Fresh Air For Combustion............................... 7
System Piping
Chimney And Chimney Connections
Typical Chimney Connection
Electrical Connections
Filling The Boiler
Operating The Boiler
Checking And Adjusting Controls
Maintenance
Oil Boiler Cleaning Instructions
Oil Burner Cleaning
Service Hints
Electrical Wiring
Equipment And Optional Accessories
.............................................. 9
.............. 16
......................... 17
................................. 18
....................................... 19
................................. 20
.................. 23
.............................................. 24
.................... 25
..................................... 26
............................................. 27
......................................... 28
............. 30
Introduction
Empire Water boiler is a natural draft oil red hot water
boiler comprised of cast iron sections. Empire Water
boiler is available with 3, 4, or 5 cast iron sections. These
sections are held together by cast iron push nipples.
Empire Water boiler is capable of firing #2 fuel oil from
0.65 gph up to 1.75 gph. All packaged boilers include a
swing door, Honeywell limit, temperature and pressure
gauge, safety relief valve, drain valve, flue brush, and
extra boiler tap for expansion tank or air elimination.
Boiler installation shall be completed by qualied agency.
Become familiar with symbols identifying
potential hazards.
This is the safety alert symbol. Symbol alerts you
to potential personal injury hazards. Obey all safety
messages following this symbol to avoid possible injury or
death.
!
DANGER
Indicates a hazardous situation which, if not avoided,
WILL result in death or serious injury
!
WARNING
Indicates a hazardous situation which, if not avoided,
could result in death or serious injury.
!
CAUTION
Indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury.
NOTICE
Used to address practices not related to personal
injury.
2
Page 3
1 1/4”
Figure 1 - Dimensions
BOILER RATINGS AND CAPACITIES
BOILER RATINGS AND CAPACITIES
BOILER
MODEL NO.
Without
Tankless Coil
INPUT
**HEATING
CAPACITY
+gph*MbhABC
*Mbh
‡NET
AHRI
RATING
WATER
*Mbh
A.F.U.E.++NO.
SEC.
MINIMUM
CHIMNEY
SIZE/
HEIGHT
»3EW.650.6591807086.338” X 8” X 15”14½68
»3EW.750.75105928085.238” X 8” X 15”14½68
3EW1.001.0014012010484.038” X 8” X 15”14½68
»4EW.900.901261119786.048” X 8” X 15”17¾69⅝
»4EW1.251.2517515113185.048” X 8” X 15”17¾69⅝
4EW1.501.5021017915684.048” X 8” X 15”17¾69⅝
»5EW1.201.2016814712886.558” X 8” X 15”21611½
5EW1.751.7524521018384.358” X 8” X 15”21611½
* Mbh = 1,000 BTU per hour [BTU = British Thermal Unit]
**Heating Capacity based on 13% CO2 with a 0.02” w.c. draft over re, and a #1 smoke or less. Testing was done in
accordance with the D.O.E. (Department of Energy) test procedure.
+ gph = Gallons per hour oil at 140,000 BTU per gallon
++A.F.U.E. = Annual Fuel Utilization Efciency based upon D.O.E. test procedure.
‡ Net AHRI Water Ratings based on piping and pickup allowance of 1.15. Consult manufacturer before selecting boiler
for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive
piping systems, etc.
>>
As Energy Star Partner, manufacturer has determined this product meets Energy Star guidelines for energy efciency.
DIMENSIONS
(inches)
3
Page 4
SAFE INSTALLATION AND OPERATION
NOTICE
This boiler has been designed for residential
installations. If used for commercial applications,
all jurisdictional requirements must be met. This
may require wiring and/or piping modications.
Manufacturer is not responsible for any changes to
the original design.
1.
Read the Owner’s Manual for Safe Operation. Failure
to follow rules for safe operation and instructions can
cause malfunction of boiler and result in death, serious
bodily injury, and/or property damage.
2.
Check your local codes and utility requirements before
installation. Installation must be in accordance with
their directives, or follow NFPA 31 Installation of Oil
Burning Equipment, latest revision.
3.
Before servicing, allow boiler to cool. Always shut off
any electricity and oil to boiler when working on it.
4.
Inspect oil line and connections for leaks.
5.
Be certain oil burner nozzle is the size required. Overring will result in early failure of the boiler sections.
This will cause dangerous operation.
6.
Never vent this boiler into enclosed space. Always vent
to outside. Never vent to another room or inside a
building.
7.
Be sure there is adequate air supply for complete
combustion.
8.
Follow regular service and maintenance schedule for
efcient and safe operation.
9.
Keep boiler area clean and free of combustible material,
gasoline and other ammable vapors and liquids.
10.
Oil burners are not do-it-yourself items. This
boiler must be installed and serviced by qualied
professionals using combustion test instruments.
!
WARNING
Burn and scald hazard. Safety relief valve could
discharge steam or hot water during operation.
Install discharge piping per these instructions.
11.
Be aware when piping the safety relief valve if system
pressure exceeds safe limit of 30 pounds per square
inch, the safety relief valve will automatically lift
open. Lifting of the safety relief valve can discharge
large quantities of steam and hot water, which may
damage the surroundings. Before installing the safety
relief valve read the manufacturer’s instructions and
maintenance section of the manual on safety relief
valves.
12.
Installation and sizing of the expansion tank must
consider heating systems total water volume,
temperature, boiler initial ll pressure, and system
arrangement. Improperly installed and sized expansion
tank may result in frequent lifting of the safety
relief valve or other heating system problems. For
proper installation, sizing, and maintenance of the
expansion tank follow guidelines established by tank
manufacturer.
13.
Expansion tank performance and life expectancy can
be hindered by overlling the boiler. Recommend initial
ll pressure of 10-12 psig. For higher ll pressures
expansion tank’s air charge will need to be increased to
match ll pressure. Consult manufacturer’s guidelines
for sizing and selection.
