Elkay HRC4-20W-1B Installation Manual

HRC4-20W-1B
Installation Instructions
HRC4-20W-1B
Refrigeration Packages
NOTE: It is important to insure proper ventilation. Allow a minimum clearance of 12 inches (305 mm) in front and 3 inches (76mm) in the rear of the unit. If unit is to be installed in an enclosure, allow the following clearances around unit - 1 inch (25mm) each side, 3 inches (76mm) in the rear, 3 inches (76mm) inches above wall.
For use with photo processing applications, adjust cold control to warmer settings.
LEGEND
A = 3/8" O.D. TUBE WATER OUT
B = 3/8" O.D. TUBE WATER INLET
C = 3/8" O.D. TUBE TANK DRAIN
97562C (Rev. A - 4/00)
ITEMIZED PARTS LIST
ITEM
PART NO.
NO.
1
100806740570
2
19037000
3
23088C
4
23100C
5
23101C
6
23104C
7
26706C
8
26707C
9
26708C
10
26709C
11
27597C
12
28108C
13
30235C
14
30768C
15
35880C
16
35882C
17
35895C
18
35977C
19*
35986C
20
30233C
21
30234C
22
66226C
23
66563C
24
70772C
*INCLUDES RELAY & OVERLOAD. IF UNDER WARRANTY, REPLACE WITH SAME COMPRESSOR USED IN ORIGINAL ASSEMBLY. NOTE: All correspondence pertaining to any of the above water cooler or orders for repair parts MUST include model number and serial number of cooler, name and part number of replacement part.
DESCRIPTION
Grommet Clip Bracket Conduit Panel Insulation Box (Rear) Panel End Box Insulation (Front) Terminal Box Grille Cover Terminal Box Rear Panel Cover Insulation Box Base Ass'y Terminal Cover Solenoid Valve Overload Cold Control Cold Control Freeze Protect Capacitor Compressor Service Pak Overload Spring Clip Compressor Condenser Evaporator Drain Plug
HRC4-20W-1B
INSTALLATION
1. Potable water inlet and outlet are 3/8" (9 mm) O.D. tube located on top of unit. Water cooled condenser inlet and outlet are 3/8" (9 mm) O.D. tube located on right front of unit. Installer to provide air gap at condenser water outlet to comply with local plumbing specifications. Contractor to supply connections as required.
2. Connecting lines to be of copper, thoroughly flushed to remove all foreign matter before being connected to cooler. If flushing does not remove all particles, a water strainer should be installed in supply line.
3. Connect cooler to building supply line with a shut-off valve and install a union connection between the valve and cooler.
4. Electrical: Make sure power supply is identical in voltage, cycle, and phase to that specified on cooler serial plate. Never wire compressor directly to the power supply
START-UP
1. Open supply line valve.
2. Purge air from all water lines by operating bubbler valve of fountain.
3. Connect to electrical power.
TROUBLE SHOOTING & MAINTENANCE Temperature Control: Factory set for 50° F water (+/- 5°) under normal
conditions. For colder water, adjust screw on item no. 16 CW.
Ventilation: Cabinet louvers should be periodically cleaned with brush,
air hose or vacuum cleaner. Excess dirt or poor ventilation can cause no cold water and compressor cycling on the compressor overload protector
Lubrication: Motors are lifetime lubricated.
WIRING DIAGRAM
23
4
6
11
16
17
18
9
7
22
5
14
10
19
13,15,20 21
3
97562C (Rev. A - 4/00)
24
12
8
1,2
Loading...