
AQUA PLUS Shower / Tub Door Installation Manual
Important
Please read carefully the following instructions before installing your shower door. If you
have any questions on this shower door installation - please call our technical support
specialists Monday to Friday 9:00AM – 5:00PM EST at 1-866-731-8378 Option 3 or e-mail
our technical support group at support@BathAuthority.com
Our product may have changes without prior notice
Rev 2.1
1

Preparation
1. After opening the boxes, read this introduction carefully, check all the packed parts are
complete by cross checking all the components against the “Detailed Diagram of
Shower Door Components”. Examine for shipping damage. If the unit has been
damaged or has a finishing defect, please contact your local distributor within 3
business days. Please note that Bath Authority
TM
/ DreamLine TM will not replace any
damaged product or parts free of charge after 3 business days or if the product
has been installed. Contact your distributor or DreamLine if you have any questions.
2. Please note that you should consult your local building codes on questions on
installation compliance standards. Building and plumbing codes vary by location,
and DreamLine is not responsible for code compliance sta ndards for your project.
3. Please ensure that prior to the installation the floor is leveled and solid. Also make sure
the walls are at right angles. While some adjustment in leveling of the door is possible,
irregular floor level or improper angle of side walls will result in serious problems for
your installation. Please note that there are some adjustments and drilling might be
necessary during the installation process.
Tools Required
Rev 2.1
2

Detailed Diagram of Shower Door Components
7
1
8
9
10
11
12
13
14
2
3
4
5
6
Packing List
01 Wall and glass profiles 1 set 08 Decorative plug 4pcs
02 Stationary glass 1pc 09 Countersunk screw ST 4.2×18 4pcs
03 Support bar 1pc 10 Round head screw ST 4.2×30 6pcs
04 Hinge 2pcs 11 Side strip 1pc
05 Glass door 1pc 12 Bottom anti-water strip 1pc
06 Handle 1pc 13 U-shape seal gasket 1pc
07 Wall anchor 5pcs 14 Screw inside Bottom bracket 1pc
After you have checked that all components are there, you will be ready to start the
installation of your DreamLine shower door.
Rev 2.1
3