Danfoss ECmat Aqua Operating guide

Installation Guide
Danfoss ECmat Aqua
electricheating.danfoss.com
Installation Guide Danfoss ECmat Aqua
1 Product specications � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 3
2 Installation instructions � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 5
1.1 Potential application examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 Initial planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2 Preparation and cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.3 Laying the mat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.4 Intermediate test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.5 Covering & nal test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2
| Danfoss © | 2015.09 VIEGG102
Installation Guide Danfoss ECmat Aqua
1 Product specications
Danfoss ECmat Aqua is a hot-water oor heating mat with low construction height (approximately 10mm), which makes it especially suitable for renovation jobs in existing buildings.
The capacity of your Danfoss ECmat Aqua installa­tion is strongly dependent on the capacity of the

1�1 Potential application examples

Substrate
Surface
Floor leveling compound
Anhydride screed
Substrate
Surface
Floor leveling compound Primer
Anhydride screed Primer
Timber ooring (parquet, boarding) or on existing thermal insulation
Load distribution mat, min. 9mm, glued (not screwed)
Load distribution mat, min. 9mm, glued (not screwed)
circulation pump. Please consult your plumber to determine the capacity of your heating system.
Each room with oor heating should be equipped with its own thermostatic room tem­perature control, such as a Danfoss RTL valve with TH function (not included).
Construction height min. 13mm, including pipe
Construction height min. 28mm, including pipe
Screed, concrete, stone, etc�
Construction height min. 13mm, including pipe
Construction height min. 28mm, including pipe
Laid in staggered sections
Laid in staggered sections
Laid in staggered sections
Laid in staggered sections
UK
Please note!
• Consult your plumber for any work on your existing heating system. They have the necessary experience and will be pleased to assist you
• Remember to t expansion joints at the junc­tions of heated and unheated areas
Danfoss © | 2015.09 VIEGG102 |
• Proper thermal insulation of the substrate enhances the performance of Danfoss ECmat Aqua. Take suitable measures before instal­lation.
3
Installation Guide Danfoss ECmat Aqua
Plan: Date:
0,5 м
4
| Danfoss © | 2015.09 VIEGG102
Installation Guide Danfoss ECmat Aqua

2 Installation instructions

Congratulations on the purchase of your new Danfoss product

2�1 Initial planning

Please take the manufacturer’s data into consid­eration with regard to subsequent covering of the heating mat with oor levelling compound, screed or the like. The selected materials must be suitable for use on top of a oor heating system and should have a certain degree of elasticity
Installation is considerably simplied if the tting location for control is specied in the planning stage. The control and accessories, such as the manifold, should remain easily accessible after installation.
Please observe the following installation guide­lines in order to obtain good results and long­term trouble-free operation.
Plan: Follow the Danfoss installation instructions step by step. This will avoid any problems during mat installation and adjustment. Sketch the oor plan of your room on the mat sheet (Figure1)
Draw your Danfoss ECmat Aqua mat (width 48mm) on the oor plan with a separation of 2cm between the runs. The woven glass net can be cut as necessary to change directions (Figure2).
Figure 2
UK
Figure 1

2�2 Preparation and cleaning

Before installing the heating mat, you must pre­pare the oor surface (Figure3).
Danfoss © | 2015.09 VIEGG102 |
Transfer the markings from your drawing to the oor so you can see exactly where you should start and stop
The substrate must be level, structurally sound, and free from dust, grease and oil.
5
Installation Guide Danfoss ECmat Aqua
You should preferably start laying the heating mat close to the connection point.
All connections should remain readily accessible afterwards.
Always connect the RTL valve (not included) to the end of the hose (supply line), not to the start.
If you use an RTL control with TH function to
Figure 3
It may be necessary to apply a bonding agent (primer), depending on the substrate. This ensures proper bonding of the heating mat.