14.
Purging the heating system of air and gases when
rst putting boiler into service is critical for proper
circulation and quiet performance. Once air and gases
are purged, for boiler installations using oat type
vents, air vents should be closed for normal operation.
If air is heard or noticed by loss of heat, purge system
and open vents for short period of time.
DO NOT USE GASOLINE CRANKCASE DRAININGS
OR ANY OIL CONTAINING GASOLINE.
4
Page 5
LOCATING THE BOILER
Complete Prior To Installing Boiler.
1.
A. Verify you have selected the right size boiler with
proper capacity. AHRI rating of boiler selected
2.
should be greater than or equal to calculated peak
heating load (heat loss) for building or area(s)
served by boiler and associated hot water heating
systems. See boiler rating and capacity table
previously listed in this manual. Any heat loss
3.
4.
calculations used should be based on approved
methods.
B. Boiler must be supplied with proper oil supply
and oil piping, sufcient fresh combustion air, and
suitable electrical supply.
C. Boiler must be connected to suitable venting system
and piping system adequate to distribute heating
load.
5.
D. Properly locate and install thermostat for heating
system control.
Any doubts as to requirements, check with local authorities
and obtain professional help where needed. OPERATING
INSTRUCTIONS, FINAL CHECKS AND ADJUSTMENTS, and
MAINTENANCE sections in this manual are vital to the
proper and safe operation of the heating system.
Fire hazard. Do not install boiler on combustible
ooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
Place boiler in location centralized with the piping
system and as close to chimney as possible.
Boiler must be level. If necessary use metal shims
beneath boiler’s feet.
Use raised base if oor can become wet or damp.
Maintain clearances for re safety as well as
servicing. 18” clearance must be maintained
at side where passage is required for access to
another side for cleaning, servicing, inspection
or replacement of any parts that may normally
require attention. Install boilers at least 6” from
combustible material on left side, rear, and above,
and at least 24” on right side and front. Allow at
least 24” accessiblity clearance above for servicing.
Fresh air for combustion must be available at front
of the boiler. Fresh air for ventilation must be
available to front and rear of boiler. Air passages
must be free of obstructions at all times. Ventilating
and combustion air must enter boiler room without
restrictions.
!
WARNING
Figure 2 - Clearances
6”
Min.
6”
Front
Min.
(Burner
Side)
24” Min.
24” Min.
6.
Floor supporting boiler must be noncombustible and
sufciently stable. If it is combustible, place boiler
on 2” concrete patio blocks or 2” Cladlite Pad™.
Blocks or pad must be under entire boiler to protect
the oor.
7.
Installation shall be in accordance with the
requirements of the local authorities having
jurisdiction. Compliance with these regulations is
required. In the absence of local codes, follow NFPA
31 Installation of Oil Burning Equipment, latest
revision.
BOILER CLEARANCES
Unit
Top6”24”
Left Side6”
Right Side24”
Basenon-combustible
Front24”
Back6”
Combustible
Clearance
All distances measured from the cabinet of the boiler.
Accessibility,
Cleaning, and
Servicing
Flue to
Combustible
Clearance
9”
5
Page 6
OIL FILTER
Figure 3 - Boiler With Piping System
LOCATING THE BOILER
AUTOMATIC
FILL VALVE
AND SHUTOFF
DIAPHRAGM
EXPANSION TANK
DRAFT
REGULATOR
CHI
VENT
PIPE
MNE
Y
RELIEF VALVE
TO RADIATION
FROM RADIATION
CIRCULATING
PUMP IN
TANK
OR AFTER THE
RETURN LINE
EXPANSION
ELECTRIC LINE
SERVICE LINE
PROTECTED
OVERCURRENT
OIL BURNER
FOUNDATIONS
LINES TO OTHER
APPLIANCES
ENTRANCE
SWITCH
TO OUTSIDE
GENERAL PRINCIPAL REQUIREMENTS FOR A TYPICAL INSTALLATION
SAFETY SWITCH
2" FILL
PIPE
VENT PIPE
MIN. 2" I.D.
OIL TANK
VALVE
OIL LINES
6
Page 7
FRESH AIR FOR COMBUSTION
!
WARNING
Asphyxiation, re hazard. Do not obstruct air
openings to combustion area. Follow instructions
below, to maintain adequate combustion air.
NOTICE
Install outside air intake if you use replace or
kitchen or bathroom exhaust fan. These devices rob
boiler and water heater of combustion air.
Provide enough fresh air to assure proper combustion.
Fire in the boiler uses oxygen. It must have continuous
supply. Air in the house contains only enough oxygen to
supply burner for short time. Outside air must enter the
house to replace air used by the burner. Study the following
examples 1 and 2 to determine your fresh air requirements.
EXAMPLE 1: Boiler Located in Unconned Space
If your boiler is in an open area (un-partitioned basement)
in conventional house, air that leaks through cracks around
doors and windows will usually be adequate to provide air
for combustion. Doors should not t tightly. Do not caulk
cracks around windows.
An unconned space is dened as space whose volume is
not less than 50 cubic feet per 1,000 Btu per hour of total
input rating of all appliances installed in that space.
EXAMPLE 2: Boiler Located in Conned Space
A. All Air from Inside the Building: Conned
space shall be provided with two permanent openings
communicating directly with additional room(s) of sufcient
volume so the combined volume of all spaces meets the
criteria for unconned space. Total input of all combustion
equipment installed in combined space shall be considered
in making this determination. Each opening shall have
minimum free area of one square inch per 1,000 Btu per
hour of total input rating of all combustion equipment in the
conned space, but not less than 100 square inches. One
opening shall be within 12 inches of top and one within 12
inches of bottom of the enclosure.
Example: Your boiler is rated at 100,000 Btu per hour.
