
Supplied By www.heating spares.co Tel. 0161 620 6677
FERROLI F30
Gas Combination Boiler for Central Heating
and Hot Water Production, Wall Mounted,
Copper Heat Exchanger, Fan Assisted,
Room Sealed,
Electronic Flame Ignition and Control
REAR FLUE INSTALLATION
Appr. nr. B99.06 A - CE 0461 BM 0607
INSTRUCTIONS
G.C. NO: 47-267-32
3544016/0 - JDL 10/04

Supplied By www.heating spares.co Tel. 0161 620 6677
FERROLI F30
For installation (back flue connection):
For direct back flue connection it is necessary to use the optional kit Part No 822186, and it is necessary to alter
the fan direction inside the boiler.
Please Follow the below procedure carefully:
Remove fan by pulling off electrical connections. Pull off air pressure switch tubes from the air
pressure switch remove 2 screws
b. Rotate the fan downward to
disengage it from the securing
pin (a).
Fig. 21a
Remove the four screws which fix
the back plate onto sealed chamber, remove and rotate the plate
through 90° and fit it to the top of
the boiler to cover the original flue
outlet. Secure it in place with the
four screws removed previously.
(fig 21b 21c)
Attach the flue adaptor (A) to the
rear of the appliance using the
ring seal and four screws supplied
(fig 21d)
Remove and disgard the fan adaptor and heatshield
Fig. 21b
Fig. 21c
Fig. 21d
Remove fan mounting plate by undoing the three fixing screws "d". Rotate the fan through 90° so that the fan
nozzle points sideways. Secure the fan to the plate in the new position using screws in position "c".
Attach the fan spigot adapter "B" using the two screws "E" provided.
NOTE: The spigot must be sealed using high temperature silicone, not supplied.
E
Fig. 21e
Fig. 21f
Fig. 21g
Page 1

Supplied By www.heating spares.co Tel. 0161 620 6677
Back flue outlet (Diagram 1-9)
FERROLI F30
1. Core drill 127mm hole (5").
Fig. 22a
6. Cut the outer flue 80mm longer
than the inner wall finish.
Fig. 22f
2. Push through the outer flue.
Fig. 22b Fig. 22c
7. Insert the aluminium flue pipe into
white plastic outer flue, making
sure the aluminium pipe sits fully
and centrally into the flue terminal. Mark the aluminium flue pipe
at the point it is flush with the
plastic outer flue, add 60mm to
this mark and cut the aluminium
inner flue pipe at this point.
NOTE: Ensure the end is cut square
de-burred & lubricated with silicone grease.
3. Gently pull back until wall seal
is flush with the wall.
60mm60mm
Fig. 22g
8. Ensure that the inner metal flue is pushed into the
terminal, as shown.
9. Lift boiler onto the wall bracket with flue in place,
and engage the outer flue into the adapter. Secure
the boiler using the nuts & washers supplied.
60mm
Fig. 22h Fig. 22i
9. Make sure the inner flue is fully engaged in the
flue terminal, Re-attach the fan as shown in fig
21h. Secure bottom of boiler using two screws
and washers provided.
Page 2

Supplied By www.heating spares.co Tel. 0161 620 6677
FERROLI F30
Re-attach the fan with the screws (b). Refit wiring connections to fan and air pressure switch tubes ensuring
correct orientation. I.E. red tube to air pressure switch connection with red dot (+) and clear tube to air pressure
switch connection with no paint marking (-). (Clear hose to fan venturi)
Fit the fan into the boiler rotating the front to engage with the mountin lug. Secure with the screws b.
NOTE
Mounting plate rests
on lower lug.
Air pickup Venturi
NOTE: The rear flue application does NOT require any flue restrictor ring to be installed. The maximum flue
distance for this application is 1 meter with NO bends being permissible.
When testing the appliance, if the boiler does not ignite, but the fan runs continuously, then it woul be advisable to check the orientation of the air pressure switch hoses.
Fig. 21h
FOR FURTHER INFORMATION PLEASE CALL OUR INSTALLER TECHNICAL
HELP LINE
TEL O8707 282885 OPTION 1
Page 3