Elkay HTHB-HRFER User Manual

Page 1
HydroBoost® In-Wall Bottle Filler
Satisfying Thirsts Since 1912
MODEL: HTHB-HRFER
GENERAL
In-wall, recessed bottle lling station paired with the single Contour™ refrigerated fountain.
HYDROBOOST® BOTTLE FILLING STATION
In-wall, recessed design with solid lower panel. Quick ll rate is 1.1 gallons per minute. Includes laminar ow to provide a clean ll with minimal splash and easy maintenance. Equipped with automatic 20-second shut-off timer. User interface design makes touchless operation intuitive. Key plastic components are integrated with silver ion anti-microbial protection to inhibit growth of mold and mildew.
Designed with hinged top and bottom stainless steel panels for easy access and service.
GREEN COUNTER™
Visually displays count of plastic bottles saved from waste. (Based on
20 oz. bottles.)
FOUNTAIN
Features contoured basin and softly rounded corners and edges.
HALSEY TAYLOR DOUBLE BUBBLER™
Exclusive one-piece, chrome-plated two-stream mound-building bubbler with non-removable anti-squirt feature and integral hood insures a satisfying drink of water.
AUTOMATIC STREAM HEIGHT REGULATOR
Self-closing assembly is located inside unit to prevent tampering. Unit resists corrosion and liming. A constant stream height is automatically maintained under line pressures that vary from 20 to 105 psi.
PUSHBUTTON ACTUATION
Self-closing, vandal-resistant pushbutton does not require grasping or twisting.
MOUNTING FRAME
Manufactured from corrosion resistant, galvanized steel. Open construction designed for ease of installation. Mounting frames can be shipped in advance for rough-in installation.
with Filtered Model HTHB-HRFER
HRF Fountain
With Bottle Filler
Rated for Indoor Use Only
Stainless Steel Finish Only
SUGGESTED SPECIFICATIONS
Model HTHB-HRFER provides 8.0 gph of 50°F water at 90°F ambient and 80°F inlet water. Bottle ller shall be recessed design and include electronic sensor activation with 20-second automatic water shut-off. Shall provide
1.1 gpm ow rate with laminar ow to prevent splashing. Shall include anti-microbial protected plastic components to prevent mold and mildew. Shall include visual display of plastic bottles saved from waste. Fountain shall have rounded corners and contoured basin, designed with easy to operate pushbutton. Shall include SJ8 water chiller. Shall meet ADA guidelines for visual and motion disabilities, when properly installed. Shall be lead-free design which meets the Safe Drinking Water Act and is certied to NSF/ANSI 61 and 372, UL 399 and CAN/CSA 22.2 No. 120.
Each HTHBWF-HRFER is shipped in 5 cartons including:
HYDROBOOST Station with Solid Lower Panel
HRF-ER Fountain
Mounting Frame (2)
Cooling Unit – SJ8
CAPACITIES CHART
Model
HTHB-HRFER 115V / 60Hz 8 GPH 4.0 260 123 lbs.
Note: Continued product improvement makes specication subject to change without notice. See Halsey Taylor website for most current spec Sheet.
Voltage /
Hertz
Chilling**
Capacity
HALSEY TAYLOR, 2222 Camden Court, Oak Brook, IL 60523
F.L.
Amps
halseytaylor.com
Rated Watts
Approx.
Ship
Wt.
UL399 and
CAN/CSA 22.2
No. 120
Certied
ADA
COMPLIANT
NSF/ANSI
61 and 372
Certied
SPEC00315 06/2015
Page 2
Model HTHB-HRFER HydroBoost® In-Wall Bottle Filler
Refer to diagrams for rough-in of plumbing and electrical sources. The support frame is to be installed rst. Hang upper Bottle Filler panel to hanger on frame. Water service lines, waste lines and electrical are assembled as required. The bottom panel is attached last, after a nal check for leaks and correct functions of Bottle Filler. (For details see the installation instructions. )
INSTALL (2) SCREWS (P/N 111008343890) IN FRAME BEFORE INSTALLING IN OPENING
MOUNTING INSTRUCTIONS:
FRAME
5/16" SCREWS OR BOLTS (10 REQ'D-NOT PROVIDED)
40"
1016mm
4 1/2"
114mm
NOTE: A service stop (not included) must be installed at the fountain inlet line. NOTE: P-Trap (not supplied) to be installed per local building code. NOTE: For wall support required locations see installation instructions provided with panel and fountains.
CAUTION - Bottle Filler must be securely bolted to wall.