Water heater is rated at 30,000 Btu per hour. Total is
130,000 Btu per hour. You need two grilles, each with 130
square inches of FREE opening. Metal grilles have about
60% FREE opening. To nd louvered area needed, multiply
free opening required by 1.7 (130 x 1.7 = 221.0 sq. in.
louvered area). In this example, two grilles each having 8”
x 30” (240 sq. in.) louvered area would be used.
Figure 4 - Air Openings For Boiler Located In
Conned Space (Utility Room)
7
Page 8
FRESH AIR FOR COMBUSTION
B. All Air from Outdoors: Conned space shall
be provided with two permanent openings, one
commencing within 12 inches of top and commencing
within 12 inches of bottom of enclosure. Openings
shall communicate directly, or by ducts, with outdoors
or spaces (crawl or attic) that freely communicate with
outdoors.
1. When directly communicating with outdoors, each
opening shall have minimum free area of one
square inch per 4,000 Btu per hour of total input
rating of all equipment in the enclosure.
2. When communicating with outdoors through
vertical ducts, each opening shall have minimum
free area of one square inch per 4,000 Btu per
hour of total input rating of all equipment in the
enclosure.
3. When communicating with outdoors through
horizontal ducts, each opening shall have
minimum free area of one square inch per 2,000
Btu per hour of total input rating of all equipment
in the enclosure.
4. When ducts are used, they shall be of same cross
sectional area as free area of openings to which
they connect. Minimum dimension of rectangular
air ducts shall be not less than three inches.
Figure 5 - Fresh Air Duct Capacities For Ducts Supplying Fresh Air To Boiler In
Tightly Constructed Houses
FRESH AIR DUCT CAPACITIES
THROUGH LOUVERS
Fresh Air
Duct Size
3 ½” x 12”144,00036,000108,000
8” x 8”256,00064,000192,000
8” x 12”384,00096,000288,000
8” x 16”512,000128,000384,000
*Btuh = British Thermal Units per hour based on
opening covered by ¼” mesh screen , wood louvers,
¼” Mesh
Screen
(Btuh)*(Btuh)*(Btuh)*
or metal louvers.
Wood
Louvers
Metal
Louvers
8
Page 9
SYSTEM PIPING
1.
Installation of boiler for new heating system,
Install all of radiation units (panels, radiators,
baseboard, or tubing) and supply and return mains
rst. After all heating system piping and components
have been installed, make nal connection of system
piping to boiler. It is recommended to mount circulating
pump on supply side piping, such that it pumps away
from expansion tank. Refer to gures on next pages.
2.
Equip hot water boiler installed above radiation
level with low water cut off device. Periodic inspection
is necessary, as is ushing of oat type devices, per
low water cut off manufacturer’s specic instructions.
3.
Packaged boiler is set up with 1¼” NPT supply
and return piping from front of boiler. Boiler supply
and return piping can be moved to rear of boiler. Boiler
should not be piped return line to front, supply line
to rear, or vice versa, will cause boiler water to short
circuit heat exchanger. Piping connections may require
additional ttings and parts.
4.
Install drain valve provided with boiler in return tee.
See gure 6.
5.
Install Safety Relief valve in rear section using ¾”
nipple and street elbow provided with boiler. See gure
3.
A. Install safety relief valve with spindle in vertical
position.
B. Do not install shutoff valve between boiler and
safety relief valve.
C. Install discharge piping from safety relief valve.
• Use ¾” or larger pipe.
• Use pipe suitable for temperatures of 375°F
(191°C) or greater.
• Individual boiler discharge piping shall be
independent of other discharge piping.
• Size and arrange discharge piping to avoid
reducing safety relief valve relieving capacity
below minimum relief valve capacity stated on
rating plate.
• Run pipe as short and straight as possible to
location protecting user from scalding and properly
drain piping.
• Install union, if used, close to safety relief valve
outlet.
• Install elbow(s), if used, close to safety relief valve
outlet and downstream of union (if used).
• Terminate pipe with plain end (not threaded).
6.
Verify clean cold water supply is available when
connecting to pressure reducing valve. When water
supply is from well or pump, a sand strainer should be
installed at the pump.
Low Design Water Temperature Systems (Below 140°
F) And Large Water Content Systems
• Signicant condensation may form in this boiler and/
or venting system if boiler is operated with return
temperatures of less than 120°F.
• Condensation is corrosive and can eventually cause
damage to boiler and venting system. Minimum design
return water temperature to prevent this condensation in
boiler and venting is 120°F.
• Boiler used in heating system where design water
temperatures below 140°F are desired (e.g. radiant oor
heating), a 3-way or 4-way mixing valve or suitable
alternative (e.g. Bypass Piping Arrangement shown
in diagram on following page) is required to prevent
low temperature (below return 120°F) return water
from entering boiler. When using mixing valve, follow
manufacturer’s installation instructions.
• Boiler connected to system having large water content
(such as former gravity system), use of Bypass Piping
Arrangement shown in diagram on following page is
suggested.
Figure 6 - Safety Relief Valve Installation
Follow Instructions
to install discharge
piping from safety
relief valve to drain.
9
Page 10
SYSTEM PIPING
Figure 7 - Bypass Piping Arrangement Diagram
> LOW DESIGN WATER TEMPERATURE
SYSTEMS
> LARGE WATER CONTENT SYSTEMS
> PIPING ARRANGED FOR “POWER
PURGING” AIR OUT OF THE SYSTEM
PIPING, REFER TO THIS MANUAL’S
SECTION ON “FILLING THE SYSTEM
WITH WATER” OPTION #1
10
Page 11
SYSTEM PIPING
Figure 8 - System Piping Arrangement Zoning With Zone Valves
> CIRCULATOR ON SUPPLY PIPING PUMPS
AWAY FROM EXPANSION TANK
NOTE: CIRCULATOR CAN ALSO BE INSTALLED
ON RETURN PIPING.
