Drolet MONT BLANC Installation And Operating Manual

READ THESE INSTRUCTIONS AND SAVE FOR REFERENCE
000629/45089A
INSTALLATION AND
OPERATING MANUAL
OIL BURNING STOVE
MONT BLANC
Vérified and tested following
CAN/CSA B140.3 et UL 896 standards by:
Intertek Testing Services
Fabricated by:
Stove Builder International Inc
1700 Léon-Harmel Québec, (Québec)
G1N 4R9
Page 1 of 15
TABLE OF CONTENTS
TECHNICAL DATA .............................................................................................................................................. 2
INSTALLATION INSTRUCTIONS ........................................................................................................................ 3
LOCATING THE APPLIANCE ......................................................................................................................... 3
CHIMNEY INFORMATIONS ........................................................................................................................... 4
CONNECTING THE APPLIANCE TO THE CHIMNEY .................................................................................... 5
LEVELLING THE APPLIANCE........................................................................................................................ 6
FIXATION OF THE APPLIANCE TO FLOOR .................................................................................................. 6
CONNECTING APPLIANCE TO OIL TANK .................................................................................................... 7
ADJUSTING THE DRAFT ............................................................................................................................... 8
OPERATION INSTRUCTIONS ............................................................................................................................ 9
COMBUSTIBLE .............................................................................................................................................. 9
LIGHTING ...................................................................................................................................................... 9
CHANGING INTENSITY ............................................................................................................................... 10
TURNING THE APPLIANCE OFF ................................................................................................................. 11
MAINTENANCE............................................................................................................................................ 11
TROUBLESHOOTING GUIDE ...................................................................................................................... 12
SPARE PARTS ................................................................................................................................................. 14
LIMITED WARRANTY ....................................................................................................................................... 16
Page 2 of 15
TECHNICAL DATA
MONT BLANC OIL BURNING STOVE
COMBUSTIBLE : OIL NO 1 OIL NO 2 HEAT INPUT : Kw BTU/h Kw BTU/h
Minimum : 5,9 20 450 5,2 17 700 Maximum : 10,9 37 250 9,6 33 150 FLOWRATE : cc/min litres/h cc/min litres/h Minimum : 9,9 0,60 8,0 0,48 maximun : 17,3 1,04 15,0 0,90
MINIMUM DRAUGHT REQUIRED : 0,06 INWC 0,06 INWC EFFICIENCY : % %
with fan : 74 74,5 without fan : 72 72
CLEARANCES TO COMBUSTIBLES
Mm in
Back 255 10 Side 255 10 Corner 255 10 Top 915 36
A MINIMUM CLEARANCE OF 9’’ (230 mm)
FROM SINGLE WALL FLUE PIPE TO
COMBUSTIBLES MUST BE ALLOWED.
DIMENSIONS
mm in Height : 970 38 ¼ Width : 550 21 ¾ Depth : 685 27 Ø outlet flue pipe : 130 5 Ø burner : 255 10
Glass ( 3 ) : 92 x 250 3
5/8
x 9
7/8
Weight : 91 kg 200 lbs
Page 3 of 15
INSTALLATION INSTRUCTIONS
LOCATING THE APPLIANCE
Position the appliance as close as possible to the chimney.
Many configuration are possible, the most frequent are illustrated in figures 1,2 and 3.
Respect clearances indicated on page 1. They have been tested according to approvals.
Always respect clearances of appliance pipe manufacturers. Larger clearances always prevail.
Figure 1 : CORNER INSTALLATION
Figure 2 : PARALLEL INSTALLATION
Figure 3 : WALL INSTALLATION
Table 1 : CLEARANCES TO COMBUSTIBLES
mm in
Back 180 7 Side 150 6 Corners 150 6 Top 915 36
Flue Pipe 230 9
IMPORTANT: It is essential to ensure that the room in which the appliance is installed is sufficiently ventilated to provide an adequate air supply.
It is possible that if your home is well insulated, that you will have to install an outside fresh air intake.
