8.
ROUTE CONDUITS AS REQUIRED TO FLOOR BOX.
FL-FRK-500P INSTALLATION INSTRUCTIONS FOR CORRUGATED OR FORMED DECK
FSR
NOTE: READ FLOOR BOX INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION.
1.
CUT A 17-1/4" SQUARE OPENING IN DECK SURFACE AS SHOWN.
NOTE: CONSULT STRUCTURAL ENGINEER BEFORE CUTTING
17-1/4" SQUARE
DECKING. ADD ADDITIONAL SUPPORTS AS REQUIRED PER
ENGINEERING INSTRUCTIONS.
OPENING
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
17-1/4" SQUARE
OPENING
FORMED DECKSTEEL CORRUGATED DECK
9.
PULL WIRES AND CABLES TO BOX AS NECESSARY (CONFIGURING OF GANG MOUNTING
BRACKETS MAY BE REQUIRED - REFER TO FLOOR BOX INSTALLATION INSTRUCTIONS).
TERMINATE WIRES AND CABLES TO ELECTRONIC COMPONENTS, AND INSTALL
ELECTRONIC COMPONENTS ONTO GANG MOUNTING BRACKETS. REINSTALL
TEMPORARY COVER IF FINISHED COVER IS TO BE INSTALLED AT A LATER DATE.
GANG
MOUNTING
BRACKET
INSTALLED
ELECTRONIC
COMPONENT
NOTE: FOR CORRUGATED DECK PAN MUST BE CENTERED ON
PAN CENTER LINE
2.
BEND DOWN
TABS AS
NEEDED TO
SECURE PAN
TO DECK
PEAK OR VALLEY.
PAN CENTER LINE
PER CLIENT DESIGN SPECIFICATIONS, ORIENT PAN IN DECK
(SEE LABEL IN PAN BOTTOM).
INSTALL PAN IN CUT-OUT AND SECURE TO DECKING WITH
HARDWARE (BY OTHERS) OR WELDING.
WIRE - 13"-14" LONG,
BEND IN MIDDLE, WIRE
DOWN THRU CUT-OUT
HOLE IN FORM
CUT-OUT
HOLE
PAN LABEL
DO NOT SECURE
FLANGES TO FORM
FROM TOP OF FORM
NAIL/SCREW
INTO FORM
FROM BELOW,
IN LINE WITH
EMBOSS
TWIST WIRE
AROUND
NAIL/SCREW.
CUT WIRE
FOR EASY
REMOVAL
OF FORM
STEEL CORRUGATED DECK FORMED DECK
43023 LIT1428B
UNDERSIDE VIEW

3.
REMOVE AND RETAIN TEMPORARY COVER AND SCREWS.
(8) #6-32 FLAT
HEAD SCREWS
TEMPORARY
COVER
4.
REMOVE (4) 1-1/2" KNOCKOUTS LOCATED ON BOTTOM
OF FLOOR BOX. ALL OTHER KNOCKOUTS IN THE BOX
ARE NOT TO BE USED OR REMOVED.
6.
INSTALL FLOOR BOX INTO PAN. LEVEL BOX TO PROPER HEIGHT
WITH LEVELING BOLTS. ANCHOR BOX USING WIRE (SUPPLIED BY
OTHERS) TO PREVENT BOX FROM FLOATING DURING POUR.
FLOOR BOX
PAN
LEVELING
BOLT
CONCRETE
3.25 MIN
6.00 MAX
3.50 MIN
6.25 MAX
1.9 MIN
4.6 MAX
FLOOR BOX
5.
INSTALL INTUMESCENT-LINED CONDUIT AND FLOOR BOX
LEVELING BOLTS AS SHOWN.
REMOVE (2) 1-1/2"
KNOCKOUT
(4) 1-1/2" CONDUIT
LOCKNUT
REMOVE (2) 1-1/2"
KNOCKOUT
(4) 1/4-20 x 6.00"
LONG HEX BOLT
NOTE: MINIMUM POUR HEIGHTS FOR UL 2-HOUR
(4) INSERT LEVELING
BOLT INTO HOLE
WIRE (BY OTHERS) TO
SECURE BOX DURING POUR
7.
GANG BRACKET SCREWS AND GROUND SCREWS MUST BE IN PLACE AND
BOTTOMED TO ENSURE SCREW VOIDS AFTER POUR. REINSTALL TEMPORARY
COVER. FILL VOIDS BETWEEN DECK CUT-OUT HOLE AND PAN WITH TAPE OR CAULK
TO PREVENT CONCRETE LEAKAGE WHILE POURING. DURING POUR, A VIBRATORY
TOOL MUST BE USED TO ENSURE COMPLETE FILL OF CONCRETE SURROUNDING THE
FLOOR BOX WITHIN THE PAN ASSEMBLY.
FIRE CLASSIFICATION:
CORRUGATED DECK:
LIGHTWEIGHT CONCRETE: 3-1/4"
NORMAL WEIGHT CONCRETE: 4-1/2"
FORMED DECK:
LIGHTWEIGHT CONCRETE: 3-3/4"
NORMAL WEIGHT CONCRETE: 5"
(4) INTUMESCENT-LINED CONDUIT
FILL\COVER VOIDS BETWEEN
DECK AND PAN AS NECESSARY
TO PREVENT CONCRETE
LEAKAGE