> PIPING ARRANGED FOR “POWER PURGING”
AIR OUT OF SYSTEM PIPING, REFER TO
THIS MANUAL’S SECTION ON “FILLING THE
SYSTEM WITH WATER” OPTION #1
11
Page 12
SYSTEM PIPING
Figure 9 - System Piping Arrangement Zoning With Circulators
> CIRCULATOR ON SUPPLY PIPING PUMPS
AWAY FROM EXPANSION TANK
> PIPING ARRANGED FOR “POWER PURGING”
AIR OUT OF SYSTEM PIPING, REFER TO
THIS MANUAL’S SECTION ON “FILLING
THE SYSTEM WITH WATER” OPTION #1
12
Page 13
SYSTEM PIPING
Figure 10 - System Piping Arrangement Alternate Near Boiler Piping
> PER THIS MANUAL, USE OPTION #2 IN
“FILLING THE SYSTEM WITH WATER”
> DIAPHRAGM EXPANSION TANK MOUNTED
OFF THE BOILER
> THIS PIPING ARRANGEMENT CAN BE USED
WITH ZONE VALVES OR ZONE
> CIRCULATOR ON SUPPLY PIPING PUMPS
CIRCULATORS
AWAY FROM EXPANSION TANK
13
Page 14
SYSTEM PIPING
Tankless Coil Piping Arrangement
Boilers may be factory packaged with tankless heater
coil see gure below. Coil provides instantaneous heating
of water for domestic use if proper burner and water supply
line controls are used. Tankless coils are meant to provide
domestic hot water for intermittent draws, not continuous
ow.
NOTICE
Do not use tankless coil if your water is excessively
hard with lime or other deposits which will
accumulate inside the coil.
When using tankless coil, boiler is congured so Honeywell
L7248 operates with Honeywell L4006 low limit mounted
on well installed in tankless heater. Mount factory wired low
limit on well.
Tempering valve (mixing valve) is recommended as shown
below. Flow restrictor may be required on tankless coil inlet
piping so that ow rates are matched to boiler heat input
(see table).
!
DANGER
Water temperatures exceeding 125°F will cause
severe burns instantly or death by scalding.
Boiler
Model
Burner
Input
Rate (gph)
Input
(MBH)
Tankless
Rating
(gpm)‡
3EW.650.65912.90
3EW.750.751053.00
3EW1.001.001403.25
4EW.900.901263.15
4EW1.251.251753.50
4EW1.501.502103.75
5EW1.201.201683.45
5EW1.751.752454.00
‡ Gallons of water per minute heated from 40°F to 140°F with
200°F boiler water temperature, intermittent draw
Figure 11 -Tankless Coil Piping Arrangement
14
Page 15
SYSTEM PIPING ARRANGEMENT
Antifreeze added to boilers must be nontoxic, and
must be of type specically intended for use in closed
hydronic heating systems. Under no circumstances
should automotive antifreeze be used. Antifreeze used
in any boiler may reduce capacity by 10% or more and
increase fuel consumption. Tankless coil performance
will fall as concentration of antifreeze is increased. Refer
to boiler and piping water volumes tables.
BOILER WATER VOLUMES
Number of
Boiler Section
Total Volume
(Gallons)
39.6
411.6
513.7
PIPING WATER VOLUMES
PIPE SIZE
COPPER PIPE
FACTOR
½”82.563.5
¾”40.036.0
1”23.322.2
1 ¼”15.312.8
1 ½”10.89.5
2”6.25.8
Divide total length of piping in feet by appropriate factor
in table to determine volume in gallons.
STEEL PIPE
FACTOR
15
Page 16
CHIMNEY AND CHIMNEY CONNECTIONS
For oil red boilers for connections to vents or chimneys,
vent installations shall be in accordance with applicable
provisions of INSTALLATION OF OIL BURNING EQUIPMENT,
NFPA31 latest revision, and applicable provisions of local
building codes.
NOTICE
Fresh air (ventilation) is important to proper
venting. Ventilation and venting are two parts of the
same system. Inadequate ventilation will result in
inadequate venting. Always be sure to have enough
ventilation to support proper venting.
Check your chimney to make certain that it is right size,
properly constructed and in good condition.
See Table “Recommended Minimum Chimney Sizes”.
For additional chimney design and sizing information,
consult the National Standard for Chimneys, Fireplaces,
Vents and Solid Fuel Burning Appliances, ANSI/NFPA 211.
!
WARNING
Fire Hazard. Maintain minimum vent pipe clearance
of 18” from surface of vent to wood and other
combustible materials. Failure to comply may result
in death or serious injury.
Chimney Connector And Draft Regulator
• Venting the boiler requires 6” diameter chimney
connector pipe and use of manufacturer provided draft
regulator.
• Regulator, when properly installed, automatically
controls the draft.
• Install in horizontal section of pipe, may also be
installed in angled or vertical section of pipe.
• Verify “top” of regulator is at the top and short pipe
section which holds the vane is horizontal.
• Even though locating draft regulator close to chimney
reduces noise, install draft regulator as close as
practicable to the boiler.
• Install chimney connector, start at boiler with vertical
pipe, elbow, then install draft regulator horizontally.
• When regulator is in place, start at chimney and work
back to the regulator.
• Join the two sections with draw-band.
• Horizontal pipe must slope up toward the chimney at
least 1/4 inch per linear foot of venting.
• Chimney connector must not leak and must be rmly
supported.
• Join each section with at least two sheet metal screws.
Support every second section with a stovepipe wire.
