1. Handling
The pump must be lifted and handled carefully by means of the handle and the lifting holes.
2. Usages
3. Usage Limits
EN 60335-2-41 standard prohibits using the pump in tanks or swimming pools that contain people, and obligates the use of the versions with a 10m cable for outdoor use.
Fluid Temperature: ≤ 35°C
Note: The pumps must be submerged until the minimum submersion depth.
4. While installing the pump
The size of the pit must be at appropriate dimensions to prevent frequent operation and the floater should be adjusted carefully.
5. Electrical Connection
The pumps must be used with an ETNA Evo -1/7.5 electrical panel.
Maximum diameter of the suspended solids (mm)
EFP 30 EFP30D EFP30V EFP30T
…………. 6 20 40
Page 3
3
www.etna.com.tr
6. Control of the Direction of Rotation
The correct direction of rotation is clockwise when looking at the pump from above. Observe and check the pump performance. With the correct direction of rotation, high Q/H performance is ensured with single channel and double channel versions, and a low absorption rate is provided with vortex wheeled versions.
7. Maintenance
Please make sure that you power o if any maintenance is required on the pump and call an expert for the maintenance operation.
The pump does not require any routine maintenance. Cleaning the suction filter (EFP 30D, EFP V) or the wheel may be required. Remove the screws that hold the filters to access the wheel on the models with filters.
8. Safety Information
• The pump is not suitable for pumping flammable or dangerous liquids.
• Do not use the energy cable to carry or lift your pump.
• Do not run the pump dry (out of the water).
• Since the pump runs and stops automatically, do not put your hands or other objects in
between when it is connected to the mains.
• Pay attention to the limitations of use. Inappropriate use may damage the pump or
people.
• Ensure that the network voltage conforms to the value on the label.
• If the pump is three-phase, have the connections to the electric grid and the earthing
socket conducted by an expert (authorized electrician).
• Use a sensitive phase relay (0.03A) as extra protection against electric shocks.
• Restrict the access of individuals, who are not authorized to maintain the pump.
• Use the pump within the usage limits defined on the label.
• Protect the pump against freezing.
• Protect the pump against potential blockages.
• We recommend that you wear gloves during any action conducted on the pump.
Page 4
4
9. Troubleshooting
The motor starts running but the pump does not transfer. Make sure that water level is not
very low and the suction nozzle or the discharge pipe is not clogged.
If the transfer of the pump is reduced. Check for blockages and check the accuracy of the rotation direction on the three-phase models.
If the pump runs intermittently.
- The floater switch adjusted wrong.
- The container of the pump is very small.
- The current withdrawn from the electrical panel is high.
- The pump or the pipes are clogged.
10. Noise
If the pump runs partially under water, the noise level should be less than 70 db(A), but this value is not applicable when the pump runs completely under water.
11. Immersion Sledge
The immersion sledge is a fitting that provides ease of installation and maintenance in cases where the pump is required to run on a fixed point. As seen on diagrams 12 and 13, thanks to its sledge system, the pump is easily suspended into a well using a chain through its stainless steel guide pipes and when it is directly across from the flange located at the bottom of the sledge, it sits onto the discharge flange, and is ready for operation. Discharge of the chamber, where the pump is located, is not required during this process.
When maintenance is required, the pump is pulled up using a chain, cleaned by spraying clean water onto it with a hose, easily taken out, and the maintenance operation is performed. The pump is lowered into the well on the sledge again after maintenance and is ready for operation. It is recommended to use a strong chain when suspending the pump down on the sledge.
Page 5
5
www.etna.com.tr
Sledge sole bracket
Sledge upper fixation bracket
Pump and sledge slider
MODEL CONNECTION DIAMETER SUITABLE PUMP MODELS
Sledge System
Mounting Kit
G2” EFP30 - EFP30D
12. Accessories
Page 6
6
13. Installation Diagram
TYPE
DIMENSIONS (mm)
Af Bf Cf Cp Df1 Df2 Dp2 DNt Gf Hf l1 l2 ls Ls mf Mf DNm
EFP 30 195 185 530 210 220 530 410 3/4 ” 100 130 110 100 58 104 390 490 50
EFP 30D 195 185 530 210 220 530 410 3/4 ” 100 130 110 100 58 104 390 490 50
EFP 30V 195 185 530 210 220 530 410 3 /4 ” 100 130 110 100 58 104 390 490 50
EFP 3OT 525 220 110 385 485 65
Mf
Cf
mf
Cp
Hf
Af
Gf
Bf
Dp2
Df2
Df1
Is
Ls
12
I1
I2
16
Mf: (for continuous operation) the lowest level mf: the lowest operation level
Page 7
7
www.etna.com.tr
14. Pump Sledge Well Assembly
UNIT(S)
600
415
565
665
700
L50*50
ANGLE BRACKET
EARTH
**
CONCRETE WELL
NOTE: Concrete well can be in the desired size. However, the well top should be 620x585 so that the sledge well cover supplied by our firm can be mounted. Cover chassis is fitted into the well top, and doweled from inside.
DUBEL
113 100
565
600
41550100
700
CONCRETE WELL
195
EARTH
183 195
665
700
HINGE
150
565
BALL CHECK VALVE
L50*50
ANGLE BRACKET
565
665
50
150 415
700
665
5x10 Metal sheet will be welded to the entire frame
HINGE
COVER
2mm DKP
665*700
400
415
665
CONCRETE
565
L50*50
ANGLE BRACKET
585
620
WELL TOP
585x620
SLEDGE TOP BRACKET
SLEDGE TOP BRACKET
SLEDGE FIXED BRACKET
585
WELL TOP
620
CONCRETE WELL TOP
585
CONCRETE WELL TOP
**
**
** Alternative connection
DUBEL HOLE
575
CONCRETE SURFACE
VALVE
UNION
A
DETAIL A
Page 8
Dudullu Organize Sanayi Bölgesi 2. Cadde No: 14 34775 Ümraniye-Istanbul / Turkey Tel: +90 (216) 561 47 74 (Pbx) • Fax: +90 (216) 561 47 50
www.etna.com.tr • [email protected]
customer service
After-Sales Services
We are here for you with our more than 35 years of sector experience, 97 service points all around Turkey, and customer-oriented after-sales service approach (commissioning, maintenance and repair, spare part supply).
Loading...