2�3 Laying the mat

Remove the protective lm from the mat and roll it out according to your oor plan, with the self-
adhesive side facing down (Figure4).
adjust the room temperature, install the RTL valve (not included) ahead of the heating mat (see the
installation instructions for Danfoss controls).
Figure 5a
The length of the pipe attached to woven mat has been selected to match the required connection
Figure 4
When you encounter an obstacle (wall, cabinet, toilet, end of the room, etc.), cut the woven glass net (but not the pipe) and continue laying in another direction (Figures5a & 5b).
length.
The pipe length is calculated to ensure that in the worst case, you can always return the pipe along the same path as you used when rolling out the mat.
You can use the pipe couplings and angle connec­tors available as accessories to replace a damaged pipe section or extend a pipe that is too short, if necessary.
6
| Danfoss © | 2015.09 VIEGG102
Installation Guide Danfoss ECmat Aqua
Before lengthening the pipe, you should obtain the approval of your plumber.
Figure 5b
If you intend to install several Danfoss ECmat Aqua mats in the same room, you must select the right distributor in advance.
Distributors are available for installation of a single mat as well as for installation of two or three mats.

2�4 Intermediate test

After completing all the installation steps, you should recheck the entire procedure.
Note that when more than one mat is installed, all mats must be the same size�
Examples:
5m² = 2 x 2.5m², corresponding to 2 x 3m² (mats must be shortened)
6m² = 2 x 3m², corresponding to 2 x 3m² (pack­ing unit)
7m² = 3 x 2.33m², corresponding to 3 x 3m² (mats must be shortened)
At this point you should have arrived at the mani­fold with the ends of the connecting lines. Cut the pipes to length with straight, unchamfered and burr-free edges. This is necessary to ensure secure tting of the connector components.
Note: Push the ends of the connecting lines into the manifold until they reach the stop.
Attached pipes can be disconnected by slightly lifting the locking ring. This intelligent technology eliminates the need for tools.
The piping of the Danfoss ECmat Aqua mat should now become warm.
UK
Check that all parts have been installed or connected properly. Are all connectors rmly secured?
Start up your heating system again with the RTL valve (not included) closed.
After slowly lling the system with water, check all connections and joints for leaks (visually or by touch).
Danfoss © | 2015.09 VIEGG102 |
Correct any installation errors by following the above procedure, and then repeat the leak test.
If everything is okay, close the RTL valve (not included) for the Danfoss ECMat Aqua.
(See also the installation instructions for Danfoss controls.)
This intermediate test must be performed before the mat is covered with oor levelling compound or screed.
7
Installation Guide Danfoss ECmat Aqua
2�5 Covering & nal test
After the mats have been laid as desired, press them rmly against the oor again to ensure good adhesion.
the manufacturer’s data for the materials that are used (Figures6 & 7).
Figure 6
Then cover the mats with an elastic levelling compound, levelling ller or the like. Observe
Figure 7
The oor heating should be switched o dur­ing the curing phase�
8
| Danfoss © | 2015.09 VIEGG102
Installation Guide Danfoss ECmat Aqua
UK
Produced by Danfoss © 09/2015 VIEGG102 |
Produced by Danfoss © 09/2015 VIEGG102 |
9
9
Installation Guide Danfoss ECmat Aqua
10
10
| Produced by Danfoss © 09/2015 VIEGG102
| Produced by Danfoss © 09/2015 VIEGG102
Installation Guide Danfoss ECmat Aqua
UK
Produced by Danfoss © 09/2015 VIEGG102 |
Produced by Danfoss © 09/2015 VIEGG102 |
11
11
Danfoss A/S
Danfoss can accept no responsibility for possible errors in catalogues, brochures and other printed material. Danfoss reserves already on order provided that such alterations can be made without subsequential changes being necessary in specications alre companies. DEVI and the DEVI logotype are trademarks of Danfoss A/S. All rights reserved.
Electric Heating Systems Ulvehavevej 61 7100 Vejle Denmark
Phone: +45 7488 8500 Fax: +45 7488 8501 E-mail: EH@danfoss.com http://electricheating.danfoss.com
12
| Danfoss | 2015.08 08090506 | VIEGG10M
the right to alter its products without notice. This also applies to products
ady agreed. All trademarks in this material are property of the respective
Loading...