RECOMMENDED MINIMUM CHIMNEY SIZES
FIRING RATE
(gph)
0.60 1.30158” x 8”6”6 ¾” x 6 ¾”
1.31 1.80158” x 8”7”6 ¾” x 6 ¾”
1.81 2.00208” x 8”8”6 ¾” x 6 ¾”
For elevations above 2,000 feet above sea level, add 3 feet to the chimney heights.
CHIMNEY
HEIGHT (ft)
NOMINAL
CHIMNEY
16
ROUND
LINER INSIDE
SQUARE
LINER INSIDE
Page 17
MINIMUM HEIGHT:MUST BE AT LEAST 3 FT (.9m)HIGHER THAN HIGHEST PART OFPASSAGE THROUGH ROOF. MUST BEAT LEAST 2 FT HIGHER THAN ANYNEIGHBORING OBJECT WITHIN 10 FT.MUS
MUST HAVE AN UNOBSTRUCTEDTOP OPENING.
TYPICAL CHIMNEY CONNECTION
Figure 12 -
Typical Chimney Connection
17
Page 18
ELECTRICAL CONNECTIONS
!
WARNING
Electrical shock hazard. Turn OFF electrical power supply
at service panel before making electrical connections.
Failure to do so could result in death or serious injury.
Thermostat
Install 24 Volt thermostat (not provided) in proper location.
Location of thermostat has effect on boiler system operation.
Follow instructions included with thermostat.
Grounding
Permanently ground boiler according to local codes and
latest revision of the National Electrical Code. Run 14
gauge or heavier copper wire from boiler to grounded
connection in service panel or properly driven and
electrically grounded ground rod.
Electric Power Supply
Installation must comply with the latest revision of the
National Electrical Code, any other national, state, or local
codes or regulations.
Connect 115 volt electrical supply to L1 and L2 terminals
on limit and two thermostat wires to T and T terminals on
same limit. See wiring diagram page 28.
Run separate circuit from separate over current protection
device in your electrical service entrance panel. Minimum
15 ampere circuit. Locate shutoff switch at boiler. Turn off
during any maintenance. Solder and tape or securely fasten
connections with wire nuts.
Oil Burner Wiring
For boilers packaged with oil burners, burners are wired
at the factory. For boilers shipped without a burner, wiring
connections are shown in the electrical wiring diagrams of
this manual.
18
Page 19
FILLING THE BOILER
How A Hot Water System Operates
Entire heating system (boiler, piping, and radiation units)
is lled with water. As water in the boiler is heated, it
is circulated from top of boiler through supply main to
radiation units. Cooler water in radiation units ows back
through return piping through return main into the boiler.
This arrangement provides positive and rapid response to
the thermostat.
Filling The System With Water
OPTION #1 This method utilizes boiler piping as shown in
gure on page 6.
A. Close main shutoff valve, isolation valves, and zone
valves (if applicable). If bypass piping is installed,
also close two throttling valves. Leave boiler service
shutoff valve (if installed) and balancing valves to
each heating zone fully open.
B. Open following valves in order: drain valve for power
purging, isolating valves before and after boiler
circulator (if applicable), both throttling valves (if
applicable), and then open ll line shutoff valve. Water
will ll bypass piping and push air through piping and
out power purging drain valve. When power purging
drain valve runs air free, close bypass piping throttling
valve (leaving throttling valve to supply piping fully
open).
OPTION #2
• Close air vents on all radiation units.
• Open valves to radiation units. Verify boiler drain valve,
expansion tank drain cock, and air bleed screw on
expansion tank drain tting are closed.
• Open ll valve on piping to expansion tank.
• Open water inlet to boiler and leave it open.
• Open air vent on lowest radiation unit.
• When all air has escaped and water starts to ow from
vent, close it.
• Go to next radiation unit, and repeat this process until
nishing with highest radiation unit.
• If heating system has automatic vents, this manual
venting is unnecessary but it will speed up proper lling
of the system.
If system is a closed expansion tank system, automatic ll
valve is needed. Leave automatic ll valve open to rell
system automatically as needed.
Note initial ll pressure on boiler’s temperature / pressure
gauge, which should be 10-15 psig. Any lowering of
pressure from its initial ll pressure indicates loss of water
due to leakage. Automatic ll valve should then compensate
for this water pressure loss. If it does not, manually open
this valve to rell system until needle is again pointing to
same pressure reading. Instructions are packaged with
valve.
C. Next, open isolation valve (or zone valve) to rst
zone. Water will ll piping and push any air out power
purging drain valve. When power purging drain valve
runs air free, close isolation valve or zone valve).
Repeat this procedure for remaining heating zones.
D. Once all zones are lled with water and purged of air,
close power purging drain valve and ll line shut off
valve, open main shutoff valve, and adjust throttling
valves and balancing valves as required.
19
Page 20
OPERATING THE BOILER
Start: Fill entire system with water. Vent all air from
system following section for Filling The Boiler.
Fuel Units And Oil Lines:
• Install oil line(s) to oil burner.
• Recommend using heavy wall copper tubing and
ared ttings, not compression ttings.
• All connections and joints must be absolutely airtight.
Use an appropriate non-hardening thread sealing
compound on the threaded connections, not Teon
tape.
• See fuel unit data sheet furnished with the burner for
sizing, lift, and length of tubing recommendations.
Oil burner is equipped with single stage fuel unit
with bypass plug removed for single pipe installation.
Satisfactory where fuel supply is on same level as or
above burner permitting gravity ow of oil. Per NFPA 31
requirements, never exceed 3 psig pressure to inlet side of
fuel unit.
When necessary to lift oil to burner, two pipe installation
is required. Run return line between fuel unit and oil
supply. When two pipe installation is used, bypass plug
(furnished with burner) must be installed in fuel unit. Refer
to fuel unit instructions furnished with burner for specic
instructions on installing bypass plug. Do not exceed fuel
unit manufacturer’s recommendations for running vacuum.
