Fisher™ Vee‐Ball™ V200U Rotary Control Valve
DN 80 through 250 (NPS 3 through 10)
May 2020
Contents
Introduction1.................................
Scope of Manual1.............................
Description2.................................
Specifications2...............................
Educational Services2
Installation3....................................
Maintenance7..................................
Packing Maintenance7.........................
Replacing the HD Ball Seal11....................
Bearing and Ball Maintenance14.................
Actuator Mounting19
Determining Mounting Position20...............
Determining Closed Position20.................
Parts Ordering23
Parts Kits23.....................................
Parts List24.....................................
................................
..........................
............................
Figure 1. Fisher V200U Flangeless Vee‐Ball with
™
Bettis
RPE Actuator and FIELDVUE™ DVC2000
Digital Valve Controller
X1711
Introduction
Scope of Manual
This instruction manual provides installation, operation, maintenance, and parts information for
the Fisher Vee‐Ball Flangeless V200U rotary control valve sizes DN80 through DN250
(NPS 3 through NPS 10) (see figure 1).
For information on ENVIRO‐SEAL
(D101643X012
www.Fisher.com
). Refer to separate manuals for information concerning the actuator, positioner and accessories.
Do not install, operate, or maintain Vee-Ball valves without being fully trained and qualified in valve,
actuator, and accessory installation, operation, and maintenance. To avoid personal injury or property
damage, it is important to carefully read, understand, and follow all the contents of this manual,
including all safety cautions and warnings. If you have any questions about these instructions, contact
your Emerson sales office
™
packing, see the ENVIRO‐SEAL Packing System for Rotary Valves instruction manual
before proceeding.
Page 2
V200U Valve
May 2020
Table 1. Specifications
Instruction Manual
D104548X012
Valve Sizes
See table 2
Valve End Connection Styles
Flangeless (all sizes) J mates EN1092-1 PN10-40
Type B raised-face flanges (see table 2) J mates with
ASME B16.5 CL150/CL300 raised-face flanges (see
table 2)
Maximum Inlet Pressure
Consistent with applicable EN 12516-1 or
ASME B16.34 ratings
Standard Flow Direction
Forward (into the convex face of the Vee‐Ball)
Dimensions
See table 4
Actuator Mounting
J Right‐hand, standard or J left‐hand, optional, as
viewed from the valve inlet (see figure 10 and the
Actuator Mounting section)
1. The pressure/temperature limits in this manual, and any applicable code or standard limitation, should not be exceeded.
(1)
Standard: Ball rotates counterclockwise to close
when viewed from actuator side of valve
Optional: Ball rotates clockwise to close
Ball rotation is 90 degrees
Valve/Actuator Action
For right-hand mount actuator, the standard ball
design and actuator action is counter-clockwise to
close (CCW). The ball will rotate to the top of the
valve body when open for a horizontal pipe run with
the valve shaft positioned horizontal. J Left-hand
actuator mounting with CCW action is an option.
Left-hand actuator mounting with a special clockwise
to close (CW) ball design and actuator action is also
available to allow the ball to rotate to the top of the
valve body for a horizontal pipe run with the valve
shaft positioned horizontal.
With diaphragm or piston rotary actuator,
field‐reversible between:J push‐down‐to‐close
(PDTC) (extending actuator rod closes valve) and
J push‐down‐to‐open (PDTO) (extending actuator
rod opens valve.)
Approximate Weight
See table 3
Description
The V200U Vee‐Ball valves (figure 1) with a V‐notch ball are used in throttling or on-off service. The V200U is a
flangeless construction capable of interfacing with EN 1092-1 Type B or ASME B16.5 raised face flanges. The splined or
square drive shaft connects to a variety of rotary‐shaft actuator options.
Specifications
Specifications for these valves are shown in table 1 and in the Fisher V200U Vee-Ball Rotary Control Valves Bulletin
51.3:V200U (D104550X012).
Educational Services
For information on available courses for Fisher Vee-Ball valves, as well as a variety of other products, contact:
Installation steps are provided in this section for V200U valves. Key numbers in installation procedures are shown in
figure 14 and 15 unless otherwise indicated.
WARNING
Always wear protective gloves, clothing, and eyewear when performing any installation operations to avoid personal
injury.
Personal injury or equipment damage caused by sudden release of pressure may result if the valve assembly is installed
where service conditions could exceed either the valve body rating or the mating pipe flange joint rating. To avoid such
injury or damage, provide a relief valve for overpressure protection as required by government or accepted industry codes
and good engineering practices.
Check with your process or safety engineer for any additional measures that must be taken to protect against process
media.
If installing into an existing application, also refer to the WARNING at the beginning of the Maintenance section in this
instruction manual.
3
Page 4
V200U Valve
May 2020
Instruction Manual
D104548X012
WARNING
When ordered, the valve configuration and construction materials were selected to meet particular pressure, temperature,
pressure drop, and controlled fluid conditions. Responsibility for the safety of process media and compatibility of valve
materials with process media rests solely with the purchaser and end‐user. To avoid possible personal injury and because
some valve/trim material combinations are limited in their pressure drop and temperature ranges, do not apply any other
conditions to the valve without first contacting your Emerson sales office
.
WARNING
The valve drive shaft is not necessarily grounded to the pipeline when installed. Personal injury or property damage could
result from an explosion caused by a discharge of static electricity from valve components if the process fluid or the
atmosphere around the valve is flammable. If the atmosphere around the valve or the process fluid is flammable,
electrically bond the drive shaft to the valve.
