Dunkirk ESC-3090S, ESC-4125S, ESC-4125ST, ESC-5185S, ESC-3090ST Installation, Operation & Maintenance Manual

...
Dmkj'
ESC IV STEAM SERIES 4
OIL-FIREDCASTIRON BOILER
MODELS
ESC-3090S
ESC-3090ST
ESC-4125S
ESC-4125ST
ESC-5185S
ESC-5185ST
ESC-6210S
ESC-6210ST
INSTALLATION, OPERATION &
MAINTENANCE MANUAL
,,,,, .... ., ,uJq,ll_lllj_p i_,
"1,u,,,_,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
PATENT 7,823,544
/\_ /
_' M,E 1
H
Manufactured by:
ECR International, Inc.
2201 Dwyer Avenue. Utica NY 13501 web site: www.ecnnternat/onal.com
P/N 240009804, Rev. A [10/2012]
Figure #1
35,3/4"
A,S,M,E
RELIEF
PRESSURE
VALVE
ELWC[]
CYCLE GUARD
OIL BURNER
PRESSURE
ESC-3090 163/8'' 61/2'' 6" ESC-4125 20¼" 81/2'' 6" ESC-5185 23%" 101/2' 7"
ESC-6210 271/2'' 85/16'' 8"
Boiler model number on rating plate includes suffix 'S' or 'ST'.
STANDARD EOUIPMENT: Crated boiler, flush jacket, oil burner,
target wall/liner, safety valve, steam water level gauge, steam pressure gauge, steam pressure control, low water cut-off, drain valve, wiring harness, burner electric disconnect, plastic cover, 2" supply tapping, 11/2'' return tapping, skim port, and primary control.
(NOTE: For tankless heater units, add tankless hot water coil, and low limit control.)
Boiler Model 1 3 M n Natura Draft
. O,IBurnerInput() INetAHRIRat,ngs()l _:. _ I
_umoer _mmney b_ze
Capacity A.RU.E.
WITHOUT WITH .... I ..... (2) MBH(4) I Steam ' Sq. Ft. I _ . I _ . Rating
TA.K'ESS,TANKLESS._'"" I 'v'°" I I MBH SteamI "°un°I _quareI
ESC-3090S ESC-309OST o.9o 126 106 80 333 6 8"x8"x15' 82.0
ESC-4125S ESC-4125ST 1.25 175 147 110 458 6 8"x8"x15' 82.0
ESC-5185S ESC-5185ST 1.85 259 216 162 675 8 8"x8"x15' 82.0
ESC-6210S ESC-6210ST 2.10 294 247 185 771 8 8"x8"x15' 82.0
NOTES:
1)Burner input is based on an oil heating value of 140,000 Btu/gal.
2)MBH = 1000 Btu per hour [Btu = British Thermal Unit].
3)Net AHRI Steam Ratings based on piping and pick-up allowance of 1.333. Consult manufacturer before selecting boiler for installations having unusual piping and pick-up requirements, such as intermittent system operation, extensive piping, etc.
4)Electrical service is 120 Volts, 15 Amps, 60 Hz
ESC-3090ST 2 11 ESC-4125ST 13
ESC-5185ST 15 ESC-6210ST 17
iLine
Dimensions ........................................................ 2
Ratings, Data ..................................................... 3
Safety Symbols .................................................. 4
IMPORTANT: Read and understand the following instructions COMPLETELY before installing.
Locating The Boiler ............................................. 5
Ventilation And Combustion Air ............................ 6
Supply And Return Piping .................................... 8
Venting System Inspection & Installation ............. 12
Oil Tank And Piping ........................................... 13
Electrical Wiring ............................................... 14
Operating Instructions ....................................... 16
Maintenance Procedures .................................... 19
Service Checklist .............................................. 21
KEEP THIS MANUAL NEAR BOILER
RETAIN FOR FUTURE REFERENCE
Installations of boilers and venting shall be done only by qualified expert and in accordance with this manual. Installing or venting a boiler or any other gas appliance with improper methods or materials
could result in serious injury or death due to fire or to asphyxiation from poisonous gases such as
carbon monoxide which is odorless and invisible.
Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids.
Do not obstruct air openings to boiler room.
Modification, substitution or elimination of factory equipped, supplied or specified components could
result in personal injury or the loss of life.
i_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!_!!iii__iiiiiiiiiiiiiiii_i!_!i_iii!:_ii!i!_ii!i!_i_!i_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!_i!iiiii!iiiiiiiliiiiiii!i!i!ii!iliow.er InstaIIationandserviceofthisboilermust
The following defined symbols are used throughout this manual to notify reader of potential hazards of varying risk
levels. Installer - Leave all instructions with the boiler for
be performed by a qualified installer.
future reference.
Indicates a hazardous situation which, if not
avoided, WILL result in death or serious injury.
Indicates a hazardous situation which, if not avoided, could result in death or serious injury.
,i_ CAUTION
Indicates a hazardous situation which, if not
avoided, could result in minor or moderate injury.
Indicates information which should be followed to ensure proper installation and operation.
When this product is installed in the Commonwealth of Massachusetts the installation must be performed
by a Licensed Plumber or Licensed Gas Fitter.
PATENT 7,823,544
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilUiLi_!_i_ii_!iiliNiii_ii!i!i!ii!ii!i_ii_iililEi!ii!ii!ii!il!!iili_il!_ii!_ii!ii_iii_ili_iiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiiiiiiiii_iiiiiiiiii
Installations shall conform to the requirements of the authority having jurisdiction. Such applicable requirements take precedence over the general
instructions of this manual.
Where required by the authority having jurisdiction, the installation must conform to the American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME No. CSD-1.
Fire hazard. Do not install boiler on combustible
flooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS ONLY Boiler must not be installed on carpeting or vinyl flooring.
Minimum clearances to combustible construction are:
Locate boiler in front of final position before removing crate.
Provide level solid base as near chimney as possible and centrally located with respect to heat distribution system as practical.
Allow 24 inches in front, top and right hand side for servicing and cleaning, or removing tankless water heating coil.
Recommend 24 inches be allowed in back of boiler for convenience when skimming hole is used.
When installed in a utility room, the door should be wide enough to allow largest boiler part to enter, or to permit replacement of another appliance such as water
heater.
Install boiler such that oil ignition system components are protected from water (dripping, spraying, rain etc.) during appliance operation and service.
TOP 24 IN.
FRONT 24 IN.
FLUE CONNECTOR 9 IN.
REAR 24 IN.
LEFT SIDE 6 IN.
RIGHT SIDE 24IN.
NOTE:Clearance for accessshould exceedfire protection
clearance.
Figure #2 - Hinimum Clearances To Combustible
Construction (as seen from above)
BACK
FRONT
Asphyxiation, fire hazard. Do not obstruct air openings to combustion area. Follow instructions below, to maintain adequate combustion air.
126 26 126 32 63 175 35 175 44 88
259 52 259 65 130 294 59 294 74 147
* A space whose volume is not less than 50 cubic feet per 1000 BTU/Hour of all appliances installed in that space (cubic feet of
space = height x width x length) ** A space whose volume is less than 50 cubic feet per 1000 BTU/Hour of all appliances installed in that space (cubic feet of space
= height x width x length)
1. Ventilation of boiler room must be adequate enough to provide sufficient air to properly support combustion, venting and maintain safe ambient temperatures under normal operating conditions.
2. When the boiler is located in an unconfined space in a building of conventional construction frame, masonry or metal, infiltration normally is adequate to provide air for combustion and ventilation. However, in any building which has been altered to conserve energy or to minimize infiltration, the boiler area should be considered as a confined space. If there is any doubt, install air supply provisions for combustion and ventilation in accordance with Chapter 5, Air for Combustion and Ventilation, of NFPA 31, Standard for the Installation of Oil Burning Equipment. The recommendations that follow, or applicable provisions of the local building codes.
