Elkay ERPB8C Installation Manual

ERPB8C, ERPBV8C, LRPB8C
:
:
INSTALLATION, CARE & USE MANUAL
TM
SWIRLFLO Refrigerated fountains with FLEXI-GUARD
INSTALLER
TM
!
CAUTION
!
WARNING
!
WARNING
NOTE: It is common practice to ground electrical hardware such as telephones, computers and other devices
to available water lines. This can, however , cause electrical feedback in the plumbing circuit, which results in an “electrolysis” effect occurring in the fountain. This may result in water which has a metallic taste to it or has a noticeable increase in the metallic content of the water .
When inspecting plumbing circuit, remember the line may be grounded some distance from the installation, and may occur outside the building or area in which the unit is being installed.
This condition can be avoided (in most cases) by using recommended materials during installation. Any drain fittings provided by the installer should be made of plastic which will electronically isolate the fountain from the remainder of the building’s plumbing circuits.
Review these instructions before beginning installation. Be sure that installation conforms to all plumbing, electrical and other applicable codes.
When installation is complete, ensure these instructions are left in the plastic bag provided inside the installed unit for future reference.
Service to be performed by authorized service personnel only .
Page 1
97923C (Rev. D - 3/05)
ERPB8C, ERPBV8C, LRPB8C
Model LRPB8C
LEGEND A = 1/4” O.D. Tube - Water Outlet Connection B = 3/8” O.D. Tube - Water Inlet Connection C = 1-1/4” Waste Tube D = ELECTRICAL INLET
97923C (Rev. D - 3/05)
Figure 1 - Rough-in Dimensions
Page 2
TO BUBBLER
24
CHILLER OUTLET
Figure 2 - Chiller Installation
24
25
26
ERPB8C, ERPBV8C, LRPB8C
REQUIRED TOOLS AND MA TERIALS
These tables show special tools and/or additional materials (not provided) which are necessary to complete installation of these units:
Item Description Quantity
Item Description Quantity
1 Unplated copper inlet pipe 2 Service Stop
1. Install chiller: Remove front panel of chiller. Remove
and discard cardboard inner pack from between compressor and side panel. Slide chiller onto the
shelf and position it to the left as per dimensions in Figure 1.
Note: Building construction must allow for adequate air flow on both sides, top and back of chiller. A minimum of 4” (102mm) on both sides and top is required. See chiller installation for additional instructions.
2. Make water supply connections. Install a shut-off valve
CHILLER INLET
and union connection to building water supply (valve and union not provided). Turn on water supply and flush the line thoroughly.
Special Tools
NONE
Additional Materials
TO BUBBLER
24
CHILLER
OUTLET
Figure 3 - ERPB Tube Routing
24
25
25
Figure 4 - LRPB Tube Routing
24
WATER
INLET
3. ERPB Models: Make connection between remote chiller and building supply line. Inlet port is marked on the chiller (1/4” O.D. copper tube). Bend the copper tube (provided) at an appropriate length from chiller to opening in frame. Install the in-line strainer (provided with chiller) by pushing it until it reaches a positive stop, approximately 3/4” (19mm) on the marked chiller inlet port. Connect building supply line to strainer. (See Figure 3)
Caution: DO NOT SOLDER tubes inserted into the strainer as damage to o-rings may result.
4. LRPB Models: Mount filter head assembly to side of chiller (See Figure 4). Make connections between filter and building supply line (3/8” O.D. tube not porvided). Inlet port is marked on the chiller (1/4” O. D. copper tube). Install a 1/4” x 1/4” union (provided) on the marked chiller inlet port. Insert the 1/4” poly tubing (provided) into the fitting on filter and connect the union to the chiller. (See Figure 4)
Caution: DO NOT SOLDER tubes inserted into the strainer as damage to o-rings may result.
Page 3
97923C (Rev. D - 3/05)
Loading...
+ 5 hidden pages