Note
Standard PTFE packing is composed of a partially conductive carbon‐filled PTFE female adaptor with PTFE V‐ring packing. Standard
graphite packing is composed of all conductive graphite ribbon packing. Alternate shaft‐to‐valve body bonding is available for
hazardous service areas where the standard packing is not sufficient to bond the shaft to the valve (see the following step).
Attach the optional bonding strap assembly (key 131, figure 2) to the valve drive shaft (key 6) with the clamp (key 130,
figure 2) and connect the other end of the bonding strap assembly to the valve body with the cap screw (key 23).
1. If the valve is to be stored before installation, protect the flange mating surfaces and keep the valve body cavity dry
and free of foreign material.
2. Install a three‐valve bypass around the control valve assembly if continuous operation will be necessary during
inspection and maintenance of the valve.
3. The valve is normally shipped as part of a control valve assembly, with an actuator mounted on the valve. If the
valve and actuator have been purchased separately or if the actuator has been removed, mount the actuator
according to the Actuator Mounting section and the appropriate actuator instruction manual.
4. Standard flow direction is forward (fluid flows into the convex face of the V-notch ball).
5. Install the valve in a horizontal or vertical pipeline with the drive shaft in a horizontal position.
CAUTION
Do not allow the valve to be installed in the pipeline with the drive shaft in the vertical position because of excessive wear
to valve component parts.
6. The actuator can be right‐ or left‐hand mounted with the shaft in a horizontal orientation as shown in figure 1. If
necessary, refer to the appropriate actuator instruction manual for actuator installation and adjustment
procedures.
CAUTION
Ensure the valve and adjacent pipelines are free of foreign material that could damage the valve seating surfaces.
4
Page 5
Instruction Manual
D104548X012
V200U Valve
May 2020
7. Be certain the valve and adjacent pipelines are free of any foreign material that could damage the valve sealing
surfaces.
8. Be sure the pipeline flanges are in line with each other.
1. To avoid potential interference with the valve outlet end pipe flange, the V200U ball should be in the closed
position prior to installation. Install the V200U valve using long studs to connect the two pipeline flanges. Refer to
figure 3 for the length of studs required based on the mating pipeline flange pressure class. Lubricate the studs with
anti‐seize lubricant.
CAUTION
For DN 100, 200, and 250 (NPS 4, 8, and 10), damage to the ball (key 2) could occur if the downstream piping interferes
with the ball rotation. Prior to installing the valve body between adjacent flanges, reference dimension P in table 4 and
measure carefully to ensure the ball will rotate without interference.
2. Install two studs in the flanges before you place the valve in the line. Place the two studs so they will contact the
line‐centering features at the bottom of the valve body.
3. Insert appropriate flange gaskets that are compatible with the process fluid.
4. Place the valve on the two studs. Install all remaining studs. Measure carefully to be sure the valve is centered on the
pipeline flanges, and tighten the flange stud nuts. Tighten the nuts in a criss‐cross sequence to be sure the flange
gaskets are properly torqued.
5. Connect pressure lines to the actuator as indicated in the actuator instruction manual. When an auxiliary manual
actuator is used with a power actuator, install a bypass valve on the power actuator (if one is not supplied) for use
during manual operation.
WARNING
Personal injury could result from packing leakage. Valve packing was tightened before shipment; however the packing
might require some readjustment to meet specific service conditions. Check with your process or safety engineer for any
additional measures that must be taken to protect against process media.
5
Page 6
V200U Valve
(1)P(2)
(3)
(3)
May 2020
Instruction Manual
D104548X012
If the valve has ENVIRO‐SEAL live‐loaded packing installed, this initial re‐adjustment will probably not be required. See
ENVIRO‐SEAL Packing System for Rotary Valves instruction manual (D101643X012
) for packing instructions.
Figure 3. Fisher V200U Dimensions and Required Clearances for Installation
1
P
GG69033-A
B
A
M
GG69042
NOTE:
1
STUD QUANTITY AND PLACEMENT SHOWN FOR EXAMPLE DN200 PN40 FLANGE.
Table 4. Fisher V200U Dimensions and Required Clearances for Installation
2. Minimum internal diameter of the mating pipe or flange required for Vee-Ball clearance.
3. The NPS 10 CL300 construction requires 4 bolts per side (8 total) to be installed in blind, tapped holes on the valve body. The M value for these 1 – 8 UNC fasteners is 140 mm (5.5 inch).
DIMENSION
M
mm
253253242237
Inches
9.969.969.539.33
6
Page 7
Instruction Manual
D104548X012
V200U Valve
May 2020
Maintenance
Valve parts are subject to normal wear and must be inspected and replaced as necessary. The frequency of inspection
and replacement depends upon the severity of service conditions.
Key numbers in this procedure are shown in figures 14 and 15 unless otherwise noted.
WARNING
The Vee‐Ball closes with a shearing, cutting motion, which could result in personal injury. To avoid injury, keep hands,
tools, and other objects away from the Vee‐Ball while stroking the valve.
Avoid personal injury from sudden release of process pressure. Before performing any maintenance operations:
D Do not remove the actuator from the valve while the valve is still pressurized.
D Disconnect any operating lines providing air pressure, electric power, or a control signal to the actuator. Be sure the
actuator cannot suddenly open or close the valve.
D Use bypass valves or completely shut off the process to isolate the valve from process pressure. Relieve process pressure
from both sides of the valve. Drain the process media from both sides of the valve.
D Vent the power actuator loading pressure and relieve any actuator spring precompression.
D Use lock‐out procedures to be sure that the above measures stay in effect while you work on the equipment.
D Always wear protective gloves, clothing, and eyewear when performing any maintenance operations.