IMPORTANT: DOUBLE STUD OR 3 INCHES (76 mm) BETWEEN MOUNTING FRAMES IF PLACED NEXT TO ANOTHER BOTTLE FILLER, FOUNTAIN OR WALL
WOOD OR STEEL FRAME SHOWN (NOT PROVIDED)
18 3/4" 476mm
FLOOR LINE
BACK OF WALL TO
8” (203mm)
BE 12" (305mm)
MIN DEPTH
MIN DEPTH
Satisfying Thirsts Since 1912
DOUBLE STUD OR 3" (76mm) BETWEEN MOUNTING FRAMES IF PLACED NEXT TO ANOTHER FOUNTAIN OR WALL
Rated for Indoor Use Only
OPERATING PRESSURES:
Supply water - 105 psi maximum
Minimum 40 psi supply line pressure required in special circumstances where both Bubbler and Hydroboost are in use simultaneously to ensure adequate stream height.
ELECTRICAL
Hydroboost® station equipped with electric cord
and three-prong molded rubber plug for use with 15-amp minimum receptacle. For the cooling unit, a junction box for a (3) wire, 10 amp branch circuit is provided. Rated at 115 volt, 60 Hz, single phase.
TOP & SIDE VIEWS
9 3/8" 238mm
18 3/4" 476mm
ACTIVATION SENSOR
®
FRONT VIEW
19 3/4"
1 3/16" 30mm
38 7/8" 988mm
32 11/16 831mm
502mm
17 3/8" 441mm
FINISHED FLOOR
Job Name: ______________________________
Date: __________________ Qty. ____________
Contact Info (Name, Phone, Email): __________
________________________________________
________________________________________
Approval: _______________________________
1 3/16" 30mm
20 3/8" 518mm
20 7/16" 519mm
27" 682mm
WALL LAYOUT
2 7/8" 73mm
25 1/4" 642mm
FINISHED FLOOR
8"
203mm MINIMUM DEPTH
4" 102mm
8" (203mm) MINIMUM FOR DRAIN ACCESS TO BOTTLE FILLER ELECTRICALS
BACK WALL LINE
1-1/4" (32MM) WASTE TUBE
FURNISHED
25 7/8" 658mm
Page 2
Printed in the U.S.A.
Page 3
Model HTHB-HRFER Filtered Contour™ Fountain
WALL OPENING
IMPORTANT: It is necessary to create a wall opening 18 3/4” W x 37 3/4” H and 4 1/2” above the oor line.
MOUNTING INSTRUCTIONS
Refer to rough-in for location of plumbing and electrical sources. The support frame is to be installed rst. The shelf for the water chiller should be assembled to the wall frame, and then place chiller into position. Hang upper fountain panel to hanger on frame. Fountains are to be attached to panel and wall frame. Water service lines, waste lines and electrical are assembled as required. The bottom panel is attached last, after a nal check for leaks and correct functions of fountains and chiller. (For details see the installation instructions.)
Installation required trap to be install in wall. Trap and service stop not included.
OPERATING PRESSURES:
Supply water - 105 psi maximum
5/16" SCREWS OR BOLTS (10 REQ'D-NOT PROVIDED)
HOOK RODS (2) P/N 101567443730
CREWS OR BOLTS
S (NOT PROVIDED)
FRAME
37 3/4" 959mm
4 1/2
114mm
I
MPORTANT: DOUBLE STUD OR 3 INCHES (76mm) BETWEEN MOUNTING FRAMES IF PLACED NEXT TO A BOTTLE FILLER UNIT
1" 25mm
WOOD OR STEEL FRAME SHOWN (NOT PROVIDED)
ELECTRICAL INLET LOCATION ON CHILLER
8"
203mm
TO FLOOR LINE
Satisfying Thirsts Since 1912
ELECTRICAL DATA
Junction box for a (3) wire 10 AMP branch circuit. Standard 120 volt, 60 Hz, single phase.
TOP & SIDE VIEWS
3 1/8"
1 1/8" 29mm
B
79mm
A
5 5/8" 143mm
Rated for Indoor Use Only
INSTALL (2) SCREWS (P/N 111008343890) IN FRAME BEFORE INSTALLING IN OPENING
CHILLER SHELF P/N 27638C
FRONT VIEW
19 3/4" 502mm
12 1/8" 308mm
18 3/4" 476mm
130mm
FLOOR LINE
20 3/8" 518mm
20 7/16"
519mm
5 1/8"
BACK OF WALL TO
BE 12" (305mm)
MIN DEPTH
33 1/2" 851mm
ADA REQUIREMENT
WALL LINE
WALL LAYOUT
27" 686mm
18" 457mm
9 3/8" 238mm
12" 305mm
MINIMUM DEPTH
5/8" 16mm
BACK WALL LINE
C
31 1/4" 794mm
D
LEGEND:
A = 1/4” O.D. TUBE CONNECT (CHILLER WATER OUTLET) B = 3/8” O.D. TUBE CONNECT (CHILLER WATER INLET) SHUT OFF VALVE BY OTHERS C = 1-1/2” WASTE TUBE (ELBOW & TRAP NOT PROVIDED)
D = ELECTRICAL INLET
Page 3
FINISHED FLOOR
1" 25mm
11" 279mm
4 1/2" 114mm
8" 203mm
Printed in the U.S.A.
Loading...