9.5 UPS presets and their possibilities
1. Ensure, that the UPS is not yet switched-on „Ein“.
Push the switch-on button and scroll with button
for about 3 seconds down, the buzzer resounds two times, the LCD-
display indicates drawing Q1, the UPS is now in installation mode.
2. The rest of the installation possibilities, except of the buzzer (drawing
Q1 and Q2), can be changed by pushing the button to scroll forward.
The drawings S1 and S2 define the tolerance window of the bypass input,
this can be 184 V ~ 260 V or 195 V ~ 260 V.
Drawing T defines the tolerance window of the bypass frequency of the
inverter output; the acceptable values are ±3Hz and ±1Hz.
Drawing U defines the valid inverter output voltage, whose voltage is 200
V, 208 V, 220 V, 230 V or 240 V.
The drawings V1, V2, V3 and V4 define the service modes of the UPS.
Following choices are possible: online-mode, eco-mode (more economical)
and fixed frequency with 50Hz or 60Hz output.
Drawing W defines the installation of the inverter output, which can be
calibrated as follows:0%, +1%, -1%, +2%, -2%, +3% or -3%.
drawing X defines a fix address and position of the UPS, when it is in
parallel mode. Adjustable values from 1 up to 4.
drawing Y defines the total sum of the UPS-systems in parallel service.
Adjustable values are possible from 1 up to 4.
3. If all changes of the basic setting have been made, you have to push
to be able to store them (drawing Z). Then the LCD-display indicates
drawing AA. If you do not want to change this setting, you can push the
button off „AUS” for 5 seconds, afterwards the LCD-display changes
directly over to drawing AA. This means, that the change of the settings
have been canceled.