D The valve packing area may contain process fluids that are pressurized, even when the valve has been removed from the
pipeline. Process fluids may spray out under pressure when removing the packing hardware or packing rings.
D Check with your process or safety engineer for any additional measures that must be taken to protect against process
media.
Packing Maintenance
Key numbers in this procedure are shown in figures 14 and 15 unless otherwise noted. A detailed view of the packing is
also shown in figure 4.
If the valve is equipped with the ENVIRO‐SEAL Packing System, refer to:
D The separate ENVIRO‐SEAL Packing System for Rotary Valves instruction manual (D101643X012
instructions, and
D The Parts List section of this manual for retrofit kits, parts kits, and individual parts.
If the packing is relatively new and tight on the drive shaft (key 6), and if tightening the packing follower nuts does not
stop leakage, it is possible that the drive shaft is worn or nicked so that a seal cannot be made. If the leakage comes
from the outside diameter of the packing, it is possible that the leakage is caused by nicks or scratches on the packing
box wall. Inspect the drive shaft and packing box wall for nicks or scratches while performing the following procedure.
Replacing Packing
When using this procedure, it is recommended that the actuator not be removed from the valve while the valve is still
in the pipeline or between flanges. Valve/actuator adjustments must be made with the valve out of the pipeline. Refer
to the Determining Closed Position portion of the Actuator Mounting section.
) for maintenance
7
Page 8
V200U Valve
May 2020
Instruction Manual
D104548X012
Disassembly
WARNING
Observe the steps in the WARNING at the beginning of the Maintenance section.
1. Isolate the control valve from the line pressure, release pressure from both sides of the valve body, and drain the
process media from both sides of the valve. If using a power actuator, shut off all pressure lines to the power
actuator, release pressure from the actuator, and disconnect the pressure lines from the actuator. Use lock‐out
procedures to be sure that the above measures stay in effect while you are working on the equipment.
2. To avoid potential interference with the valve outlet end pipe flange, the V200U ball should be in the closed
position prior to removal.
3. Remove line bolting, remove the control valve from the pipeline, and place the valve/actuator assembly on a flat
surface with the seal protector ring facing up.
4. Remove the actuator cover. Take note of the orientation of the actuator with respect to the valve body and the
lever orientation with respect to the valve drive shaft (see figure 12) for Fisher actuation.
WARNING
When the actuator is removed from the valve, the ball/shaft assembly may suddenly rotate, with a shearing, cutting
motion, which could result in personal injury. To avoid injury, carefully rotate the ball to a stable position at the bottom of
the valve body cavity. Make sure the ball will not rotate.
CAUTION
When removing the actuator from the valve, do not use a hammer or similar tool to drive the lever or actuator off the valve
shaft. Driving the lever or actuator off the valve shaft could damage the ball, seal, and valve.
If necessary, use a puller to remove the lever or actuator from the valve shaft. It is okay to tap the puller screw lightly to
loosen lever or actuator, but hitting the screw with excessive force could damage the ball, seal, and valve.
5. Remove the clamped lever (do not loosen the actuator turnbuckle adjustment), remove the actuator mounting
screws and nuts (keys 23 and 24), and remove the actuator. (If necessary, refer to the actuator instruction manual
for assistance.)
6. If applicable, remove the bonding strap assembly before attempting to remove the packing (see figure 2).
7. Remove the packing follower nuts and packing follower (keys 17 and 20). For alloy packing constructions, the
packing follower (key 17) and a separate packing flange (key 40) must be removed if present.
If the valve is equipped with the ENVIRO‐SEAL packing system, refer to the ENVIRO‐SEAL Packing System for Rotary
Valves instruction manual (D101643X012
) for disassembly.
WARNING
Personal injury could result from packing leakage. Do not scratch the drive shaft or packing box wall while removing
packing parts in the following procedure.
8
Page 9
Instruction Manual
D104548X012
V200U Valve
May 2020
8. Remove the packing parts (see figure 4, keys 16, 17, 35, and 39 depending on construction) using a formed wire
hook with a sharp end. Pierce the rings with the sharp end of the hook in order to remove them. Do not scratch the
drive shaft or packing box wall; scratching these surfaces could cause leakage. Clean all accessible metal parts and
surfaces to remove particles that would prevent the packing from sealing.
Assembly
If the valve is equipped with the ENVIRO‐SEAL packing system, refer to the ENVIRO‐SEAL Packing System for Rotary
Valves instruction manual (D101643X012
1. To help ensure correct centering of the Vee‐Ball (key 2) on the seal (key 11), make sure the ball is closed while you
install or tighten new packing. Insert a screwdriver, pry bar, or similar tool between the lower ear of the ball and the
valve body. Use the pry to move the ball tightly against the bearing on the actuator side of the valve (see figure 5).
Keep the ball in that position until you have completed packing installation and adjustment.
2. Install the new packing parts using the parts sequence shown in figure 4. Install the packing follower (key 17).
3. Secure the packing follower with the packing follower nuts (key 20). Tighten the nuts far enough to stop leakage
under operating conditions.
Note
If the valve is equipped with a bonding strap assembly (figure 2), re‐install the assembly.
) for assembly.
4. Reconnect the actuator and lever in accordance with the orientations that were noted in step 3 of the disassembly
procedures. If necessary, use figure 10 to identify the correct index marks.
5. Refer to the appropriate actuator instruction manual to complete actuator assembly and adjustment.
6. When the control valve is in operation, check the packing follower for leakage and re-tighten the packing follower
nuts (key 20) as necessary.
