Extron electronics RWM 2 Installation Manual

Page 1
IMPORTANT:
complete user guide and installation
instructions befor
touchpanel to the power sour
RWM 2 • Installation Guide
www.extron.com
Go to www.extron.com for the
e connecting the
Overview
The RWM 2 is an accessory kit allowing the TLP Pro 725M and TLP Pro 1025M touchpanels to be installed directly into drywall. This guide provides instructions for experienced professional installers to mount and install the TLP Pro 725M or TLP Pro 1025M using the RWM 2.
ATTENTION:
All structural steps and electrical installation must be performed by qualied personnel in accordance with local and
national building codes and electrical codes.
Toute étape structurelle et installation électrique, doit être effectuée par un personnel qualié, conformément aux codes du
bâtiment, aux codes incendie et sécurité, et aux codes électriques, locaux et nationaux.
ce.
CDD
C
EU EU
MK
FFAA
TOP
BB
BB
NORTH
EE
AMERICA
MK
Front View Back View
Figure 1. RWM 2
Screws to turn locking arm (4)
A
Magnets (7*)
B
*The RWM 2 ships with six magnets attached to the front and a spare attached to the back, as shown in
Figure 1. The spare magnet can be moved to the front if extra support is needed.
NORTH
AMERICA
EUEU
2-gang EU junction box adaption
C
1-gang North America junction box
E
adaptation, horizontally mounted
1-gang MK junction box adaption
D
Locking arms (4)
F
Page 2
RWM 2 • Installation Guide (Continued)
TOP
Back View
TLP Pro 725M
Touchpanel Mounting Plate
Lock Screw
e
1
6
5
3
4
RWM 2
2
RWM 2
Figure 2. Installing a TLP Pro 725M with the RWM 2
Before You Start
Decide where you want to mount the touchpanel. A cut-out template for the RWM 2 is available at www.extron.com and provides dimensions of all the components to be installed.
1. Use the template to cut a hole in the drywall (see figure 2,
The RWM 2 is suitable for drywall that is 0.50” to 1.00’’ (12.7 mm to 25.4 mm) thick.
2. Route cables to the hole.
) that is 4.29" H x 6.14" W (109 mm H x 156 mm W).
1
If local building codes require cables to be run through conduit to a junction box, then the RWM 2 can be used with a standard 2-gang EU junction box, 1-gang MK junction box, or a horizontally mounted 1-gang North America junction box, (Extron JB 125). The junction box must be purchased separately.
Both the TLP Pro 725M and 1025M include #6-32 screws and M3.5 screws.
Mounting the RWM 2 Directly to Drywall
1. Run a PoE/Ethernet cable through the RWM 2.
2. Ensure the locking arms (
3. Use a Philips-head screwdriver to turn and tighten the locking arms. The locking arms will hold the RWM 2 securely, but
) are lying at against the top and bottom of the RWM 2, and insert it into the hole.
2
should not be over-tightened.
Mounting a TLP Pro Touchpanel
1. The touchpanel mounting plate has four hooks (
t into touchpanel’s two rear slots (see the TLP Pro 525, 725, and 1025 Series User Guide).
2. Slide the TLP Pro 725M or 1025M down slightly, so the hooks are secure in the slots.
3. The tongue at the bottom of the mounting plate (
touchpanel to the mounting plate by tightening the lock screw (6).
4. After the TLP Pro touchpanel has been assembled, connect the ethernet cable to the rear port on the touchpanel (see the
TLP Pro 525, 725, and 1025 Series User Guide)
5. Place the touchpanel against the RWM 2. Strong magnets on the RWM 2 hold the touchpanel in place.
) one on each corner. Position the TLP Pro 725M or 1025M, so the hooks
3
) sits in the groove at the bottom of the touchpanel (5). Fasten the
4
© 2018 Extron Electronics All rights reserved. All trademarks mentioned are the property of their respective owners. www.extron.com
68-3235-01 Rev. B
06 18
Loading...