3. When the boiler is installed in an unconfined space, in a building of unusually tight construction, air for
combustion and room ventilation must be obtained from outdoors or from spaces freely communicating
with the outdoors. A permanent opening or openings having a total free area of not less than 1 square inch per 5,000 BTU per hour of total input rating of all appliances shall be provided. Ducts may be used to convey make-up air from the outdoors and shall have the same cross-sectional area of the openings to which they are connected.
, When air for combustion and room ventilation is from
inside buildings, the confined space shall be provided with two permanent openings, one starting 12 inches
from the top and one 12 inches from the bottom of the
enclosed space. Each opening shall have a minimum free area of 1 square inch per 1,000 BTU per hour of the total input rating of all appliances in the enclosed
space, but must not be less than 100 square inches. These openings must freely communicate with the
interior areas having adequate infiltration from the
outside. See Figure #3.
Figure #3
f.. CHIMNEY
OR
L TYPE VENT PIPE
/ / /
BASEBOARD _h
/ /
/ / / / /
/ /
/ / / /
,
When the boiler is installed in a confined space and all air is provided from the outdoors, the confined space shall be provided with two permanent openings, one commencing within 12 inches from the top and one commencing 12 inches from the bottom of the enclosure. The openings shall communicate directly, or by ducts, with the outdoors or spaces (crawl or attic) that freely communicate with the outdoors. One of the following methods must be used to provide adequate
air for ventilation and combustion. A. When directly communicating with the outdoors,
each opening shall have a minimum free area of 1 square inch per 4,000 BTU per hour of total input rating of all equipment in the enclosure. (Figure #4)
B. When communicating with the outdoors by means
of vertical ducts, each opening shall have a minimum free area Z square inch per 4,000 BTU per hour of total input rating of all appliances in the enclosed space. (Figure #5)
C. If horizontal ducts are used, each opening shall
have a minimum free area 1 square inch per 2,000 BTU per hour total input rating of all appliances in the enclosed space. (Figure #6)
D. When ducts are used, they shall be of the same
cross sectional area as the free area of the area of the openings to which they connect. The minimum
dimension of rectangular air ducts shall not be less than 3 inches.
,
In calculating free area using louvers, grills or screens for the above, consideration shall be given to their blocking effect. Screens used shall not be smaller than
1/4 inch mesh. If the free area through a design of
louver or grill is known, it should be used in calculating the size opening required to provide the free area specified. If the design and free area is not known, it may be assumed that wood louvers will have 20-25% free area and metal louvers and grills will have 60-75% free area. Louvers and grills shall be fixed in the open position or interlocked with the boiler so that they are opened automatically during boiler operation.
Figure #5
C iq I M_iNE Y
OR
PI_PE
Burn or Scald Hazard. Discharge line shall be installed to safety valve outlet connection to avoid burns, scalding, or water damage due to discharge of steam and/or hot water during operation.
Discharge line shall:
Connect to safety valve outlet. Piped down to safe point of disposal. Check local codes for maximum distance from floor or allowable safe point of discharge.
Pipe size be of equal to or greater than of safety valve outlet over entire length of discharge line.
Have no intervening shutoff valve between safety valve and discharge to atmosphere. Do not plug or place any obstruction in discharge line.
Terminate freely to atmosphere where any discharge will be clearly visible and at no risk of freezing.
Allow complete drainage of valve and discharge line.
Install safety valve with spindle in vertical position.
Do not install shutoff valve between boiler and safety valve.
Support safety valve discharge piping.
Be short and straight as possible.
Terminate with plain end, not threaded.
Constructed of material suitable for exposure to temperatures of 375 ° F (191°C); or greater.
Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installation requirements.
Figure 4 - Safety Valve
SAFETY VALVE
DTSCHARGI
pTpTNG
Check local codes
for maximum distance from floor or other
allowable safe
point of discharge
t
6" Above Floor
Loading...
+ 16 hidden pages