ZigBee Gen 2 Module Installation
Guide
Prepared by: Michael Mosca Date: 05/09/2018
Document No.
Revision:
7
ZigBee Gen 2 Module Installation Guide
Q8S-515123UserMan1.docx 1
of 7
ZigBee Gen 2 Module Installation
Guide
Prepared by: Michael Mosca Date: 05/09/2018
Document No.
REVISION HISTORY
Revision:
7
Rev.
1
2
3
4
5
Date Description Made by Checked Approved
11/14/2017
11/20/17
12/21/17 Update FCC-IC Statements
04/16/2018
5/01/2018
6 5/09/2018
7 5/14/2018
Release of document MM GC
Photo on page 3 changed to
MM
GC
correct PCB
MM
Update FCC-IC label LH
Update Installation of FCC-
LH
IC label on inside trim
Correction of FCC / IC label
LH
for Zigbee internal installation
Clarification of instructions
for host user to provide
LH
accurate documentation
required
TABLE OF CONTENTS
1. INSTALL DOUBLE DECKER END CAP .................................................................................................................................... 3
2. LABEL UPGRADES AND ADDITIONS ...................................................................................................................................... 6
2 of 7
ZigBee Gen 2 Module Installation
Guide
Prepared by: Michael Mosca Date: 05/09/2018
1. Install Double Decker End Cap
Install the communication boards as shown.
RF board is in the upper position.
Ensure the wires run through the notch in
the cap so they do not become pinched
when the cap is installed on the chassis.
Document No.
Revision:
7
3 of 7