![](/html/24/2443/2443b9c4c729a1b6c7dd7da0d95c97f1cd189a86e6821fe9441833d3e2a67d59/bg1.png)
ETC Installation Guide
Unison Paradigm® Occupancy Sensor
Occupancy Sensor Installation Guide Page 1 of 8 Electronic Theatre Controls, Inc.
Corporate Headquarters Middleton, Wisconsin, USA Tel +608 831 4116 Service: (Americas) service@etcconnect.com
London, UK Tel +44 (0)20 8896 1000 Service: (UK) service@etceurope.com
Rome, IT Tel +39 (06) 32 111 683 Service: (UK) service@etceurope.com
Holzkirchen, DE Tel +49 (80 24) 47 00-0
Service: (DE) techserv-hoki@etcconnect.com
Hong Kong Tel +852 2799 1220 Service: (Asia) service@etcasia.com
Web: www.etcconnect.com
Copyright © 2016 ETC. All Rights Reserved.
Product information and specifications subject to change
. ETC intends this document to be provided in its entirety.
7184M2160 Rev C Released 2016-07
Overview
The Unison Paradigm® Occupancy Sensor is a ceiling mounted sensor that
utilizes passive infrared (PIR) technology, providing reliable vacancy and
occupancy detection for lighting control. Paradigm Occupancy Sensors
integrate with Paradigm lighting control systems, providing energy efficient
lighting control solutions.
Each sensor is available in neutral white or black finish. Lens masks are
provided to allow customized occupancy detection fields as required by each
installation.
Wire Specification
The Paradigm Occupancy Sensor utilizes LinkConnect to power the sensor and
to provide data to and from the connected Paradigm control system.
LinkConnect is topology-free and polarity independent. You can install your
data runs in any desired combination of bus, star, loop, and home-run. ETC
recommends using Belden 8471 (or equivalent) wire. The total combined
length of a LinkConnect wire run may not exceed 1,640 feet (500m), with a
maximum distance of 1,312 feet (400m) between any two devices.
All control wiring should be installed and terminated by a qualified installer
and should follow standard wiring installation practices and meet local codes.
Leave approximately 10 inches (254mm) of wiring in the junction box or tied
back in the ceiling to allow for wiring connections and future service needs.
Note:
ETC requires that all sensors be grounded by using a 14 AWG
(2.5mm
2
) ESD drain wire.
The Paradigm Occupancy Sensor provides 360 degree coverage
of the installed location and is available in three models:
• P-OCC-SR- Occupancy Sensor with small room lens
covers 450 sq. ft. at 8 ft. (41.8m
2
at 2.4m) / 800 sq. ft. at
12 ft (74.3m2 at 6.65m).
• P-OCC - Occupancy Sensor with standard room lens
covers 1,800 sq. ft. at 8 ft. (167m
2
at 2.4m)/ 3,000 sq. ft.
at 12 ft. (279m2 at 6.65m).
• P-OCC-HC - Occupancy Sensor with high ceiling lens
covers 350 sq. ft. at 12 ft. (32.5m
2
at 2.4m)/ 7,000 sq. ft.
at 40 ft. (650m2 at 12.2m)
![](/html/24/2443/2443b9c4c729a1b6c7dd7da0d95c97f1cd189a86e6821fe9441833d3e2a67d59/bg2.png)
ETC Installation Guide
Occupancy Sensor
Occupancy Sensor Installation Guide Page 2 of 8 Electronic Theatre Controls, Inc.
Installation Environment
Paradigm Occupancy Sensors are intended for installation to a finished ceiling
surface, ceiling tile mounted, attached to a round fixture junction box or
single-gang RACO switch box. The sensor operates in ambient temperatures
of -10°C to 40°C, non-condensing humidity.
ETC recommends paying special attention to the installation environment:
• The sensor must have an unobstructed view of the room. Do not mount
behind or near tall cabinets, shelves, hanging light fixtures, etc.
• Do not install the sensor within eight feet from an HVAC airflow duct /
vent.
• Install the sensor where it cannot easily sense movement in areas
outside of the intended space, such as hallways, glass partitions, or
adjacent rooms. If the installation location cannot avoid these
conditions, portions of the lens can be masked to block the sensor view
of these undesired areas. Reference Lens Masking on page 5.
Parts and Supplies
The following parts and supplies are included with the Unison Paradigm®
Occupancy Sensor ordered:
Installation
The Paradigm Occupancy Sensor is provided with a twist-lock mounting plate
that can be mounted to a junction box, finished ceiling or soft ceiling tile.
Determine the installation method and follow the detailed instructions:
• See “Junction Box Installation” on page 3.
• See “Soft Ceiling Tile Installation” on page 4.
• soft ceiling tile adapter • 3 position WAGO connectors
• LinkConnect & ESD ground
wire pigtails
• 2 each screws, 6-32 x 3/4” and
1 3/4”
• 3 each lens masks (spare)
Note:
The LinkConnect pigtail and WAGO connectors (provided) are
only required when the sensor is installed in series with other
stations or sensors. If you are not continuing the data run, direct
termination on the control board is recommended.
![](/html/24/2443/2443b9c4c729a1b6c7dd7da0d95c97f1cd189a86e6821fe9441833d3e2a67d59/bg3.png)
ETC Installation Guide
Occupancy Sensor
Occupancy Sensor Installation Guide Page 3 of 8 Electronic Theatre Controls, Inc.
Junction Box Installation
Step 2: If you are installing the sensor in series with other sensors
or stations (continuing the data run), use the provided
LinkConnect pigtail, ESD ground pigtail and WAGO connectors
to make the terminations. If you are not continuing the data
run, proceed to step 3.
a: Strip 3/16” (5mm) of insulation from each installed LON
wire.
b: Open the three terminal levers on a WAGO connector
and insert the installed (typically black) Belden 8471
LinkConnect wire, the black lead from the sensor pigtail,
and the continuing Belden 8471 (typically black) wire into
the terminals.
c: Close the levers onto the wires.
d: Repeat the above for the installed (typically white) Belden
8471 LinkConnect wire and the remaining pigtail from
the sensor, and repeat for the ESD ground wires. Use a
new WAGO connector for each termination type.
Step 3: Orient the smooth side of the mounting plate to the junction
box and pull the Belden 8471 and the 14 AWG (2.5mm
2
) ESD
ground wire from the junction box through the provided holes
near the center of the mounting plate.
Step 4: Secure the mounting place to the junction box using the screws
provided (both short and long screws are included for
convenience).
terminate
wires here
Step 1: Pull the Belden 8471 (or equivalent)
and 14 AWG (2.5mm
2
) ground wire
to the junction box.
in
s
t
a
l
le
d c
o
n
trol
w
ire
i
n
st
a
l
l
e
d con
trol
wire
t
o
ne
x
t st
ati
on
sensor pigtail