN ASSEMBLY.
NOTE: MINIMUM POUR HEIGHTS FOR UL 2-HOUR
FIRE CLASSIFICATION:
CORRUGATED DECK:
LIGHTWEIGHT CONCRETE: 3-1/4" NORMAL WEIGHT CONCRETE: 4-1/2"
FORMED DECK:
LIGHTWEIGHT CONCRETE: 3-3/4" NORMAL WEIGHT CONCRETE: 5"
(4) INTUMESCENT-LINED CONDUIT
FILL\COVER VOIDS BETWEEN
DECK AND PAN AS NECESSARY
TO PREVENT CONCRETE
LEAKAGE
Loading...