9
Page 10
V200U Valve
May 2020
Instruction Manual
D104548X012
Figure 4. Packing Arrangements
PTFE V‐RING PACKING
NOTE:
1
INCLUDES ZINC WASHERS (KEY 36) FOR
GRAPHITE RIBBON PACKING ONLY.
28B5170
FOR V200U
PACKING FLANGE
(KEY 102)
SPRING PACK
ASSEMBLY
(KEY 103)
ANTI‐EXTRUSION
RING (KEY 106)
PACKING FOLLOWER (KEY 17)
PACKING SET
(KEY 16)
PACKING
BOX RING (KEY 39)
STANDARD PACKING
PACKING FOLLOWER (KEY 17)
PACKING RING
(KEY 35)
1
PACKING
BOX RING (KEY 39)
GRAPHITE RIBBON PACKING
FOR V200U
PACKING FLANGE
NUT (KEY 101)
LUBRICANT
(KEY 113)
PACKING FLANGE
STUD (KEY 100)
B2412‐1
PACKING SET
(KEY 105)
PACKING FLANGE
(KEY 102)
SPRING PACK
ASSEMBLY
(KEY 103)
PACKING SET
(KEY 105)
PACKING BOX
RING (KEY 107)
42B8445‐C SHT 1
ENVIRO‐SEAL PTFE PACKING SYSTEM
PACKING FLANGE
NUT (KEY 101)
LUBRICANT
(KEY 113)
PACKING FLANGE
STUD (KEY 100)
PACKING BOX
RING (KEY 107)
42B8445‐C SHT 2
ENVIRO‐SEAL GRAPHITE PACKING SYSTEM
10
Page 11
Instruction Manual
D104548X012
Figure 5. Typical Vee‐Ball Valve Showing Pry Bar
ACTUATOR SIDE
OF VALVE
58B2296‐B
E0739
V200U Valve
May 2020
THRUST AND BEARING SURFACE
PRY IN THIS DIRECTION
BALL
Replacing the HD Ball Seal
Perform this procedure if the control valve is not shutting off properly or if seal inspection is necessary.
The valve / actuator assembly must be removed from the pipeline. To avoid potential interference with the valve
outlet end pipe flange, the V200U ball should be in the closed position prior to removal. For DN 80 and 100 (NPS 3 and
4), the actuator may remain mounted on the valve for ball seal replacement. For DN 150 through 250 (NPS 6 through
10), the actuator must be removed from the valve to replace the ball seal. Key numbers are shown in figures 14 and 15
unless otherwise indicated. Ball Seal assembly details (with key numbers) are also shown in figure 6.
Figure 6. Ball Seal Design
SEAL PROTECTOR
RING (KEY 3)
RADIAL SEAL
(KEY 37)
WAVE SPRING
(KEY 13)
WAVE SPRING
(KEY 13)
HD METAL BALL
SEAL (KEY 11)
GG69044
DN 80 AND 100
(NPS 3 AND 4)
RADIAL SEAL
(KEY 37)
GG69045
HD METAL BALL
SEAL (KEY 11)
DN 150, 200, AND 250
(NPS 6, 8, AND 10)
11
Page 12
V200U Valve
May 2020
Instruction Manual
D104548X012
WARNING
Perform the steps in the WARNING at the beginning of the Maintenance section of this manual.
Removing the HD Seal
1. Remove line bolting, remove the control valve from the pipeline, remove the actuator (as discussed in the packing
section), and place the valve body on a flat work surface.
a. For DN 80 and 100 (NPS 3 and 4), remove protector ring screws and washers (keys 21 and 22). Carefully remove
the seal protector ring (keys 3) and gasket (keys 15).
b. For DN 150, 200, and 250 (NPS 6, 8, and 10), the ball must be removed to access the seal. See the Bearing and
Ball Maintenance Disassembly section of this manual. Then return to this procedure and continue with the next
steps.
2. Remove HD seal from related component.
c. For DN 80 and 100 (NPS 3 and 4), once the protector ring (key 3) has been removed from the valve, push the
metal seal (key 11) out of the seal protector ring (key 3). Remove the wave spring (key 13) and the radial seal
(key 37).
d. For DN 150, 200, and 250 (NPS 6, 8, and 10), with the inlet side of the valve facing up, push the HD metal seal
(key 11) into the valve body (key 1). Remove the wave spring (key 13) and the radial seal (key 37).
CAUTION
Exercise care to avoid damaging components in the following procedure.
D It might be necessary to remove the HD metal seal by carefully tapping it with a soft punch and hammer.
Take care not to damage the seal protector ring and valve body.
D If the seal is difficult to push out, it is recommended that a seal removal plate be used to press the HD metal
seal out of the valve body. Refer to figure 7 for dimensions of the seal removal plate.
12
Page 13
Instruction Manual
D104548X012
Figure 7. HD Seal Removal Plate Dimensions
A5544
VALVE SIZEDIMENSION A
DNNPSMinimum‐Maximum, mmMinimum‐Maximum, Inches
80
100
150
200
250
10
V200U Valve
May 2020
6.4 mm
(0.250 INCHES)
MINIMUM
A
3
4
6
8
75.9‐76.2
95.0‐95.3
126.7‐127.0
158.5‐158.8
212.5‐212.7
2.990‐3.000
3.740‐3.750
4.990‐5.000
6.240‐6.250
8.365‐8.375
3. If replacement of the ball, shafts (keys 6 or 9), or bearings (key 10) is needed, proceed to the Bearing and Ball
Maintenance procedure. If only the seal is to be replaced, proceed to the Installing HD Metal Seals section.
