D.A.S. Aero 2 Series, Aero-20A, Aero-20.120A Rigging Manual

Rigging Manual
AERO-20A / AERO-20.120A
El colgado del equipo sólo debe realizarse ut il iz an do l os he rr aj es de c ol ga do recomendados y por personal cualificado. No cuelgue la caja de las asas. The appliance should be flown only from th e r iggin g p oin ts an d b y qual ified personnel. Do not suspend the box from the handles.
CONTENTS
RIGGING SYSTEM: WARNINGS
4 UNITS MOUNTING ON A PL-20S
ARRAY MOUNTING WITH GROUPS OF 4 UNITS ON A PL-20S
ARRAY DISASSEMBLY IN GROUPS OF 4 UNITS ON A PL-20S
COMBINATION WITH AERO-40A ARRAY
STACKING SYSTEMS
TRANSPORTING
ANNEX I : Tools for rigging systems
ANNEX II : Maximum load capacity for AX-AE20
ANNEX III : Advice for EASE Focus 2 use
3
4 - 10
11 - 19
20 - 23
24 - 26
27 - 28
29 - 32
33
34 - 35
36 - 38
Manual de Colgado / aero series / Rigging Manual
RIGGING SYSTEM
Warning
This manual offers all the necessary information for flying DAS Audio systems. To any operations related to flying a system, read the present document first and act on the warnings and advice given. The goal is to allow the user to become familiar with the mechanical elements required to fly the acoustic system, as well as the safety measures to be taken during set-up and teardown.
Only experienced installers with adequate knowledge of the equipment and local safety regulations should fly speaker boxes. It is the user´s responsibility to ensure that the systems to be flown (including flying accessories) comply with state and local regulations.
The working load limits in this manual are the results of tests by independent laboratories. It is the user´s responsibility to follow and comply with safety factors, resistance values, periodical supervisions and warnings given in this manual. Product improvement by means of research and development is on going at DAS Audio Specifications are subject to change without notice.
It is common practice to apply 5:1 safety factors for enclosures and static elements. For slings and elements exposed to material fatigue due to friction and load variation the following ratios must be met; 5:1 for steel clable slings; 4:1 for steel chain slings and 7:1 for polyester slings. Thus, an element with a breaking load limit of 1000 kg may be statically loaded with 200 kg (5:1 safety factor) and dynamically loaded with 142 kg (7:1 safety factor).
When a system is flying, the working load must be lower than the resistance of each individual flying point in the enclosure, as well as each box. Hanging hardware should be regularly inspected and suspect units replaced if in doubt. This is important to avoid injury and absolutely no risks should be taken in this respect. It is highly recommended that you implement an inspection and maintenance program on flying elements, including reports to be filled out by the personnel that will carry out the inspections. Local regulations may exist that, in case of accident, may require you to prevent evidence of inspection reports and corrective actions after defects were found.
Absolutely no risks should be taken with regards to public safety.
When flying enclosures from ceiling support structures, extreme care should be taken to assure the load bearing capabilities of the structures so that the installation is absolutely safe. Do not fly enclosures from unsafe structures. Consult a certified professional if needed. All flying accessories that are not supplied by DAS Audio are the user´s responsibility. Use at your own risk.
Manual de Colgado / aero series / Rigging Manual
3
4 UNITS MOUNTING ON A PL-20S
The groups of 3 or 4 units are easy to transport by truck as we will see in this section. We will also see the preparation.
If we look at the PL-20S, we will see the two security pins on the sides (see figure). These pins allow to hold the first enclosure to the platform.
Rear part of the
PL-20S platform.
Front part of the
PL-20S platform.
PL-20S
W.L.L.: 160kg
Security pins on
the PL-20S platform side.
Rear part of the
PL-20S platform.
Front part of the
PL-20S platform.
Side view of the PL-20S platform.
Security pins on
the PL-20S platform side.
Front view of the PL-20S platform.
Side view of AERO-20A unit
Looking at the side of AERO-20A unit, we observe the blocking angle trigger.
Warning: Make sure the trigger is hidden,
blocking the angle, so that the box is fixed to the platform safely.
4
Manual de Colgado / aero series / Rigging Manual
When you push the trigger, you will block AERO-20A angles.
Lift the enclosure by the handles and sit it gently over the platform.
Remove the security pins and hold the enclosure with them.
Check that the four security pins are well positioned.
Rear security pins:
REAR LINK
Front security pin
Front security pin
Final mounting of one enclosure on a PL-20S platform.
Manual de Colgado / aero series / Rigging Manual
5
Lets add another enclosure over the previous.
We need to look at the side controls of the enclosure and act on them like in the figure.
We push up the front rods (as seen in the figure), we will deploy them and we will lock them into position. Make sure they are properly locked for safety.
The front rod remains locked, unless you press the front triggers so that we can bring it to its initial position, folded on the side.
The result, platform included, can be seen in the figure below.
Move the front folded rod
Front trigger
Click !
Front rod unfolded
Figure of the enclosure on the platform PL-20S with the rods ready to add another enclosure over it.
