Extron Electronics EWB 710 User Manual

EWB 710 • Installation Guide
Overview
The Extron EWB 710 wall box is an optional accessory for mounting the TLP 710MV touchpanel onto the surface of various wall types (such as drywall, wood, or masonry) where it is not possible to embed the touchpanel in the wall. The EWB 710 has knockouts that accept raceways or conduit for running cables over the surface of the wall to the touchpanel.
Planning
The following items are required for installation, but are not supplied:
z Extron TLP 710MV
z Four mounting screws (Extron
recommends a minimum length of 1 inch)
z Power drill
z Drill bit that is appropriate for
wall type
z Conduit or surface raceway to carry cables
z Screwdriver
z Level
IMPORTANT:
Refer to www.extron.com for
the complete TLP 710 Series
user guide before connecting
the product to the power source.
Extron EWB 710
Extron TLP 710MV
Extron TLP 710MV
Faceplate
Wall Box
Mounting Suggestions for Different Wall Types
Choose a type of screw or bolt that is appropriate for the wall on which you are mounting the EWB 710 (see table below). The mounting holes in the back of the EWB 710 accommodate screws up to ¼ inch in diameter.
Wall Type Fasteners Min. Size
Drywall Toggle bolts 3/16 inch 4 1/2 inch Min. 3/8 inch
Wood (solid wall or stud)
Masonry Masonry
Wood screws #10 screw
screws
Fastener
with a washer
1/4 inch 4 3/16 inch
Quantity Drill Bit
Size
4 1/16 inch
wood bit
masonry bit
Notes
wall thickness
Min. 3/8 inch wall thickness
Do not mount to masonry joints
EWB 710 • Installation Guide (Continued)
EWB 710
E
on
Mounting the EWB 710
1. Decide where to mount the EWB 710. If
mounting to standard wood wall studs, locate the center of the studs.
2. Place the EWB 710 against the wall at the
mounting location. Use a level to ensure the box is horizontal and mark the position of the four holes.
3. If required, drill four holes into the wall.
4. Insert four screws (see the table on the previous
page) and attach the EWB 710 to the wall.
5. Remove the required knockout and run conduit
or raceway to the EWB 710.
6. Run cables through the conduit and the EWB 710 knockout.
Mounting the TLP 710MV
1. Remove the faceplate from
the Touchpanel.
2. Attach the cables to the
back of the TLP 710MV (see the TLP 710MV and TLP 710TV User Guide).
3. Secure the TLP 710MV to
the EWB 710 using the four 6-32 screws provided.
4. Configure the Touchpanel
as described in the
TLP 710MV and TLP 710TV User Guide.
5. Snap the faceplate into
position (four clips on each side).
5
Extron TLP 710MV
Faceplate
2
3
Extron TLP 710MV
4
Mounting Screws (4)
Extron
xtr
Wall Box
Extron USA - West Headquarters
+800.633.9876
Inside USA and Canada Only
+1.714.491.1500 +1.714.491.1517 FAX
Extron USA - East
+800.633.9876
Inside USA and Canada Only
+1.919.863.1794 +1.919.863.1797 FAX
Extron Europe
+800.3987.6673
Inside Europe Only
+31.33.453.4040 +31.33.453.4050 FAX
Extron Asia
+800.7339.8766
Inside Asia Only
+65.6383.4400 +65.6383.4664 FAX
Extron Japan
+81.3.3511.7655 +81.3.3511.7656 FAX
© 2011 Extron Electronics All rights reserved. www.extron.com
Extron China
+400.883.1568
Inside China Only
+86.21.3760.1568 +86.21.3760.1566 FAX
Extron Middle East
+971.4.2991800 +971.4.2991880 FAX
68-2151-01
Rev. A 09 11
Loading...