Installing HD Metal Seals
Refer to figures 6, 14, and 15 for key number locations during seal installation.
Thoroughly clean all parts that are to be re‐used and obtain replacement parts. Be sure that all sealing surfaces are in
good condition without scratches or wear. If the valve has been installed between line flanges and the flange studs and
nuts have been tightened, always replace the gasket (key 15) with a new gasket.
1. For DN 80 and 100 (NPS 3 and 4), before installing HD metal seals, ensure ball (key 2) is installed into valve body.
Ball should be in closed position while you install the seal and seal protector ring. Insert a screwdriver, pry bar, or
similar tool between the lower ear of the ball and the valve body (see figure 5).
2. Use the pry to move the ball tightly against the bearing on the actuator side of the valve. Be careful, excessive force
may damage the ball. Keep the ball in that position until you have completed seal or flow ring installation. Check
the ball's position periodically, and re‐center if necessary, during lever assembly and packing adjustments. See
figure 5.
WARNING
The Vee‐Ball closes with a shearing, cutting motion, which could result in personal injury. To avoid injury or property
damage, keep hands, tools, and other objects away from the Vee‐Ball while stroking the valve.
3. Lubricate and install the radial seal (key 37) into the appropriate groove in the seal protector ring making sure the
open side of the radial seal faces away from the ball.
4. Install the wave spring (key 13) into the seal protector ring (key 3).
13
Page 14
V200U Valve
May 2020
5. Install the HD seal (key 11) into the seal protector ring (key 3), past the radial seal. While pushing it past the radial
seal, make sure the HD seal is level.
6. Install a replacement gasket (key 15) on the valve body (key 1). Install the HD ball seal/seal protector ring assembly
into the valve body (key 1).
7. Install clips and screws that clamp the seal protector ring to the valve body (keys 3, 21, and 22).
8. If necessary, refer to the Packing Maintenance procedures to install the packing. Install the actuator using the
Actuator Mounting procedures or to the appropriate actuator instruction manual.
1. For DN 150, 200, and 250 (NPS 6, 8, and 10), position the valve body on a flat surface with the outlet side of the
valve facing up.
2. Lubricate the radial seal (key 37) and install into the appropriate groove in the valve body, making sure the open
side of the radial seal faces away from the ball.
3. Install the wave spring (key 13) into the appropriate groove in the valve body.
4. The HD seal can be installed by pushing the HD seal past the wave spring and radial seal, making sure the HD metal
seal remains level. Following this, install the remaining trim components as explained under the Bearing and Ball
Maintenance Assembly section of this manual.
5. Use the pry bar or similar tool to move the ball tightly against the bearing on the actuator side of the valve to help
ensure correct side-to-side centering of the ball (key 2) on the seal (key 11). See figure 5.
6. Be sure that the HD seal is fully installed in the valve. Carefully rotate the ball to engage the HD seal while applying
force across the middle of the seal to compress the wave spring until the ball is fully engaged. Be cautious during
this process, knowing that excessive force may damage the ball. Keep the ball in the engaged position going
forward.
7. Continue to check the ball's position and re-center if necessary during actuator mounting and packing adjustments.
Instruction Manual
D104548X012
HD Ball Seal Lubrication
To assist with break‐in of the HD seals, it is required that the ball and seal be lubricated with dry film lubricant or
equivalent moly disulfide.
Bearing and Ball Maintenance
WARNING
Before performing the steps in this section, observe the WARNING at the beginning of the Maintenance section of this
manual.
Procedures for disassembly and assembly of the bearings and ball cannot be accomplished until the shaft and valve
packing are removed from the valve.
Refer to the Replacing Packing procedures to remove the actuator, and to remove the packing flange and packing
follower from the valve. When the packing disassembly steps are complete, return to this section.
Disassembly
WARNING
When the actuator is removed from the valve, the ball/shaft assembly may suddenly rotate, with a shearing, cutting
motion, which could result in personal injury. To avoid injury, carefully rotate the ball to a stable position at the bottom of
the valve body cavity. Make sure the ball will not rotate.
14
Page 15
Instruction Manual
D104548X012
V200U Valve
May 2020
Key numbers in this procedure are shown in figures 6, 14, and 15, unless otherwise indicated.
1. For DN 80 and 100 (NPS 3 and 4), seal protector ring (key 3) and HD seal (key 5) should be removed first, refers to
procedure of Removing HD Seal on page 12. For DN 150, 200, and 250 (NPS 6, 8, and 10), HD seal will be removed
after ball (key 2) is removed in this procedure.
2. A taper key (key 4) is used to connect the ball and drive shaft.
3. Carefully rotate the ball to the open position after the actuator is disconnected. Make sure the ball will not rotate
(see warning above). Provide support for the ball during the following disassembly.
4. Working from the small end of the groove pin (key 7), use a pin punch to drive the groove pin out of the ball ear and
follower shaft.
For tack welded taper keys, driving the taper key out of the ball ear will shear the tack welding.
5. Locate the small end of the taper key (key 4). Using a pin punch on the smaller end of the taper key, drive it out of
the ball (key 2) and drive shaft (key 6). Note: driving the taper key in the wrong direction will tighten it.
6. Pull the drive shaft (key 6) out of the actuator side of the valve body.
CAUTION
Exercise care to avoid damaging components in the following procedure.
7. The ball will be free to move when both shafts are removed. Make sure the sealing surface of the ball is not
damaged while removing the follower shaft.
8. Use a piece of continuous threaded rod as a removal rod when moving the follower shaft (key 9) into the center of
the ball. Refer to table 5 for a description of the size threaded rod needed. The length of the rod should allow easy
working room from the valve body.
