ESAB LKB 160 Instruction manual

LKB 160
112101103105107109111102021110025108024042106023061104022041100020040060001
Bruksanvisning Brugsanvisning Bruksanvisning Käyttöohjeet Instruction manual Betriebsanweisung Manuel d’instructions
Gebruiksaanwijzing Instrucciones de uso Istruzioni per l’uso Manual de instruções
ПдзгЯет чсЮуещт
Instrukcja obs³ugi
Valid for serial no. --xxx--xxxx0349 301 023 GB
1. DECLARATION OF CONFORMITY .................................................................................................... 32
2. SAFETY ............................................................................................................................................... 32
3. INTRODUCTION................................................................................................................................... 33
3.1 TECHNICAL DATA .......................................................................................................................... 33
INSTALLATION ................................................................................................................................... 34
4.
4.1 MAINS SUPPLY ............................................................................................................................... 34
4.2 UNPACKING .................................................................................................................................... 34
4.3 ASSEMBLY OF UNIT ...................................................................................................................... 34
5. OPERATION ........................................................................................................................................ 35
5.1 CONTROLS AND INDICATORS ..................................................................................................... 35
6. MAINTENANCE ................................................................................................................................... 36
6.1 CLEANING ....................................................................................................................................... 36
7. SPARE PARTS ORDERING ................................................................................................................ 36
8. ACCESORIES ...................................................................................................................................... 36
8.1 TRANSFORMER FOR CO
ASSEMBLY INSTRUCTION .............................................................. 36
2
8.2 METER ASSEMBLY INSTRUCTION .............................................................................................. 37
9. SCHEMATIC DIAGRAM ...................................................................................................................... 94
10. SPARE PARTS LIST ......................................................................................................................... 95
31
1 DECLARATION OF CONFORMITY
DECLARATION OF CONFORMITY
Esab Welding Equipment AB, S-695 81 Laxå, Sweden, gives its unreserved guarantee that welding rectifier LKB 160 from serial number 032 complies with standard IEN 60974-1, in accordance with the requirements of directive (73/23/EEC) and addendum (93/68/EEC) and with standard EN 50199, in accordance with the requirements of directive (89/336/EEC) and addendum (93/68/EEC).
---------------------------------------------------------------------------------------------------------------------------------­ Laxå 2000-11-07
Anders Birgersson Managing Director Esab Welding Equipment AB 695 81 Laxå Sweden Tel: +46 584 81 000 Fax: +46 584 123 06
2SAFETY
WARNING !
ARC WELDING AND CUTTING CAN BE INJURIOUS TO YOURSELF AND OTHERS. TAKE PRECAUSIONS WHEN WELDING. FOLLOW SAFETY INSTRUCTIONS OBLIGATORY IN A COMPANY, PREPARED ACCORDING TO EQUIPMENT MANUFACTURER’S RECOMMENDATIONS.
ELECTRIC SHOCK – can kill
Install equipment in accordance with obligatory standards.
Do not touch live electrical parts with bare skin, wet gloves or wet clothes.
Ensure your work position is safe.
FUMES AND GASES – can be dangerous to your health.
Keep your head away from fumes.
Use ventilation and/or extraction to keep fumes and gases away from your breathing zone and
surroundings.
ARC RAYS – can injure eyes and skin.
Protect your eyes and skin. Use suitable welding screens, filter lens and wear protective clothes.
Protect bystanders with suitable screens or curtains.
FIRE HAZARD
Sparks (spatter) can cause fire. Therefore make sure there are no inflammable materials nereby.
INAPPROPRIATE OPERATION OF EQUIPMENT – if unit operates in a faulty way, consult a trained technician.
READ AND COMPREHEND THE INSTRUCTION MANUAL BEFORE
INSTALLING AND OPERATING UNIT
PROTECT YOURSELF AND OTHERS!
32
3 INTORDUCTION
The LKB 160 is step-switched welding power unit, intended for welding with solid filler wires of steel, stainless steel or aluminium, and cored wires with or without shielding gas.
3.1 TECHNICAL DATA
Standard delivery:
Power source equipped with spot welding function, adjustable burnback time and creep start function. Wire feed mechanism with feed roller for solid wire, diameter 0,6 – 0,8. Welding torch PSF 160 3m Return cable 4,5m with return clamp Mains cable 3m and gas hose 1,5m
Set includes: handle (with screws), shelf for gas cylinder (with screws), chain, bracket (with screw), cable strip.
Mains voltage 1x230 V, 50/60Hz Mains fuse 16 A delayed Rated power consumption 5,7 kVA Rated welding current Duty cycle* 45% 130 A
Duty cycle* 60% 112 A
Duty cycle* 100% 87 A Welding current range Open circuit voltage 18÷28 V Enclosure class IP 23 Application class
28A/15,4V÷130A/20,5V
Dimensions Length
Width Height
Weight 73,5 kg
*Duty cycle is based on 10-minute period. Duty cycle 45% means that after 4,5 minutes of unit operation, 5,5 minutes brake is required. Duty cycle 100% means that the unit can work continuously.
