Danfoss Orifice replacement procedure Installation guide

Service Kit Instructions
[18-30 lbf•in]
[1.8-3.3 lbf•in]
Sc
Series 45 Servo and Gain Control Orifices Orifice replacement procedure
Series 45 Electric Proportional Control kits for frames E, F, J, and K2 come from the fac­tory with a 1.2mm gain orice and 0.8mm servo control orice installed in the control assembly. A 1.0mm servo control orice is included in this kit in the event it is required. Also, included in this kit is a 1.0mm and 0.8mm gain control orice in the event it is required.
If the control orices require replacement, please refer to the instructions below.
Servo control orice
1. Remove servo control orice.
replacement
2. Install required servo control orifce, and torque to 2-3.4 N•m [18-30 lbf•in].
Gain control orice
1. Remove solenoid coil nut.
replacement
2. Slide solenoid coil o.
3. Remove control solenoid actuator.
2. Remove plug.
3. Remove gain control orice.
4. Install required gain control orice, and torque to 2-3.4 N•m [18-30 lbf•in].
Solenoid actuator
rews
4 mm
6.5 N•m [4.75 lbf•in]
17 mm
23.0-28.5 N•m [17-21 lbf•in]
Plug
3 mm
2-3.4 N•m [18-30 lbf•in]
Solenoid coil
Solenoid nut
Feature
2.5-4.5 N•m
Gain orifice
Servo control orifice
© Danfoss, 2015 11170669 • Rev BA • May 2017 1
3 mm
2-3.4 N•m
3 mm
2-3.4 N•m [18-30 lbf•in]
Loading...