Table 5. Continuous Threaded Rod
Valve Size, DNValve Size, NPSThreaded Rod Thread Size
8031/4-200.5
10041/4-200.5
15061/4-200.5
20085/16-180.62
250105/16-180.62
Thread Depth in Follower Shaft,
Inch
9. Carefully remove the follower shaft.
10. For DN 80 and 100 (NPS 3 and 4), the ball (key 2) should be removed from the inlet opening of the valve body. Lift
the ball to clear the bearings (key 10). Engage the ball drive shaft side ear with the body as shown in figure 8 and
carefully lift the ball by the follower side ear to remove.
For DN 150, 200, and 250 (NPS 6, 8, and 10), the ball (key 2) should be removed from the outlet opening of the
valve body. Lift the ball to clear the bearings (key 10). Engage the ball drive shaft side ear with the body as shown in
figure 9 and carefully lift the ball by the follower side ear to remove.
11. The bearings are not pressed in, so they can be removed with minimal force. Be careful not to damage the
machined surfaces of the bearing bore if prying is required.
For HD seal removal, follow the steps outlined under Removing HD Seal of this manual.
15
Page 16
V200U Valve
May 2020
Figure 8. DN 80 and 100 (NPS 3 and 4) Ball Removal
Instruction Manual
D104548X012
VALVE INLET
Figure 9. DN 150, 200, and 250 (NPS 6, 8, and 10) Ball Removal
VALVE OUTLET
Assembly
1. Inspect all sealing surfaces to ensure they are in good condition and without scratches or wear.
For DN 150, 200, and 250 (NPS 6, 8, and 10), install the HD ball seal. See Installing the HD Seal of this manual and
follow steps 1 through 4. Then return to this procedure and continue with the next steps.
2. Install the replacement bearings (key 10) by hand. The bearing flanged end should touch the valve body.
16
Page 17
Instruction Manual
D104548X012
V200U Valve
May 2020
3. Installing the Vee‐Ball: Lubrication will assist with break-in of the HD metal seals and with assembly. It is required
that both the ball surface and seal be lubricated with dry film lubricant or equivalent moly disulfide.
WARNING
The ball might be damaged if it is allowed to fall into the valve body. To avoid personal injury or damage to the sealing
surfaces, support the ball to prevent it from falling into or out of the valve body cavity.
Place the valve body on a table or bench.
D For DN 80 and 100 (NPS 3 and 4), the ball (key 2) should be installed from the inlet opening of the valve body.
The follower shaft (key 9) should be inserted into the ball before the ball is installed. Engage the ball drive shaft
side ear with the body as shown in figure 8 then lower the follower side ball ear into the body and position the
ball between the bearings.
D For DN 150, 200, and 250 (NPS 6, 8, and 10), the ball (key 2) should be installed from the outlet opening of the
valve body. Engage the ball drive shaft side ear with the body as shown in figure 9 then lower the follower side
ball ear into the body and position the ball between the bearings.
4. Installing the Follower Shaft (key 9):
D For DN 80 and 100 (NPS 3 and 4), the follower shaft (key 9) should already have been inserted into the ball before
the ball was put into the valve body. Insert the follower shaft (key 9) into the valve body bearing (key 10).
D For DN 150, 200, and 250 (NPS 6, 8, and 10), with the ball rotated open and not in contact with the HD seal,
insert the follower shaft (key 9) through the ball, and into the valve body bearing (key 10).
5. Align the hole in the follower shaft with the holes in the ball. Insert the small end of the groove pin (key 7) into the
hole in the ball and into the follower shaft. The pin will hold the parts in place while the drive shaft (key 6) is being
installed.
6. Installing the Drive Shaft (key 6):
CAUTION
The drive shaft must be used with the correct Vee‐Ball. Refer to the tag (see figure 10) attached to the Vee‐Ball and to the
drive shaft.
Failure to use the correct Vee‐Ball/shaft combination may result in the ball not being in the position indicated by the slash
mark on the end of the shaft. If the ball is not properly aligned with the slash mark, the valve will not function correctly and
seal damage may result.
Make sure the drive shaft is free of oil or grease, otherwise the taper pin or taper key will not seat properly. Failure to
properly set the taper pin or taper key could result in it coming loose while in service. Loosening of the taper key in service
could result in improper valve function and equipment damage.
17
Page 18
V200U Valve
May 2020
Figure 10. Informational Tag
Instruction Manual
D104548X012
GE11636‐A
FOR STANDARD RIGHT/LEFT HAND BALL
GE11637‐A
FOR OPTIONAL LEFT HAND BALL
7. Install the drive shaft (key 6) into the valve body through the valve body bearing and into the ball.
8. Insert the taper key (key 4) into ball and drive shaft (keys 2 and 6) as shown in figure 11. The taper key inserts with
the flat side of the key facing the drive shaft (key 6).
9. Using a flat end punch, drive the groove pin (key 7) into the ball ear and follower shaft until it is flat with the ball ear
surface. Stake both ends of the pin hole with a center punch to ensure the groove pin does not come out.
10. Using a flat end punch, drive the taper key (key 4) into the ball ear and drive shaft (key 6) until solid, heavy contact is
obtained between the key and shaft.
11. Measure the position of the taper key head.
12. Drive the taper key in further using the minimum distance shown in table 6.
13. Inspect the ball/shaft taper key connection to verify that the taper key spans the entire shaft flat width. If not, the
taper key must be driven in further until this condition is satisfied. However, do not exceed the maximum depths
shown in table 7.
Note
All valve taper keys are tack welded, except titanium.
