1
Size: 2
Tamaño: 65 a 250 mm (2
Dimensions : 65 mm à 250 mm (2,5 po à 10 po)
2" - 10" (65-250mm)**
1
2 a 10 pulg.)
** Metric Dimensions are nominal pipe diameter. This product is produced with ASME/ANSI flanged end connections.
** Las dimensiones métricas representan el diámetro nominal de la tubería. Este producto está fabricado con conexiones ASME/ANSI embridadas.
** Les dimensions métriques correspondent au diamètre nominal du tuyau. Ce produit est fabriqué avec des raccordements d'extrémité à brides ASME/ANSI.
Series 876V / Serie 876V / Série 876V
ENGLISH INSTRUCTIONS
!
WARNING
Read this Manual BEFORE using this equipment. Failure to read and follow all safety and use information can result in death,
serious personal injury, property damage, or damage to the equipment. Keep this Manual for future reference.
!
WARNING
You are required to consult the local building and plumbing codes prior to installa­tion. If the information in this manual is not consistent with local building or plumb­ing codes, the local codes should be followed. Inquire with governing authorities for additional local requirements.
!
WARNING
Need for Periodic Inspection/Maintenance: This product must be tested periodically in compliance with local codes, but at least once per year or more as service conditions warrant. All products must be retested once maintenance has been performed. Corrosive water conditions and/or unauthorized adjustments or repair could render the product ineffective for the service intended. Regular checking and cleaning of the product’s internal components helps assure maximum life and proper product function.
Installation Instructions
1. Consult local codes for specific installation requirements and restrictions applicable to your area. It is recommended that system supply pressure be at least 20psi (138 kPa).
2. These instructions apply to Series 870V/876V, and LF870V/LF876V/876VST sizes 21⁄2" to 10" (65-250mm) only. The valves may be installed only in the orienta­tion/flow direction as shown. All 870V/876V and LF870/LF876V/876VST assemblies are shipped in the horizontal installation orien­tation only. The gate valves may be rotated as permitted by the flange bolt pattern.
3. The valve assembly must be installed where it is accessible for periodic testing and maintenance. Clearances shown in the installation views apply to exterior, interior and pit/vault installations and are only rec­ommendations. These minimums do not apply to removable protective enclosures. Refer to local codes for actual requirements in your area.
4. PRIOR TO INSTALLING THE VALVE INTO THE LINE, FLUSH THE SUPPLY LINE OF ALL FOREIGN MATERIAL. Failure to flush the supply line may cause the check valves to become fouled and require disassembly and cleaning.
5. Lift the assembly by connecting lift hooks to the lift rings cast into the valve body. DO NOT LIFT THE ASSEMBLY BY CONNECTING TO THE GATE VALVE HANDWHEELS OR STEMS. The use of the optional valve setters (horizontal units only) provides for a rigid connection to the sup-
ply line (with the correct centerline) without the need for concrete thrust blocks.
6. For vertical installation, loosen bolts on the groove coupling just enough to allow rotation of the outlet check. Rotate outlet check 180º. Ensure that the vertical support adapter is in place (valve is shipped with adapter banded in place) and install pipe support (pipe support to be furnished by the customer and shall fit same size pipe as the valve being installed, except 21⁄2" (65mm) valves will use a 3" pipe support).
NOTICE
THE VALVE BODY AND PIPE SUPPORT ARE INTENDED TO SUPPORT THE WEIGHT OF THE SECOND CHECK VALVE AND OUTLET GATE VALVE ONLY. THE PIPING ABOVE THE OUTLET GATE VALVE MUST BE SUPPORTED INDEPENDENTLY. Retighten bolts of groove coupling. Rotate outlet gate valve as desired – required.
6a. For vertical installation of the DCDA, first
remove formed tube from bypass piping, then follow instructions outlined in No. 6 above. When this has been completed, rotate the compression fitting elbow 180º and reinstall the tube, rotating the pipe tee now at the bottom of the outlet check to align with tube.
7. After installation SLOWLY fill the assembly with water and bleed air from the body using the # 3 and # 4 test cocks. Test the valve assembly to ensure correct operation.
2
NOTICE
All assemblies are tested at the factory for proper operation and leakage. If the valve does not pass the field test, it is most likely due to a fouled check valve. This is not covered by the factory warranty. The valve cover(s) must be removed and the check seats inspected and cleaned. Any damage or improper operation caused by pipeline debris or improper installation/start-up is not included in the factory warranty. In case of a possible warranty claim, contact your local supplier or FEBCO Representative. DO NOT REMOVE THE VALVE ASSEMBLY FROM THE PIPELINE.
Typical Installation
Figure 1
18" Min. (450mm)
18" Min. (450mm)
Refer to
Local Codes
8. The assembly must be protected from freezing and excessive pressure increases. Thermal expansion or water hammer can cause pressure increases. These excessive pressure situations must be eliminated to protect the valve and system from possible damage.
NOTICE
The flange gasket bolts for the gate valves should be retightened during installation as the bolts may have loosened due to storage and shipping.
N-PATTERN INSTALLATION FOR THE DC SERIES 870V/ LF870V & FOR THE DCDA SERIES 876V/ LF876V/ 876VST
(Shown with Strainer)
6" Min.
18" Min. (450mm)
(150mm)
Figure 2
FLOW
18" Min. (450mm)
18" Min. (450mm)
Refer to
Local Codes
FLOW
VERTICAL INSTALLATION FOR THE DC SERIES 870V/LF870V & FOR THE DCDA SERIES 876V/ LF876V/ 876VST
(Shown with Strainer)
3
Pipe Support
(Furnished by Customer)
Service and Mainternance
General
1. Detailed maintenance manuals are available from your local Febco representative.
2. Rinse all parts with clean water prior to
reassembly.
3. DO NOT USE ANY PIPE DOPE, OIL, GREASE OR SOLVENT ON ANY PARTS unless instructed to do so.
Check Valve Disassembly
4. Do not force parts. Parts should fit together freely. Excess force may cause damage and render the assembly inoperable.
5. Carefully inspect seals and seating surfaces for debris or damage.
6. After servicing, repressurize the assembly and test to ensure proper operation.
1. Close the outlet shutoff valve, then close the inlet shutoff valve. Bleed residual pressure from the assembly by opening the #4, #3, and # 2 test cocks in this sequence.
2. Remove the cover bolts/nuts and lift the cover from the body. The springs are retained and the cover should be pushed away from the body approximately inch.
1
4
3. Inspect/clean debris from the disc and seat ring. Replace worn or damaged parts as required.
4. Replace the cover, ensure the spring assembly is positioned in the pivot socket. If necessary, apply FDA approved grease to the O-ring groove in the body to keep the O-ring in position while installing the cover.
5. Install the bolts and nuts and tighten.
Test Procedure for Double Check Valve Assemblies
FEBCO recommends the use of the appropriate annual test method presented in the ASSE Series 5000 manual that is consistent with your local codes.
Troubleshooting
PROBLEM CAUSE SOLUTION
1. Check valve leaking a. Debris on seating surface Disassemble and clean b. Leaking shutoff valve Disassemble and clean
2. Low flows passing through a. Mainline check fouled Disassemble and clean mainline valve (DCDA). b. Bypass line plugged Disassemble and clean