CB-22 INSTALLATION INSTRUCTIONS
CB-22 INSTALLATION INSTRUCTIONS
FSR
1.
INSTALL CB-22 TO A STRUCTURAL CEILING ABLE TO SUPPORT
FIVE TIMES THE NOTED GROSS WEIGHT. USE APPROPRIATE
MOUNTING METHODS BASED ON LOCAL BUILDING CODES.
INSTALL SAFETY CABLE AS REQUIRED BY LOCAL BUILDING
CODES. ROUTE CONDUITS TO BOX AS REQUIRED.
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
STRUCTURAL
MEMBER
NOTE: MAXIMUM GROSS WEIGHT - 120 LBS
NOTE: THREADED ROD IS THE
RECOMMENDED CEILING BOX
MOUNTING SUSPENSION
(SHOWN), TO MINIMIZE
FIXTURE TILTING DUE
TO THE WEIGHT OF ANY
SUSPENDED EQUIPMENT.
14 GA. STEEL TIE WIRE MAY BE USED
(SUPPLIED BY CUSTOMER OR USE FSR KIT)
AT 70,000 PSI TENSILE STRENGTH OR
BETTER AS REQUIRED BY BUILDING CODES.
BE PLUMB WITH CEILING AND FLOOR
AVAILABLE KITS (SOLD SEPARATELY):
CB-MNT1 - CABLE INSTALLATION KIT
CB-THRD - THREADED ROD INSTALLATION KIT
2.
TO INSTALL AC MAIN POWER INTO THE UNIT, REMOVE THE
AC ACCESS PLATE BY REMOVING (4) #8-32 SCREWS, AS
SHOWN. WIRING MUST BE PERFORMED BY A QUALIFIED
ELECTRICIAN ONLY. WIRING MUST BE DONE IN
ACCORDANCE WITH ALL NEC AND OTHER APPLICABLE
CODES. RE-INSTALL AC ACCESS PLATE AFTER AC WIRING IS
COMPLETE.
NOTE: WIRES SUPPORT CEILING
BOX, AND ARE NOT
THREADED ROD OR CABLE TO
SAFETY CABLES
ROUTE CONDUIT
(SUPPLIED BY
CUSTOMER) TO
AS REQUIRED
KNOCKOUTS
3.
ALL MOUNTING HARDWARE
SUPPLIED BY CUSTOMER
STRUCTURAL
CHANNEL
BRACKET - FSR'S
THREADED ROD
INSTALLATION KIT
(HARDWARE SUPPLIED
BY CUSTOMER)
REMOVE CEILING BOX DOOR. INSTALLATION OF
19-3/8" x 22-3/4" DROP CEILING PANEL MATERIAL INTO
DOOR CAN BE DONE NOW, WHILE DOOR IS OFF, OR
DURING RE-ASSEMBLY. BEND CAPTURE TABS OVER
CEILING PANEL TO HOLD IN PLACE.
SHELF
b
19-3/8" x 22-3/4"
DROP CEILING
PANEL MATERIAL
(SUPPLIED BY
CUSTOMER)
(4) CAPTURE TAB
AC ACCESS
AC POWER INPUT
WIRING MUST BE
PERFORMED BY
A QUALIFIED
ELECTRICIAN ONLY
43192 LIT1321B
PLATE
(4) #8-32 x 1/4"LONG PAN
HEAD SCREW
LOOSEN SCREWS
TO OPEN CB-22 DOOR
DISCONNECT
SAFETY CABLE
TO COMPLETELY
REMOVE DOOR
DOOR IS
REMOVABLE.
a
(a) PUSH DOOR
UP TOWARDS
CEILING AND
(b) PUSH
TOWARDS
SHELF -
REVERSE
PROCEDURE
TO INSTALL
FSR
CB-22 MOUNTING ELECTRONICS
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
4a.
REMOVE SHELF, AND MOUNT ELECTRONIC S TO SHEL F.
USE HOLE/SLOT PATTERN ON SHELF TO MOUNT
EQUIPMENT. ADDITIONAL HOLES MAY BE REQUIRED.
SEE 4b. FOR INSTALLING RACK MOUNTED UNITS.
RE-INSTALL SHELF INTO CB-22. MAKE ELECTRICAL
CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
LOOSEN SCREWS (4 PER SHELF)
TO REMOVE SHELVES
(2) SHELF
a
LOOSEN SHELF
SCREWS. (a) PUSH
SHELF TOWARDS
DOOR AND (b)
SHELF WILL DROP
DOWN OUT OF
CB-22
b
HOLES FOR ALTERNATE
LOCATION OF SHELVES
4b.
FOR 1RU x 19" EIA RACK-SIZED ELECTRONICS, INSTALL
RACK MOUNT BRACKETS AS SHOWN. INSTALL RACK
UNIT AND RE-INSTALL SHELF INTO CB-22. MAKE
ELECTRICAL CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
LEFT RACK
MOUNT
BRACKET
TOWARDS
BOX BLANK
END
RIGHT RACK
MOUNT
BRACKET
SHELF
ALTERNATE MOUNTING
(4) #10-32 x 3/8"-LONG
PAN HEAD SCREW
43192 LIT1321B
HOLES FOR RACK
MOUNT BRACKETS