Configuration and ConnectionsHughes Installation
SYSTEM 4xi
PROJECTOR COMMUNICATIONS KIT
ATTENTION!
PLEASE READ THIS DOCUMENT FOR IMPORTANT
INSTALLATION INSTRUCTIONS
THIS KIT HAS BEEN SHIPPED WITH THE FOLLOWING COMPONENTS:
Kit Type: HUGHES
Included Communications Adapter(s):
Quantity Part Number Description
1 26-467-01 ADP, UNV, “A”
THE TABLE BELOW LISTS THE POSSIBLE CONFIGURATION(S) AND CORRESPONDING
COMMUNICATIONS ADAPTER(S) FOR YOUR PROJECTOR MANUFACTURER’S VARIOUS
MODELS. PLEASE NOTE THAT YOUR SWITCHER HAS BEEN CONFIGURED AS
INDICATED BY THE “✔” IN THE “CONFIG AS” COLUMN. IF YOUR PROJECTOR MODEL
DIFFERS FROM THIS CONFIGURATION, YOU MUST RECONFIGURE YOUR SWITCHER
WITH THE CORRECT SETTINGS.
PLEASE REFER TO THE FOLLOWING PAGES FOR COMPLETE CONFIGURATION AND
SIGNAL CONNECTION INSTRUCTIONS.
THIS SWITCHER HAS BEEN CONFIGURED FOR: HUGHES
CONFIG MODEL SW1 SW2 SW3 SW4 SW5 SW6 PROJ COMM
AS 1 2 3 4 CABLE ADAPTER
✔ Hughes-JVC off on off on 0 0 5 6 0 J15 26-467-01
Hughes DILA off on off on 0 0 8 F 0 J15 26-467-01
Extron • System 4xi Switcher Series • User’s Manual • P/N 68-412-02 Rev. A
Hughes Installation Configuration and Connections
Connecting System 4xi to Hughes/JVC Projectors
If the System 4xi is already configured for a Hughes/JVC projector, go to step 4.
If it is not set up correctly, it will be necessary to change switch settings on the
System 4xi ’s Main Controller Board. Begin at Step 1 to verify the correct
configuration.
1. Use the Front Panel to display the Information Menu to verify that the System 4xi
is already set up for the Hughes/JVC projector. Apply power to the System 4xi
and do the following:
[System 4 model and software
version displayed here]
(See note.)
(See note.)
(See note.)
(Note: Information depends on
stem 4 setup.
S
(See note.)
a. Press
b. Press
c. Press
d. Press
}
yours will show the System 4xi model name, the software version and the
following information:
PRJ = HUGHES
PRJ BAUD = 19200
UNIT No.= 000
HST BAUD = 9600 (value depends upon setup Menu 3)
to display the MENU SELECT on the LCD screen.
or to step to Menu 8.
to select this menu.
or to display the configuration. The example to the left is general,
2. Go to the procedure on page 2-3 to remove the System 4xi cover and then go to
page 2-4 to set up the Main Controller board. Return to Step 3 (below) when the
configuration is correct.
Config Projector SW1: 1-2-3-4 SW2 SW3 SW4 SW5 SW6 Prj Cable Comm
as Adapter
✔ Hughes-JVC off-on-off-on 0 0 5 6 0 J15 26-467-01
SW3
SW5
SW2
SW4
3. Double-check your work and be sure the System 4xi cover is on securely.
4. Install the System 4xi in its place of operation (i.e. rack), but do not connect the
power cable.
__________ Changes in some switch configurations are not detected until the power is
removed at the AC cord, and then restored.
Follow the correct cable connection diagram for your Hughes projector and
continue the installation.
5. The UNV ADP, “A” (26-467-01) has two 9-pin connectors, one male and one
female. Plug the 9-pin female connector onto the 9-pin male marked “Control
Out” (Port B) on the Hughes projector back panel.
Extron • System 4xi Switcher Series • User’s Manual • P/N 68-412-02 Rev. A
J15
SW1
4
3
2
1
ON
Page 1
6. Plug the 15-pin HD connector of the Projector Communications Extension cable
(CC 50' or CC 100') into the PJ Comm port on the System 4. The other end has
a 9-pin female connector. Plug this end into the other 9-pin male D connector on
the HU COM adapter.
______ Secure all of the connector screws.
7. Plug the (4 or 5) BNC connectors from one end of the (user-supplied) RGBS/HV
cable onto the System 4 output and those on the other end onto the matching
BNCs on the Hughes panel. See cable diagram in Figure 2-18a or 2-18b.
____________ If installing the Hughes HJT 100/200, you must also follow the special setup
instructions on page 4.
System 4xi - Hughes/JVC Model 300/400 Series Connections
Use illustration below as a guide when connecting the System 4xi to a Hughes/
JVC model 400 projector. Refer to Hughes/JVC documentation to continue the
installation.
Configuration and ConnectionsHughes Installation
ADP UNV "A"
26-467-01
"A"
Connecting the System 4xi to a Hughes/JVC Model 400 Projector
____________ In a rack mount, do NOT allow the weight of the cables to be supported by the
xi
System 4
. See page 2-5 for cabling guidelines.
Extron • System 4xi Switcher Series • User’s Manual • P/N 68-412-02 Rev. A
Page 2