THE BURNING OF ONE LITRE OF FUEL (OIL) REQUIRES APPROXIMATELY 30 M3 OF AIR AND WILL PRODUCE ABOUT 0.8 KG OF WATER OF WATER VAPOR AND 9 M3 OF CARBONE DIOXIDE AND ATMOSPHERIC NITROGEN. A SOURCE OF AIR FROM THE OUTSIDE IS NEEDED TO REPLACE COMBUSTION AIR.
Page 4 of 15
CHIMNEY INFORMATIONS
Before the hook up of the appliance, inspect the chimney to ensure that it is in good condition and that the quality of the flue will allow a sufficient draft. For a good combustion, refer to the technical data of the appliance to know the minimum draft required.
Factory built (A) or (L) type chimney is approved for this appliance. The chimney has to be well insulated; a chimney with a cold internal surface can prevent a good draft and condensation will occur.
Chimney sections must be of constant diameter. 5" factory built chimney is required An excessively large diameter will produce too great of a volume, which is more difficult to heat.
When the appliance is installed on a masonry chimney witch is often oversize, it’s required to use a stainless steel liner of 5" diameter inside the existing chimney.
The chimney should be no less than 15' high (including appliance pipes). The chimney has to extend no less than 3' above the point it exits the roof and 2' higher than any roof, or any other obstacles within a horizontal distance of 10'.
CHIMNEY MINMUM HEIGHT : Height of chimney should inferior than 15’ (4.6 m).
Figure 4: CHIMNEY MINMUM HEIGHT
CLEARANCES WITH ROOF SUMMIT AND BUILDING NEARBY :
The chimney flue shall extend at least 2’ (0,6 m) above the highest roof surface or structure within 10’ (3,0 m) horizontally of the chimney.
Figure 5: CHIMNEY CLEARANCES
CLEARANCE FROM ROOFING INTERSECTION: The chimney flue shall extend at least 3’ (0,9 m) above the highest point at wich it comes in contact with the roof. ref.: standard B-139 - 4.2.2.11.
YOUR APPLIANCE SHALL BE CONNECTED TO A CHIMNEY WHICH WILL PROVIDE AN ADEQUATE DRAFT AT ALL TIMES TO ENSURE SAFE AND PROPER OPERATION OF THE BURNER
Page 5 of 15
CONNECTING THE APPLIANCE TO THE CHIMNEY
The gases are vented from the back of the appliance. The female part of the black pipe connector has to be installed toward the flue connector of the appliance. Secure all connections with the (3) self taping screws, with 120o distance between each of them.
The connection between appliance pipes and chimney has to be perfectly airtight.
A maximum horizontal lent of 8' is allowed. Make sure to have a 1/4" slope per foot minimum.
Do not use more than two 90o Elbows while connecting the appliance to the chimney.
It is strictly forbidden to pass through combustible materials walls, floors and ceilings with appliance pipe
connectors.
DIRECT HORIZONTAL CONNECTION :
You may choose to connect your appliance to the chimney with an horizontal flue pipe.
Figure 6: HORIZONTAL CONNECTION.
CEILING CONNECTION :
In the case where your chimney starts from the ceiling, use one 90º elbow and the necessary straight sections.
Figure 7: CEILING CONNECTION.
THE CHIMNEY MUST NOT BE SHARED WITH OTHER APPLIANCES
FIX FLUE PIPES TOGETHER WITH METAL SCREWS.
MAKE SURE YOU RESPECT A ¼’’ SLOPE PER FOOT OF HORIZONTAL PIPE LENGTH.
RESPECT CAREFULLY CLEARANCES TO COMBUSTIBLES PRESCRIBED BY FLUE PIPES MANUFACTURERS.
FLUE PIPES CLEARANCES TO COMBUSTIBLES DEPEND ON FLUE PIPES TYPE AND MANUFACTURERS
VERTICAL CONNECTION :
IT is recommended not to use more than two (2) 90º elbows and the necessary straight sections to connect your appliance to the chimney.
Figure 8: VERTICAL CONNECTION.
Loading...
+ 11 hidden pages