14. When the above conditions are met, tack weld the taper key (key 4) to the ball ear on the head end of the key (see
figures 14 and 15). Use a:
D 1/8-inch diameter weld on DN 80, 100, and 150 (NPS 3, 4, and 6) valves
D 3/16-inch diameter weld on DN 200 and 250 (NPS 8 and 10) valves
15. Use the pry bar or similar tool to move the ball tightly against the bearing on the actuator side of the valve to help
ensure correct side-to-side centering of the ball (key 2) on the seal (key 11). See figure 5.
16. Be sure that the HD seal is fully installed in the valve. Carefully rotate the ball to engage the HD seal while applying
force across the middle of the seal to compress the wave spring until the ball is fully engaged. Be cautious during
this process, knowing that excessive force may damage the ball. Keep the ball in the engaged position going
forward.
18
Page 19
Instruction Manual
D104548X012
V200U Valve
May 2020
17. Continue to check the ball's position and re-center if necessary during actuator mounting and packing adjustments.
For all constructions, refer to Packing Maintenance, and other procedures as necessary to complete the assembly of
the valve.
Figure 11. Taper Key Installation
BALL
(KEY 2)
TACK WELD
TAPER KEY
(KEY 4)
MINIMUM ENGAGEMENT OF TAPER KEY
DRIVE SHAFT
(KEY 6)
TACK WELD
TAPER KEY
(KEY 4)
31B0727‐E
A6035‐1
MAXIMUM ENGAGEMENT OF TAPER KEY
Table 6. Taper Key Minimum Depth
Valve Size, DNValve Size, NPS
80, 100, 150
200, 250,
3, 4, 6
8, 10,
Minimum Depth To Drive Taper Key After
Initial Solid Contact, mm (Inches)
4.8 (0.188)
5.6 (0.219)
Table 7. Taper Key Maximum Depth
Valve Size, DNValve Size, NPS
80, 100
150
200, 250
3, 4
6
8, 10
Maximum Depth To Drive Taper Key After
Initial Solid Contact, mm (Inches)
7.1 (0.281)
7.9 (0.312)
9.5 (0.375)
Actuator Mounting
Use the appropriate actuator instruction manual, this section of this manual, and figure 12 of this manual when
mounting the actuator or changing actuator styles and positions.
1. To help ensure correct centering of the Vee‐Ball (key 2) on the seal (key 11), be sure the ball is closed when
mounting the actuator (for applications other than Spring Return Fail‐Open).
2. Clean the valve shaft and actuator lever splines to be sure the actuator lever will slide on easily. Only drive the lever
in if absolutely necessary.
3. Carefully wedge the ball solidly against the actuator‐side bearing, using a pry bar or similar tool inserted between
the lower ear of the ball and the valve body. This will center the ball. See figure 5.
19
Page 20
V200U Valve
May 2020
4. Keep the wedge in place while installing the lever, if necessary. Remove the wedge after you have clamped the
actuator lever on the valve shaft and have connected the lever to the actuator piston rod or diaphragm rod.
Instruction Manual
D104548X012
Determining Mounting Position
The actuator can be either right or left‐hand mounted, with the actuator on the right or left side when viewed from
upstream (see figure 12).
The Series B Vee‐Ball has one V‐notch. For right‐hand mounting (standard), the ball will be in the top of the valve body
when the valve is open and the shaft is horizontal. In this position the ball rotates CCW to Close. For left‐handmounting (standard), the ball will be in the bottom of the valve body when the valve is open and the shaft is horizontal.
In this position the ball rotates CCW to Close. An optional ball for left‐hand mounting, which rotates into the top of the
valve body when the shaft is horizontal, is also available. In this position the ball rotates CW to Close.
Determining Closed Position
1. The valve must be removed from the line to check the position of the ball.
WARNING
The Vee‐Ball closes with a shearing, cutting motion. To avoid personal injury, keep hands, tools, and other objects away
from the ball while stroking the valve.
2. Rotate the ball to the closed position.
3. Position the ball in the proper location:
When viewed from the valve body inlet, the ball is in the proper position when the flat spot on the top of the ball is
exactly in the center of the seal package.
Make a copy of the centering template in figure 13 out of a suitable stiff material. Place the centering template in
the opening at the seal (see figure 13). Find the center of the template and make sure the spot on the ball is
centered directly below it.
4. Adjust the actuator as described in the appropriate actuator instruction manual until the ball is centered in the
closed position. A line is stamped on the actuator end of the drive shaft (see figure 12) to indicate the ball position.
Use the appropriate actuator instruction manual and figure 12 of this manual when mounting the actuator or
changing actuator styles and positions.
20
Page 21
Instruction Manual
D104548X012
Figure 12. V200U Index Marks for Actuator Lever Orientation
V200U Valve
May 2020
E1842
(2)
NOTE:
1. ARROW ON LEVER INDICATES DIRECTION OF ACTUATOR THRUST TO CLOSE VALVE.
2. THE OPTIONAL LEFT-HAND ORIENTATION IS NOT AVAILABLE FOR MICRO-NOTCH VEE-BALLS.
21
Page 22
V200U Valve
(1)
(1)
May 2020
Figure 13. Centering Template in Use and Template Dimensions
1. These dimensions are the same for ASME and DIN valves.
22
Page 23
Instruction Manual
(1)
(2)
(1)
(2)
D104548X012
V200U Valve
May 2020
Parts Ordering
A serial number is assigned to each valve and stamped on the nameplate. Always refer to the valve serial number when
corresponding with your Emerson sales office
replacement parts, also specify the key number, part name, and desired material using the parts list.
