Ferroli F30 Installation Instructions Manual

Page 1
Supplied By www.heating spares.co Tel. 0161 620 6677
FERROLI F30
Gas Combination Boiler for Central Heating
and Hot Water Production, Wall Mounted,
Copper Heat Exchanger, Fan Assisted,
Electronic Flame Ignition and Control
REAR FLUE INSTALLATION
Appr. nr. B99.06 A - CE 0461 BM 0607
INSTRUCTIONS
G.C. NO: 47-267-32
3544016/0 - JDL 10/04
Page 2
Supplied By www.heating spares.co Tel. 0161 620 6677
FERROLI F30
For installation (back flue connection):
For direct back flue connection it is necessary to use the optional kit Part No 822186, and it is necessary to alter
the fan direction inside the boiler. Please Follow the below procedure carefully:
Remove fan by pulling off electri­cal connections. Pull off air pres­sure switch tubes from the air pressure switch remove 2 screws b. Rotate the fan downward to disengage it from the securing pin (a).
Fig. 21a
Remove the four screws which fix the back plate onto sealed cham­ber, remove and rotate the plate through 90° and fit it to the top of the boiler to cover the original flue outlet. Secure it in place with the four screws removed previously. (fig 21b 21c) Attach the flue adaptor (A) to the rear of the appliance using the ring seal and four screws supplied (fig 21d)
Remove and disgard the fan adaptor and heat­shield
Fig. 21b
Fig. 21c
Fig. 21d
Remove fan mounting plate by undoing the three fixing screws "d". Rotate the fan through 90° so that the fan nozzle points sideways. Secure the fan to the plate in the new position using screws in position "c". Attach the fan spigot adapter "B" using the two screws "E" provided. NOTE: The spigot must be sealed using high temperature silicone, not supplied.
E
Fig. 21e
Fig. 21f
Fig. 21g
Page 1
Page 3
Supplied By www.heating spares.co Tel. 0161 620 6677
Back flue outlet (Diagram 1-9)
FERROLI F30
1. Core drill 127mm hole (5").
Fig. 22a
6. Cut the outer flue 80mm longer than the inner wall finish.
Fig. 22f
2. Push through the outer flue.
Fig. 22b Fig. 22c
7. Insert the aluminium flue pipe into white plastic outer flue, making sure the aluminium pipe sits fully and centrally into the flue termi­nal. Mark the aluminium flue pipe at the point it is flush with the plastic outer flue, add 60mm to this mark and cut the aluminium inner flue pipe at this point.
NOTE: Ensure the end is cut square
de-burred & lubricated with sili­cone grease.
3. Gently pull back until wall seal is flush with the wall.
60mm60mm
Fig. 22g
8. Ensure that the inner metal flue is pushed into the terminal, as shown.
9. Lift boiler onto the wall bracket with flue in place, and engage the outer flue into the adapter. Secure the boiler using the nuts & washers supplied.
60mm
Fig. 22h Fig. 22i
9. Make sure the inner flue is fully engaged in the flue terminal, Re-attach the fan as shown in fig 21h. Secure bottom of boiler using two screws and washers provided.
Page 2
Page 4
Supplied By www.heating spares.co Tel. 0161 620 6677
FERROLI F30
Re-attach the fan with the screws (b). Refit wiring connections to fan and air pressure switch tubes ensuring correct orientation. I.E. red tube to air pressure switch connection with red dot (+) and clear tube to air pressure switch connection with no paint marking (-). (Clear hose to fan venturi) Fit the fan into the boiler rotating the front to engage with the mountin lug. Secure with the screws b.
NOTE
Mounting plate rests
on lower lug.
Air pickup Venturi
NOTE: The rear flue application does NOT require any flue restrictor ring to be installed. The maximum flue distance for this application is 1 meter with NO bends being permissible. When testing the appliance, if the boiler does not ignite, but the fan runs continuously, then it woul be advisa­ble to check the orientation of the air pressure switch hoses.
Fig. 21h
FOR FURTHER INFORMATION PLEASE CALL OUR INSTALLER TECHNICAL
HELP LINE
TEL O8707 282885 OPTION 1
Page 3
Loading...