FrontRow PlenumCore Installation Manual

Page 1
FrontRow PlenumCore Installation
Warning
Failure to follow these instructions can result in serious personal injury or damage to equipment.
Installation should only be completed by a qualified installer.
It is the installer’s responsibility to make sure the structure to which this component is attached can support five times the combined weight of the enclosure and all equipment it contains. Reinforce the structure as required before installing the equipment.
Do not begin to install your product until you have read and understood the instructions and warnings contained in this installation guide.
Installation Instructions
The ceiling enclosure is designed to be mounted on a suspended ceiling grid of 2x2ft or 60x60cm ceiling tiles. If the
enclosure is to be installed in a 2x4ft or 60x120cm grid, the tile will first need to be cut.
1. Secure provided cables to ceiling structure with anchors appropriate for the ceiling structure type. (Anchors not provided)
WARNING: Failure to properly set anchors may result in failure of anchor and serious personal injury or
damage to equipment!
2. Loop cables through cable anchors and tighten so there is no slack at the anchor. Image 1
3. Remove one ceiling tile from ceiling where the enclosure will be mounted. If using in 2x4ft or 60x120cm grid, cut the tile to fit the space next to the ceiling enclosure.
4. Close and lock (or remove) the lid on the ceiling enclosure to ensure that it does not swing open during installation.
Anchor
(not provided)
Ceiling Structure
Image 2
Cable
5. Place enclosure on top of grid while still supporting it until cables are attached in step 6. Image 2 Be sure to orient the enclosure for easy cable routing to power, projector, wall plates, etc.
Image 1
Page 2
6. Attach the cables to the ceiling enclosure mounting points by inserting the wire through the cable lock, then looping through the mounting point on the enclosure. Next, insert the wire through the other side of the cable lock. Image 3
For proper cable lock installation, follow steps a through e below:
Pull Adjustment pin back and pass WIRE through Kwik-Loc
a.
Loop WIRE through anchor
b.
Pull Adjustment pin back and pass WIRE back through Kwik-Loc
c.
d.
Always confirm engagement of Kwik-Loc™ on wire before applying load
Minimum 6 in / 15.24 cm
To adjust, take the load off and pull the tail slightly to disengage
e.
teeth, then release using adjustment pin
Adjustment pin
Image 3
WHEN PROPERLY INSTALLED, SAFETY CABLES SHOULD BE SUPPORTING THE WEIGHT OF THE ENCLOSURE, NOT THE SUSPENDED CEILING CROSS MEMBERS. FOLLOW LOCAL BUILDING CODES FOR PROPER INSTALLATION OF THE CABLES. SOME STATES REQUIRE SOME CABLES TO BE AT AN ANGLE TO PREVENT LATERAL MOTION IN AN EARTHQUAKE.
7. Use the included nylon bushing if routing the AC cable through the lid to a ceiling or wall mounted receptacle. Image 4
8. Use the included cable clamps to secure cables and prevent cable damage when routing cables through the knockouts. Image 5
9. If power will be pulled directly to the PlenumCore, remove the plate on the back of the enclosure and attach the 4 inch square junction box (plenum if required), duplex outlet, and surface cover. Image 6
Image 4 Image 5
Image 6
821-3001-007/Rev C 1016