WARNING
Use only genuine Fisher replacement parts. Components that are not supplied by Emerson Automation Solutions should
not, under any circumstances, be used in any Fisher valve, because they will void your warranty, might adversely affect the
performance of the valve, and could give rise to personal injury and property damage.
Retrofit Kits for ENVIRO‐SEAL Packing
Retrofit kits include parts to convert existing V200U valves with shallow (single packing depth) packing box to the
ENVIRO‐SEAL packing box construction. Retrofit kits include single PTFE packing. See following table.
ENVIRO‐SEAL Packing Retrofit Kits
SHAFT DIAMETER
mmInchesSingle PTFEGraphite
19.13/4RRTYXRT0032RRTYXRT0332
25.41RRTYXRT0052RRTYXRT0352
31.81‐1/4RRTYXRT0062RRTYXRT0362
KeyDescriptionQuantity
100Packing stud22
101Packing nut22
102Packing flange11
103Spring pack assembly11
105Packing set11
106Anti-extrusion washer2‐ ‐ ‐
107Packing box ring
‐ ‐ ‐Tag11
‐ ‐ ‐Tie Cable11
1. Diameter through the packing box.
2. Not required for all sizes of V150E with 1‐1/4 inch diameter shafts.
regarding spare parts or technical information. When ordering
PART NUMBER
Parts Included in Kit
11
Repair Kits for ENVIRO‐SEAL Packing
Repair kits include valves parts for shallow (single packing depth) for ENVIRO‐SEAL packing box construction. Repair
kits include single PTFE or graphite packing. See following table.
ENVIRO‐SEAL Packing Repair Kits
SHAFT DIAMETER
mmInchesPTFEGraphite
19.13/4RRTYX00003213B8816X052
25.41RRTYX00005213B8816X092
31.81‐1/4RRTYX00006213B8816X112
Parts Included in Kit
KeyDescriptionQuantity
105Packing set11
106Anti‐extrusion washer2‐ ‐ ‐
1. Diameter through the packing box.
2. Included in key 105.
PART NUMBER
23
Page 24
V200U Valve
May 2020
Parts List
Instruction Manual
D104548X012
Note
Contact your Emerson sales office
for Part Ordering information.
Common Parts
(figures 14 and 15)
KeyDescription
1If you need a valve body as a replacement part, order by valve
size, serial number, and desired valve body material. Contact your
Emerson sales office for assistance.
2* Ball
3Seal Protector Ring, DN 80 and 100 (NPS 3 and 4)
4* Taper Key
6* Drive Shaft
7* Groove Pin
9* Follower Shaft
10* Bearing (2 req'd)
11* Ball Seal
13* Wave Spring
15* Gasket
16* Packing Set
17Packing Follower
19Packing Follower Stud
20Packing Follower Nut
21Seal Protector Ring Screw , DN 80 and 100 (NPS 3 and 4)
22Seal Protector Ring Clip , DN 80 and 100 (NPS 3 and 4)
23Actuator Mounting Screw
24Actuator Mounting Nut
26Identification Nameplate
27Drive Screw
28Flow Arrow
30Nameplate
31Nameplate Wire (not shown)
37* Radial Seal
39* Packing Box Ring
40Packing Flange
41Retaining Ring
130Clamp
131Bonding Strap Assembly
ENVIRO‐SEAL Packing System
(Parts in all Type Vee‐Ball Valves)
(figure 4)
KeyDescription
100Packing Flange Stud
101Packing Flange Nut
102Packing Flange
103Spring Pack Assembly
105* Packing Set
106* Anti‐Extrusion Ring (2 req'd)
107* Packing Box Ring
108* Packing Ring (2 req'd)
109* Anti‐Extrusion Ring (2 req'd)
110Lantern Ring
111Tag
112Tie Cable
113Lubricant, anti‐seize (not furnished with packing system)
24
*Recommended spare parts
Page 25
Instruction Manual
D104548X012
Figure 14. Fisher V200U DN 80 and 100 (NPS 3 and 4) Cross Sectional View
V200U Valve
May 2020
GG67035
NOTE:
KEYS 28, 30, 31, 32, 35, 36 AND 62 ARE NOT SHOWN.
25
Page 26
V200U Valve
May 2020
Figure 15. Fisher V200U DN 150, 200, and 250 (NPS 6, 8, and 10) Cross Sectional View
Instruction Manual
D104548X012
GG67091
NOTE:
KEYS 28, 30, 31, 32, 35, 36 AND 62 ARE NOT SHOWN.
26
Page 27
Instruction Manual
D104548X012
V200U Valve
May 2020
27
Page 28
V200U Valve
May 2020
Instruction Manual
D104548X012
Neither Emerson, Emerson Automation Solutions, nor any of their affiliated entities assumes responsibility for the selection, use or maintenance
of any product. Responsibility for proper selection, use, and maintenance of any product remains solely with the purchaser and end user.
Fisher, ENVIRO-SEAL, Vee-Ball, Bettis, and FIELDVUE are marks owned by one of the companies in the Emerson Automation Solutions business unit of
Emerson Electric Co. Emerson Automation Solutions, Emerson, and the Emerson logo are trademarks and service marks of Emerson Electric Co. All other
marks are the property of their respective owners.
The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not
to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are
governed by our terms and conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of such
products at any time without notice.
Emerson Automation Solutions
Marshalltown, Iowa 50158 USA
Sorocaba, 18087 Brazil
Cernay, 68700 France
Dubai, United Arab Emirates
Singapore 128461 Singapore
www.Fisher.com
28
E 2020 Fisher Controls International LLC. All rights reserved.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.