Emerson EasyHeat SR Trace SR52J, EasyHeat SR Trace SR51J Installation & Operation Manual

SR Trace
Heater Cable for Roof & Gutter Deicing SR51J & SR52J Heater Cable Installation & Operation
DESCRIPTION
Easy Heat’s SR51J and SR52J heater cables prevent ice dam build-up which can damage buildings and gutters. The cables’ self-regulating
heat output provides additional benets:
Lower energy consumption. The cable reduces its power output as the ice and snow disappear.
High temperature limited. The cable reduces its temperature as it warms, so this minimizes the effect of heat on the temperature sensitive roof materials.
Use only Easy Heat connection and accessory kits to ensure your installation is safe and conforms with electrical code requirements. SR Trace cables are generally suitable for use on asphalt or wood
shingles, metal roong or “membrane” type roong. Consult roong
supplier for details.
Principle of Operation
As snow accumulates on a roof in winter, inadequate ceiling insulation and/or roof venting can allow the roof surface above heated areas of the building to get warm enough to melt some of the snow on the roof surface, even on cold winter days.
This water will then ow down the roof and may accumulate and freeze in gutters, possibly even overowing them and forming long
icicles. (Icicles are usually a symptom of this “warm roof” problem. It can be expected that roofs with icicles will eventually form ice dams which may result in water leaking into the building.)
Left unchecked, this ice build-up (icing) can result in signicant stress on the gutter, often leading to mechanical failure of the gutter.
It is also probable that the roof area above the overhang will be cold, since it is not above a heated area of the building. This can result in the re-freezing of the melt-water as it approaches the roof edge, forming a layer of ice.
ACCESSORIES
ZH-C Roof Clips are used for all types of installations.
DSH Downspout Hangers support the heater cable descending a
downspout drain. One hanger is required for each downspout. Cable must be looped to the bottom of downspout and back up, utilizing a downspout hanger to prevent cable from being pulled tight against the drain/gutter edge.
SRP Power Connection Kit connects power to heater cable
and terminates tail end of cable.
SRSRG Splice Kit splices two pieces of cable together. This may be
required when a longer circuit is needed or to repair a damaged segment of cable. (Plan splice location to avoid long-term submersion.)
Additional accessories are available.
Continued freezing of this water causes the layer of ice to build up in thickness and eventually can become several inches thick. This results in water “ponding” at the warm/cold transition point of the roof, and migrating under the shingles.
Once water gets under the shingles, it can leak through the roof sheathing, at nail holes or other roof penetrations, and down inside the building walls, ceiling, etc. It is also possible for such water to track along ceiling beams and eventually leak into the building interior at
light xtures or through the ceiling nish at a point some distance away
from the location of the ice dam.
By applying heating cable from the roof edge to a level just above the overhang, and in the gutter and downspouts, melt-water on the roof will have a clear drainage path.
WARNINGS!
Installation of SR Heater Cable for roof and gutter deicing must be in accordance with the requirements of all applicable electrical and
building codes and regulations. Ground-fault protection must be provided. The braid shield must be effectively grounded by a properly-sized equipment grounding conductor or other approved means.
Do not twist bus wires together – this will result in a short circuit and damage the cable.
Moisture must be kept away from the live electrical parts of the cable or electrical faults will develop.
Damaged heater cables must be repaired or replaced.
Do not place ladders against the heater cable.
Minimum Installation Temp: -40°C (-40° F).
©2015 EasyHeat www.easyheat.com 14031-001 Rev. 10
Specication/Application Information
Performance and Rating Data
Catalog Number SR51J SR52J
Voltage (VAC) 120 208/240/277
Nominal Power Output in Ice (W/ft) 8.0 7.0/8.0/10.0
Maximum Single Cable Length (ft) 190 381
Current Load (Amp/ft)
at 0°F (-20°C) start-up .132 .066
at -20°F (-30°C) start-up .147 074
Minimum Installation Temp: -40° F (-40°C)
Perform Maximum total Heater Length (ft)/Circuit Breaker Rating 20°F(-7°C)/0°F(-20°C)/-20°F(-30°C) Start-up ance and Rating Data
Catalog Number SR51J SR52J
15 Amp Breaker
20 Amp Breaker
30 Amp Breaker
125/115/100 250/225/205
170/150/135 335/300/270
250/225/205 500/455/405
The use of ground fault equipment protection for heating cable applications is required by NEC.
Cable Sizing
The total heater cable length for deicing is determined by including all elements of the roof system that need protection. Use the following charts to determine the total length of cable.
Table 1: Determination of Total Cable Requirements
Items Cable Required
Roof Edge
Gutter
Downspout
Roof Valley
Dormer Perimeter
From Table 2 based on eave overhang
1 ft of cable per foot of gutter (if gut-
ter is wider than 6", use 2 traces)
2 ft of cable per foot of downspout– cable is looped down and back
6 ft of cable per valley–loop 3' up val­ley and back
1 ft of cable per foot of dormer pe­rimeter
Cable Control
The Easy Heat SR cable can be controlled in several different ways. The simplest method is to use a standard wall switch, turning the switch on only when snow/ice melting is required. It is recommended that a pilot light also be installed to remind the user when the cable is energized.
Table 2: Cable Length Factors vs. Roof Overhang
Eave
Overhang
"E"
12" 18" 1.9 2.5
24" 30" 2.7 3.5
36" 42" 3.6 4.5
48" 54" 4.6 5.5
Cable length required = Length Factor x Roof Length
Loop
Height
"H"
Length Factor
Shingle Roof
Length Factor
Metal Roof
(Note 3)
1. Standard shingle roof (see diagram pg. 4).
2. Metal roof (see diagram pg. 4).
3. Cable length calculated above does not include cable for gutter or downspout.
For other designs, contact representative.
It is also possible to install controls which automatically sense when show/ice melting is required, energizing cables accordingly. Contact Easy Heat for details.
www.easyheat.com
Loading...