5.
PRIOR TO PUSHING CEILING BOX INTO FRAME, APPLY BLUE PAINTERS TAPE (OR EQUIVALENT) TO THE FRAME'S PAINTED BORDER, TO HELP PREVENT SCRATCHING THE PAINT UPON BOX INSTALLATION. LINE UP THE BOX AND PUSH CEILING BOX UP INTO FRAME. WHEN CEILING BOX REACHES THE STOPS ON THE INSIDE OF THE FRAME, PUSH PINS INTO CAPTURE BRACKETS TO HANG BOX IN PLACE. IMPORTANT! - INSTALL PIN LABELS, APPROXIMATELY WHERE SHOWN, ON BOTH SIDES. REFER TO CEILING BOX INSTALLATION INSTRUCTIONS TO COMPLETE INSTALLATION. REMOVE TAPE ON COMPLETION OF INSTALLATION.
(4) CAPTURE BRACKET
INSDE FRAME
CB-SR12 INSTALLATION INSTRUCTIONS
FSR
1.
INSTALLATION OF THE CB-SR12 CEILING FRAME REQUIRES A ROUGH-IN HOLE IN THE CEILING OF 13" x 25", +/- 1/16". THEHOLE'S ROUGH-IN STRUCTURE NEEDS TO BE A MINIMUM OF 1-1/2" TALL, AND MAY BE MADE OF METAL OR WOOD.
THERE ARE 3 METHODS BY WHICH THE FRAME CAN BE RETAINED IN THE CEILING:
BY FOUR STEEL THREADED RODS, ONE PER CORNER OF THE FRAME, 1/4-20 THREAD MINIMUM TO 3/8-16 THREAD MAXIMUM,
1) CENTERED ON A 11-1/2" x 23-1/2" RECTANGLE, AND EXTENDING DOWN TO WITHIN 2" TO 6" OF THE CEILING'S IN-ROOM SURFACE.
2) BY STEEL HANGER CABLE, 3/32"-DIAMETER MINIMUM, AND THREADED THRU THE FRAME'S APPROPRIATE SLOTS/HOLES IN THE CORNERS OF THE UNIT.
3) BY SCREWS THRU THE APPROPRIATE HOLES IN THE CORNERS OF THE FRAME, INTO THE CEILINGS ROUGH-IN OPENING STRUCTURE. TWO SCREWS, MINIMUM, PER CORNER.
THE SELECTED MOUNTING METHOD MUST BE ABLE TO SUPPORT A MINIMUM OF 500 LBS, AND BE APPROVED FOR OVERHEAD LOADING.
THE STEPS REQUIRED TO MOUNT THE CEILING FRAME ARE:
A) DETERMINE THE MOUNTING METHOD APPROPRIATE FOR THE CEILNG CONSTRUCTION. B) CREATE THE ROUGH-IN OPENING STRUCTURE AND INSTALL UNIT SUPPORTING HARDWARE AS NEEDED. C) INSTALL CEILING/DRYWALL, TRIM TO ROUGH-IN OPENING. D) TAPE/SPACKLE THE CEILING DRYWALL, AND PAINT IT IF THE CEILING COLOR IS TO BE DIFFERENT THAN THAT OF
THE CEILING FRAME'S VISIBLE WHITE ROUGH-IN-OPENING COVER.
E) INSTALL THE CEILING FRAME, THEN PROCEED TO INSTRUCTION STEP #2, AND COMPLETE THE UNIT INSTALLATION.
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
SLOTTED OPENING
FOR THREADED
ROD OR CABLE
HOLE FOR CABLE
PIN (UNLOCKED POSITION)
(2) PIN LABEL
INSTALL 2ND LABEL
ON OPPOSITE SIDE
CEINLING BOX UNLOCKED AND LOWERED
CEILING BOX RAISED AND LOCKED
THREADED ROD
FRAME CORNER DETAIL
(2) NUT & (2) WASHER
THREADED ROD CABLE SCREW
QUICK ADJUST
CABLE CLAMP
HOLES FOR SCREWS
CABLE
SCREW
ROUGH-IN STRUCTURE (MINIMUM HEIGHT SHOWN)
PIN (LOCKED POSITION)
43159 LIT1587A
Page 2
2.
INSTALL BRACKETS INTO CEILING BOX (SOLD SEPARATELY). CEILING BOX SHELVES WILL HAVE TO BE REMOVED FOR INSTALLATION OF BRACKETS (SEE BRACKET DETAIL AND TOP VIEW). INSERT PINS INTO BRACKETS UNTIL FLUSH WITH CEILING BOX EXTERIOR WALL (SEE PIN DETAIL).
(4) GUIDE BRACKET (NOTE CABLE LOCATION)
(4) GUIDE BRACKET ENSURE BRACKETS ARE CORRECTLY LOCATED. NOTE CABLE LOCATIONS ON BRACKETS. CABLES WILL BE LOCATED FURTHEST FROM CENTER OF BOX.
SIDE CONDUIT KNOCKOUT
3.
ALIGN THE CEILING BOX, WITH ITS NEW BRACKETS, WITH THE CAPTURE BRACKETS INSIDE FRAME. ATTACH 2 CABLES FROM CEILING BOX (NEAREST THE BOX'S KO'S) TO FRAME AND ROUTE WIRING INTO CEILING BOX.
NOTE: ALL ELECTRICAL WIRES MUST DRAPE OVER THE TOP EDGE OF THE CEILING
BOX FRAME, NOT THRU THE SIDE OPENINGS. ONLY THE TOP-SURFACE KO'S OF THE CEILING BOX MAY BE USED FOR THE WIRING.
CABLE INSTALLATION
(4) CABLE
TOP VIEW
LOOSEN SHELF SCREWS AND REMOVE SHELVES TO INSTALL PIN BRACKETS
CEILING BOX (SOLD SEPARATELY)
SIDE CONDUIT KNOCKOUT
a.
INSERT LARGE TAB OF CABLE INTO LARGE OPENING.
CABLE
c.
SLIDE CABLE DOWNWARD TO FLOOR.
OPENING IN FRAME
b.
INSERT SMALL TAB OF CABLE INTO SMALL OPENING.
d.
INSTALL #6 SCREW TO SECURE CABLE TO FRAME.
(8) #8-32 x 3/8 LONG
PAN HEAD SCREW
(4) PIN BRACKET
(4) PIN
BRACKET DETAIL
GUIDE BRACKET
PIN DETAIL
(4) PIN INSERT PIN UNTIL FLUSH WITH EXTERIOR WALL OF CEILING BOX
4.
AFTER ALL WIRING IS ROUTED TO CEILING BOX, ATTACH REMAINING CABLES TO FRAME.