NOTICE
If lift exceeds 14 feet for Beckett or Carlin burners
or 11 feet for Riello burners, two stage fuel unit is
required with return line.
Air Supply For Combustion:
• Do not install boiler in rooms with insufcient air, unless
corrective steps are taken.
• It may be necessary to install windows or cut holes in
a door to rooms used for supply air to obtain sufcient
combustion air and prevent less than atmospheric air
pressure in that room.
• If there is a lack of combustion air, burner ame will be
dark orange and formation of soot will occur in heating
unit.
• In buildings of conventional frame, brick, or stone
construction that do not have utility rooms, basement
windows, or stair doors, air inltration is normally
adequate to provide enough air for combustion and for
operation of barometric draft control.
• Room used for supplying combustion air should be
isolated from any area served by exhaust fans.
• Refer back to the section on Fresh Air For Combustion
for additional sizing guidelines.
Draft Regulators: Barometric draft regulator is required
for controlling draft through boiler. Mount barometric draft
regulator in chimney connector. Refer back to section on
“Chimney And Chimney Connections”. Once draft regulator
is installed, use draft gauge to adjust to proper opening:
A. Combustion chamber over re draft will be
approximately 0.01” WC to 0.02” WC.
B. Stack draft will be approximately 0.02” WC. to
0.04” WC.
C. Larger installation, greater draft will be required in
stack to obtain desired over re draft.
Install oil lter of adequate size inside building between
tank shutoff valve and oil burner. For ease of servicing,
locate shutoff valve and lter near oil burner.
20
Page 21
OPERATING THE BOILER
Nozzles And Electrodes: Use proper size, spray angle,
and spray pattern nozzle. Refer to recommended nozzle
selection charts.
To install nozzle, remove nozzle line electrode assembly,
if necessary remove retention ring assembly, and install
and tighten nozzle. Take care not to damage electrode
insulators or bend electrode tips.
After installing nozzle, reassemble nozzle line electrode
assembly and set electrode tip spacing.
Depending on burner type, electrode tip spacing may
need to be set prior to reassembling nozzle line electrode
assembly.
Refer to following pages for setting electrode tip spacing.
Final Burner Adjustments: Final burner adjustments
must be made using combustion test instruments. Refer to
“Burner Settings”. Set burner accordingly.
• Check draft over re to verify it is between 0.01” WC
and 0.02” WC, adjust draft as necessary.
• After operating 10 minutes to warm up boiler, use
combustion test equipment to take smoke reading in
ue pipe between boiler and draft regulator.
• Smoke reading should be zero to trace (Shell Bacharach
Scale).
• A new boiler requires more than 10 minutes to burn
clean due to oil lm on new heat exchanger.
• If smoke reading is zero, gradually close burner’s air
adjustment to obtain smoke reading showing trace
smoke reading. Once smoke reading is trace, measure
CO2 and as insurance margin increase air to sufciently
reduce CO2 by ½% to 1%.
If clean re cannot be obtained, it is necessary to verify
burner head and electrode alignment. Proper electrode
alignment gures are presented on following pages. If
re continues to be smoky, replace nozzle with correct
replacement.
Once burner is completely adjusted, burner should
be started and stopped several times to assure good
operation with no uttering or rumbling. Verify there
are no oil leaks and record nozzle size, oil pressure,
combustion readings, and air settings on tag or label
attached to burner or, boiler.
Oil Burner Maintenance: For Beckett AFG, Carlin EZ1
or EZ2, and the Riello 40 F3, F5, or F10 perform following
preventative maintenance annually, preferably prior to
heating season.
1.
2.
3.
4.
5.
6.
7.
If any component parts must be replaced, always use parts
recommended by burner manufacturer.
Oil Burner Motor For Beckett and Carlin burners,
add 2 - 3 drops of non-detergent electric motor oil to
each oil cup located at front and rear of motor (Riello
burners are permanently lubricated). Excessive oiling
will shorten life expectancy of motor.
Fuel Filter Replace to prevent contaminated fuel from
reaching nozzle. Partially blocked fuel lter can cause
premature failure of fuel pump.
Fuel Pump Unit Replace pump screen and clean pump
unit to maintain fuel delivery to nozzle.
Ignition Electrodes Clean and adjust per
manufacturer’s recommendations, to maintain reliable
ignition of oil.
Nozzle Replace to maintain safe and reliable
combustion efciency. Replace with nozzle as required
in charts located in this manual.
Fan and Blower Housing Must be kept clean, free of
dirt, lint and oil to maintain proper amount of air fuel
requires to burn.
Check Final Burner Adjustments.
21
Page 22
OPERATING THE BOILER
Figure 13 -Burner Adjustments and Settings
22
Page 23
CHECKING AND ADJUSTING CONTROLS
WARNING
!
Burn, scald hazard. Do not attempt to start the
burner when excess oil has accumulated, when
the unit is full of vapor, or when the combustion
chamber is very hot.
NOTICE
You or your installer must follow these instructions
carefully.
Adjust Operating Controls: Use the following settings
for rst adjustment:
High Limit:
Baseboard and Convectors 200°F
Standing Radiators 180°F
Low Limit (when used) 140º ( increase if hotter domestic
water is required, low limit set point must be at least 20°F less
than high limit set point)
When low limit is used, set ELL parameter on L7248
Honeywell control to ON. Boilers factory equipped with
tankless coils, are already set to ON.
Check Thermostat Operation:
Follow instructions included with your thermostat.
Locate thermostat ve feet above the oor on inside wall.
Locate thermostat to sense average room temperature,
avoid the following:
THERMOSTAT LOCATIONS TO AVOID
DEAD
SPOTS
Behind
doors
HOT SPOTSCOLD SPOTS
Concealed pipes
Fireplace
Concealed pipes
or ducts
TV setsStairwells drafts
RadiosDoors drafts
Corners &
alcoves
When temperature on thermostat is set above indicated
thermostat temperature, boiler’s burner should start. Verify
that when room temperature reaches selected temperature
setting, thermostat should turn boiler’s burner off, and once
room temperature falls few degrees boiler starts operating
again.