6
Manual de Colgado / aero series / Rigging Manual
Now we unlock the angle in the second box, before leaning it on the first (in this configuration the rear trigger is hidden).
To do this we will move the handles on the sides of the box up to the end where you will hear a click.
At that time the rear trigger will come out, the handle will lock, and it will unlock the angle.
Taking the second enclosure by the handles, we will lower it gently upon the first enclosure, until it rests upon it.
Remove the safety pins on each side of the enclosure, and to anchor the enclosure we will use these pins, as shown in the figures.
Note: We can leave the front rods prepared for stacking the third box.
Side handle
Hidden rear trigger
Click !
Front security pins
Visible rear trigger
This figure shows mounting of two enclosures on a PL-20S platform.
Manual de Colgado / aero series / Rigging Manual
7
Once the second enclosure is supported by the first and the front safety pins are positioned, we will choose 7º (which is the maximum possible for this model), with the angle selector and we will put the rear safety pins on the first enclosure (two on each side of the enclosures): put pins in REAR LINK holes of second enclosure and others, in the holes corresponding to 7º angle, on the first enclosure (as shown in the figures below).
Check that all safety pins are located correctly because they will have to withstand the weight of all the enclosures.
Security pins
Security pins
DETAIL
This figure shows final mounting of two enclosures on a PL-20S platform.
8
Manual de Colgado / aero series / Rigging Manual
Now we should unlock the angle in the third enclosure to place it on the second (in this configuration the rear trigger is hidden, as seen on page 7). To do this we will move the handles on the sides of the enclosure up to the end where you will hear a click. At that time the rear trigger will come out, the moved handle will be locked and it will unlock the angle. Taking the third enclosure by the handles, we will lower it gently upon the second enclosure, until it rests upon it. Remove the safety pins on each side of the box and to anchor the enclosure we will use these pins as shown in the figures, on page 7.
Once the third enclosure is supported by the second and the front safety pins are positioned, we will choose also 7º with the angle selector and we will put the rear safety pins on the second enclosure (two on each side of the enclosures): put pins in REAR LINK holes of third enclosure and others, in the holes corresponding to 7º angle, on the second enclosure (as shown in the figures below and as seen on page 8).
Check that all safety pins are located correctly because they will have to withstand the weight of all the enclosures.
These figures show final mounting of three enclosures on a PL-20S platform. We can leave the front rods prepared for stacking the fourth enclosure, only if the group isn't finished.
Manual de Colgado / aero series / Rigging Manual
9
Now we should unlock the angle in the fourth enclosure to place it on the third (in this configuration the rear trigger is hidden, as seen on page 7). To do this we will move the handles on the sides of the enclosure up to the end where you will hear a click. At that time the rear trigger will come out, the moved handle will be locked and it will unlock the angle. Taking the fourth enclosure by the handles, we will lower it gently upon the third enclosure, until it rests upon it. Remove the safety pins on each side of the box and to anchor the enclosure we will use these pins as shown in the figures, on page 7.
Once the fourth enclosure is supported by the third and the front safety pins are positioned, we will choose also 7º with the angle selector and we will put the rear safety pins on the second enclosure (two on each side of the enclosures): put pins in REAR LINK holes of fourth enclosure and others, in the holes corresponding to 7º angle, on the third enclosure (as shown in the figures below and as seen on page 8).
Check that all safety pins are located correctly because they will have to withstand the weight of all the enclosures.
These figures show final mounting of four enclosures on a PL-20S platform. Do not stack more than four boxes so as not to endanger stability.
10
Manual de Colgado / aero series / Rigging Manual
ARRAY MOUNTING WITH GROUPS OF 4 UNITS ON A PL-20S
The groups of 3 or 4 units are easy to transport by truck.
Lets see in this section how to mount an array with groups of four units.
Firstly, we will mount the AX-AE20 onto the top enclosure of the first group of four units.
Therefore, to mount the AX, the rods of the upper unit of the group should be extracted, as explained in the previous section.
The result is shown in the figure at the right.
Then, place the side parts of the AX inserting safety pins, as shown in the figure below.
Check that the security pins are well positioned because they will support the weight of the rest of the enclosures.
Rods
DETAIL
Note:
Select 0º angle and the safety pin should put it to lock the rear rod
RESULT
Manual de Colgado / aero series / Rigging Manual
11
With the help of the Ease Focus software we can determinate which point is the correct one to join the side pieces with the crossbar of the AX-AE20, called PICKUP-AX-AE20, and with the help of the security pins, as shown in figures.
If we use two lift motors, we will use a second PICKUP-AX-AE20 which joins through the same way to the pinpoint marked by Ease Focus software.
Check that the security pins are well positioned.
DETAIL
AX-AE20
W.L.L.: 715 kg
PICKUP-AX-AE20
W.L.L.: 715 kg
RESULT
Lastly, hook the lift motor. In case two lift motors are needed, hook each one to each PICKUP-AX-AE20.
Like in every security operation, use adecuate security elements.
12
Manual de Colgado / aero series / Rigging Manual
Loading...
+ 27 hidden pages