Warning:
The unit is characterised by the following:
- Enclosure class IP 23 indicates that the unit is designed for indoor and outdoor use.
- Application class S means that the unit is designed for use in areas of elevated electric hazard.
770 520 620
33
4 INSTALLTION
Installation shall be executed by competent and authorised person. Connect the mains cable and protect it with appropriate fuse in conformance with local regulations. Unit must be protected from dust, dirt and overheating. A distance of minimum 300 mm must be kept between the LKB 160 and other obstacles that may block air-flow through the unit.
4.1 MAINS SUPPLY
Voltage 230V
1~ 50/60 Hz
Rated primary current:
P100% 8A
P60% 10A
P45% 22A
Mains cable cross-section 3x1,5mm
Fuse, slow-blow 16A
4.2 UNPACKING
2
A. Unpack the equipment and check that there is no obvious damage. Notify supplier (distributor) if any
faults or damage are apparent.
B. Check if no parts are left in packing before disposal.
C. Check if all ventilation openings are opened and unblocked.
4.3 ASSEMBLY OF UNIT
34
5 OPERATION
5.1 CONTROLS AND INDICATORS
Fig.5.1 LKB160 front panel view
Fig.5.2 View of control panel in wire feed unit compartment for LKB.
A. POWER ON/OFF SWITCH AND WELDING VOLTAGE ADJUSTMENT – Turning this switch to one of
seven positions ‘1÷7’ applies power to the unit. The green LED diode (B) will illuminate indicating that power is supplied to the equipment. Cooling fan will also be switched on. Welding voltage adjustment is carried out by means of turning this switch.
WARNING: Operating this switch during the welding process (loaded power source) can cause
damage to unit!
B. OVERHEATING The orange signal LED diode will illuminate in the event of overheating. The welding
output is automatically disabled until the LKB reaches normal temperature. Should this indicator illuminate leave the power source a few minutes to cool down. Do not switch the power source off as this will remove the power from the cooling fans. The unit will be ready to resume welding when the orange indicator has turned off.
C. DIGITAL METER indicates actual values of current or welding voltage. The toggle switch allows you to
select either voltage or current display. The LKB160 is supplied without a meter. The meter kit is supplied as an optional extra and has a last reading hold facility.
35
D. POTENTIOMETER with switch – to switch on spot welding and impulse time (for spot welding) – in the
range of 0,5 ÷ 4 s.
E. POTENTIOMETER to set wire feed speed (in the range of 1,4 ÷ 19 m/min).
F. POTENTIOMETER of burnback time regulation .
G. CONNECTION (Euro connection) to connect welding torch
H. OUTPUT SOCKET to connect return cable with clamp
I. MODE SELECTOR: CREEP START 50% - 100% - 70%
6 MAINTENANCE
WARNING: All guarantee obligations of producer are nullified if customer attempts to repair any
faults by himself.
6.1 CLEANING
The LKB 160 should be regularly blown down with dry, compressed air at a low pressure. If unit is used in dirty or dusty environment it shall be cleaned more often. Otherwise ventilation openings can be blocked which can result in overheating.
7 SPARE PARTS ORDERING
When ordering spare parts, please state machine type, serial number, designation and spare part number as shown is spare parts list. It will simplify dispatch and ensure you get the right part.
8 ACCESSORIES
Transformer kit for CO2 0349 302 080 V/A meter kit 0349 302 078
8.1 ASSEMBLY INSTRUCTION OF GAS HEATER TRANSFORMER FOR CO
Take off side panels of unit.
Fasten transformer T3 and terminal block XG in places marked with arrows.
Connect wiring of transformers T3 with components according to schematic diagram of unit.
2
36
1- Transformer T2 2- Transformer T3 3- Terminal block XG 4- W iring for Q1 and T2
8.2 V/A METER ASSEMBLY INSTRUCTION
Take off side panels of unit.
Fasten meter’s board to front panel of unit.
Assemble cover of meter to partition of unit.
Disassemble rectifier bridge.
Disconnect current cable (+) from the bridge.
Connect shunt and bus according to diagram.
Connect shunt and bus to (+) end of rectifier bridge and next connect current cable (+) to free end of
shunt.
Assemble rectifier bridge in unit.
Connect wiring of meter according to schematic diagram of LKB 160.
1- V/A-Meter A2 2- Shunt RI 3- Bus 4- W iring for board A1 5- W iring for transformer T2 6- W iring for shunt and current socket (-) 7- Current cable (+) 8- Current socket (-) 9- Rectifier bridge V1
37
Loading...