Do not start burner unless all cleanout doors are
secured in place.
Lamps
Direct sunlight
Kitchens
Unheated room
on other side of
wall
Adjust Thermostat Heat Anticipator To: 0.2
Amps
23
Page 24
MAINTENANCE
Annually: Recommend ue passages, combustion
chamber area (target wall, re door insulation,
durablanket), burner adjustment, control operation, and
boiler seals (re door gasket or silicone seal, cast iron
sectional seals, ue collector) be checked once each year
by trained Service Technician.
Before The Start Of Each Heating Season (or when
system has been shut down for extended periods of time)
recheck whole system for water, oil, and vent piping leaks.
Replace or patch any leaks or faulty seals.
Vent Pipe: Visually inspect entire venting system once a
month for any signs of leakage, deterioration, or soot build
up. If vent pipe shows any signs of leaking or deterioration,
replace it immediately. If it shows any signs of soot
build up, clean vent pipe and have burner settings and
combustion checked by trained Service Technician.
Safety Relief Valve: Valve should open automatically
when system pressure exceeds pressure rating (usually 30
psi) of safety relief valve. Should valve ever fail to open
under this condition, shut down the system. Drain system
until system pressure is reduced below safety relief valve
pressure rating. Contact Service Technician to replace the
valve and inspect heating system to determine cause, may
indicate equipment malfunction. Safety relief valve should
be tested monthly during heating season. Prior to testing,
make certain discharge pipe is properly connected to valve
outlet and arranged so as to contain and safely dispose of
boiler discharge. Hold trip lever fully open for at least ve
seconds in order to ush free any sediment that may lodge
on valve seat. Permit valve to snap shut. Refer to valve
manufacturer’s instructions packaged for more details.
Diaphragm Expansion Tank: Tank may become
water logged. Frequent automatic opening of safety relief
valve indicates water logging. High boiler temperature
accompanied by unusually low radiation unit temperature
(and “knocking” noises) indicates excess air in the tank. To
correct this condition, replace diaphragm expansion tank.
Water System: If system is to remain out of service
during freezing weather, drain it completely (water left in
system may freeze and will crack pipes and/or boiler).
Tankless Coil (Or Cover Plate) Gasket: Gasket
should be checked at least twice year for leakage, replace if
necessary. If gasket is replaced, make sure that when coil
plate (or cover plate) is reattached, ten nuts are torqued
in alternating pattern to insure equal force is applied to
entire gasket creating good seal. Nuts should be torqued so
gasket does not squeeze out from behind the plate.
Oil Burner: Oil burner maintenance is listed in this
manual under “Operating The Boiler”.
Never burn garbage or paper in the unit, never leave
combustible material around it.
Conventional Expansion Tank: Tank may become
water logged or may receive excess air. Frequent automatic
opening of safety relief valve indicates water logging. High
boiler temperature accompanied by unusually low radiation
unit temperature (and “knocking” noises) indicates excess
air in the tank. To correct either condition, close valve
between boiler and tank. Drain tank until empty. Check all
tank plugs and ttings, tighten as necessary. Open valve
between boiler and tank. Water will rise to normal height in
tank if system has automatic ll valve, otherwise manually
rell system.
24
Page 25
OIL BOILER / BURNER CLEANING INSTRUCTIONS
Oil Boiler Cleaning:
1.
Shut off all electrical power to boiler / burner and shut
off fuel oil supply.
2.
Remove vent pipe from top of boiler. Inspect pipe and
chimney for signs of corrosion and deterioration. Clean
out base of chimney. If vent pipe shows any signs of
corrosion or deterioration, replace it immediately. If
chimney damage or deterioration is discovered, contact
a service technician.
3.
Remove top jacket panel screws (5), brass wing nuts
(2) holding ue collector top, and ue collector top.
Inspect gasket on underside of ue collector and
replace as necessary.
4.
Before beginning to clean ue passageways, insure
combustion chamber blanket is covered. If blanket is
not covered prior to cleaning, replace blanket once
cleaning is completed.
5.
With access to ue passageways, remove soot from
reside surfaces by brushing diagonally through ue
passages (see drawing below). Brushing can be made
easier by cutting end of ue brush off and inserting
it into drill. When brushing, take care to not damage
target wall with ue brush.
6.
Carefully vacuum soot accumulations from
combustion chamber area, take care to not damage
any of refractory or blanket insulation. To gain
access to combustion chamber rst check that shut
off valve on fuel oil line is closed and disconnect
fuel oil line. Open swing door by removing whiz lock
nut holding door shut.
7.
Inspect target wall, re door refractory, and
combustion chamber blanket (when included) for
cracking and deterioration. If there are signs of
cracking or deterioration, replace refractory or
blanket before reassembling burner / front plate.
8.
Inspect door’s braided gasket for wear and damage.
Replace when necessary with braided gasket of
same material and size.
9.
Inspect and clean oil burner.
NOTICE
Important operating and maintenance
requirements:
• Keep your boiler and the area around it clean
• Never burn refuse or any material other than
specied fuel in your boiler
Figure 14 -
Passages
Brush Diagonally Through Flue
25
Page 26
OIL BURNER CLEANING
These are general instructions for cleaning
an oil burner. For specics, consult burner
manufacturer’s instructions.
!
WARNING
Electrical shock hazard. Turn OFF electrical power supply
at service panel before making electrical connections.
Failure to do so could result in death or serious injury.
1.
Verify all electrical power to boiler / burner and fuel
supply to burner are shut off.
2.
With swing door open, clean any soot accumulations
from end of burner and if applicable burner head.
