Elkay HRC4-20W-1C Installation Manual

HRC4-20W-1C
Installation Instructions
HRC4-20W-1C
Refrigeration Packages
NOTICE: This water cooler must be connected to the water supply using a dielectric coupling.
NOTE: It is important to insure proper ventilation. Allow a minimum clearance of 12 inches (305 mm) in front and 3 inches (76mm) in the rear of the unit. If unit is to be installed in an enclosure, allow the following clearances around unit - 1 inch (25mm) each side, 3 inches (76mm) in the rear, 3 inches (76mm) above wall.
This chiller has been designed for use with potable water and includes an o-ring seal on the drain plug. The fitting should be replaced if the unit is to be used with more aggressive fluids.
For use with photo processing applications, adjust cold control to warmer settings.
LEGEND
A = 3/8" O.D. TUBE WATER OUT
B = 3/8" O.D. TUBE WATER INLET
C = 3/8" O.D. TUBE TANK DRAIN
97646C (Rev. B - 2/04)
ITEMIZED PARTS LIST
ITEM
PART NO.
NO.
1
50196C
2
28180C
3
23101C
4
23104C
5
28178C
6
28179C
7
23089C
8
28175C
9
27957C
10
28176C
11
30235C
12
30768C
13
30812C
14
35882C
15
35895C
16
35921C
17*
36074C
18
30233C
19
30234C
20
66632C
21
66625C
22
70772C
23
66204C
24
66629C
25
36079C
26
35845C
27
35846C
28
30560C
29
70482C
30
70483C
31
70274C
*INCLUDES RELAY & OVERLOAD. IF UNDER WARRANTY, REPLACE WITH SAME COMPRESSOR USED IN ORIGINAL ASSEMBLY. NOTE: All correspondence pertaining to any of the above water cooler or orders for repair parts MUST include model number and serial number of cooler, name and part number of replacement part.
DESCRIPTION
Grommet Panel Insulation Box (Rear) Panel End Box Insulation (Front) Terminal Box Grille Cover Terminal Box Rear Panel Cover Insulation Box Base Ass'y Terminal Cover Solenoid Valve Overload Cold Control Cold Control Freeze Protect Capacitor Compressor Service Pak Overload Spring Clip Compressor Condenser Evaporator Drain Plug Drier Heat Exchanger Relay Cap-Capacitor End Bracket-Capacitor Terminal Cover Male Connector Fitting Elbow Fitting Compressor Mounting Sleeve
HRC4-20W-1C
INSTALLATION
1. Potable water inlet and outlet are 3/8" (9 mm) O.D. tube located on top of unit. Water cooled condenser inlet and outlet are 3/8" (9 mm) O.D. tube located on right front of unit. Installer to provide air gap at condenser water outlet to comply with local plumbing specifications. Contractor to supply connections as required.
2. Connecting lines to be of copper, thoroughly flushed to remove all foreign matter before being connected to cooler. If flushing does not remove all particles, a water strainer should be installed in supply line.
3. Connect cooler to building supply line with a shut-off valve and install a union connection between the valve and cooler.
4. Electrical: Make sure power supply is identical in voltage, cycle, and phase to that specified on cooler serial plate. Never wire compressor directly to the power supply
START-UP
1. Open supply line valve.
2. Purge air from all water lines by operating bubbler valve of fountain.
3. Connect to electrical power.
TROUBLE SHOOTING & MAINTENANCE
Temperature Control: Factory set for 50° F water under normal
conditions. To adjust water temperature, turn screw on Item No. 14
clockwise for colder, counter clockwise for warmer. Ventilation: Cabinet louvers should be periodically cleaned with brush,
air hose or vacuum cleaner. Excess dirt or poor ventilation can cause no cold water and compressor cycling on the compressor overload protector
Lubrication: Motors are lifetime lubricated.
WIRING DIAGRAM
24
9
14
15
7
5
3
20
21
23
2
12
30
29
8
11,13,18, 19, 25, 28
4
16, 26, 27
1, 31
22
10
17
6
97646C (Rev. B - 2/04)
Loading...