3.
Remove burner drawer assembly, clean electrodes
and then reset electrode spark gap per manufacturer’s
recommendations.
4.
Replace oil nozzle with same size and type
recommended for use on this boiler.
5.
Install burner drawer assembly make sure head
location (and size if applicable) are per manufacturer’s
recommendations. If burner being used has damaged
head, replace head with same head recommended for
use on this boiler.
Fire burner, check for proper combustion using
combustion test equipment and making adjustments as
necessary.
12.
Insure all safety controls and operating controls are
functioning properly.
26
Page 27
SERVICE HINTS
You may avoid inconvenience and service calls by checking these points before you call for service:
IF YOUR SYSTEM IS NOT HEATING OR NOT GIVING ENOUGH HEAT . . .
POSSIBLE CAUSEWHAT TO DO
Thermostat is not set correctlyReset thermostat
Check ame. If it is yellow, the burner is not getting enough air.
Burner is not operating properly
Or, if ame is blue and noisy and seems to lift off the burner, the
burner is getting too much air. Contact your service technician.
No electric power to boiler
Controls out of adjustment Reset according to instructions.
Radiators not heating
Circulating pump not runningCheck over-current protection. Check relay operation.
Poor electrical contactCheck all control terminals and wire joints.
Chimney ue is blockedHave the chimney professionally cleaned.
Circulator running when boiler
water temperature is below
low limit setpoint (tankless coil
equipped boilers only)
POSSIBLE CAUSEWHAT TO DO
Corrosion and/or deposits on
seat.
Water logged expansion tankDrain tank, see instructions.
HAVE YOUR SERVICE TECHNICIAN CHECK ANY PROBLEM YOU
Check over-current protection. Check to be sure electric power
supply circuit is “ON”.
Open radiator vents to excess air. Check ow control valve (if
used). It may be in closed position.
Conrm ELL parameter on L7248 control is set to ON. Refer to
Honeywell L7248L instructions furnished with boiler.
RELIEF VALVE LEAKING . . .
Open valve manually. Allow water to run and clear valve seat.
ARE UNABLE TO CORRECT.
27
Page 28
ELECTRICAL WIRING
*
Figure 16 -
Boiler Honeywell L7248L Control
* When Low Limit Is Used, Set ELL Parameter On L7248 Honeywell Control
To On. Boilers Factory Equipped With Tankless Coil Are Factory Set To On.
28
Page 29
ELECTRICAL WIRING
*
Figure 17 -
Honeywell L7248L Control With Reillo F5/F10 Burner
* When Low Limit Is Used, Set ELL Parameter On L7248 Honeywell Control
To On. Boilers Factory Equipped With Tankless Coil Are Factory Set To On.
29
Page 30
ELECTRICAL WIRING
Figure 18 -
(With Tankless Coil Shown)
Honeywell L7248L Control Wiring with Zone Pumps and Argo ARM Switching Relay
30
Page 31
EQUIPMENT AND OPTIONAL ACCESSORIES
MAIN AIR VENT: for down ow systems or diaphragm
type expansion tanks (not provided)
Before system is lled with water, there is air in pipes and
radiation units. Some air will be trapped as system is lled.
It is possible to eliminate most of this air through air vents
on radiation units. Main air vent will speed and simplify this
process. Install main air vent on highest point in supply
main when all radiation is below top of boiler.
AUTOMATIC FILL VALVE (not provided)
For safe, efcient operation, hot water system must be
lled with water. Adding new water, when needed can
be done manually (by use of hand valve in water supply
line). This requires regular attention to system’s needs.
Automatic ll valve or pressure reducing valve accomplishes
this without attention. Install in supply line on hot water
boilers only. Valve operates through water pressure
differentials. It does not require electrical connection.
BURNER SOLENOID VALVE (provided)
Beckett and Carlin oil burner’s use standard solenoid valve.
Upon burner shut down, standard solenoid valve stops
ow of oil to nozzle. Without solenoid valve, oil pump
continues to pump oil to burner nozzle until burner motor
winds down below pumps cutoff speed. Riello oil burner
has delay solenoid valve. Delay solenoid valve provides
same shut down action as standard solenoid valve, plus
on burner start up delay solenoid valve remains closed for
additional 15 seconds. Allows burner fan motor to prepurge combustion chamber and oil pump to bring supply
oil pressure up to its set point helping to provide clean light
off.
CIRCULATOR (provided)
Every forced hot water system requires circulator. Separate
circulator or zone valve is required for each zone, if there
are two or more zones. Circulator must have capacity to
provide circulation required by heating system. Circulator
should be connected to supply main and must be wired
into boiler’s electrical system. See “System Piping” section
for piping congurations with circulator located on supply
main piping using zone circulators or zone valves. When
piping is arranged with zone circulators and no bypass
piping, circulator provided with boiler may be used as
zone circulator. Both piping arrangements allow circulator
to pump away from expansion tank and show how piping
should be arranged to allow heating system to be easily
purged of air.
Taco 007 Pump Curve
LIMIT CONTROL (provided) Refer to manufacturer
instructions provided with limit control
Water temperature limit control in limit is adjustable and
may be set: as low as 140°F so long as return water
temperatures to boiler are no less than 120°F, or as high as
220°F so long as boiler and heating system have adequate
circulation to remove heat from boiler otherwise steam may
be created in boiler. Refer back to “System Piping” section
for more information.
DRAIN VALVE (provided)
Drain valve is manually operated valve provides means of
draining all water from boiler and heating system. It should be
installed in reducing tee where return line enters boiler.
31
Page 32
DUNKIRK BOILERS
DUNKIRK BOILERS
2201 Dwyer Avenue, Utica NY 13501
2201 Dwyer Avenue, Utica NY 13501
web site: www.ecrinternational.com
web site: www.ecrinternational.com